Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000321/1986004 + (ML20211H191)
- ML20211H192 + (ML20211H192)
- ML20211H193 + (ML20211H193)
- ML20211H194 + (ML20211H194)
- ML20211H195 + (ML20211H195)
- ST-HL-AE-1928, Forwards Annotated Revs to FSAR Table 9.4-2.3, Design Data for Mechanical Auxiliary Bldg (Mab) HVAC Sys, Revising Airflow Rates to Accommodate Mab Clothes Dryers.Changes Will Be Incorporated Into FSAR Amend 59 + (ML20211H197)
- ML20211H200 + (ML20211H200)
- 05000338/LER-1987-001-01, :on 870127,7-day Period Allowed for Fire Pump to Be Out of Svc Exceeded.Caused by Inclement Weather & Further Repair Efforts.Pump Returned to Svc on 870213.W/ + (ML20211H204)
- 05000354/LER-1986-023, :on 860519,Channel B ESF Actuation Occurred Due to Spurious Low Reactor Water Level Signals.Caused by Personnel Error.Mgt Will Discuss Awareness of Need to Exercise Care When Valving Transmitters + (ML20211H206)
- ML20211H207 + (ML20211H207)
- ML20211H208 + (ML20211H208)
- 05000247/LER-1986-014, :on 860518,seismic Restraint SR-1092 Disconnected.Caused by Failure of Maint Procedure for Reactor Coolant Pump Seal Overhaul to Assure Reinstallation of SR-1092.Procedure Revised + (ML20211H210)
- ML20211H211 + (ML20211H211)
- ML20211H212 + (ML20211H212)
- ML20211H213 + (ML20211H213)
- 05000315/LER-1986-002, :on 860217,discovered That Three Reactor Trip Sys Interlock Setpoints Not Set Per Tech Spec Requirements. Caused by Misinterpretation of Tech Specs.Procedures Revised to Agree W/Tech Specs + (ML20211H215)
- ML20211H216 + (ML20211H216)
- 05000304/LER-1985-028-01, LER Number 85-028 Used to Rept Loss of RHR Cooling Flow.Ltr Should Be Disregarded + (ML20211H219)
- ML20211H220 + (ML20211H220)
- ML20211H221 + (ML20211H221)
- ML20211H222 + (ML20211H222)
- ML20211H223 + (ML20211H223)
- ML20211H226 + (ML20211H226)
- ML20211H229 + (ML20211H229)
- ML20211H230 + (ML20211H230)
- ML20211H232 + (ML20211H232)
- ML20211H235 + (ML20211H235)
- ML20211H236 + (ML20211H236)
- ML20211H238 + (ML20211H238)
- ST-HL-AE-1705, Submits Revised Response to IE Bulletin 77-07, Containment Electrical Penetration Assemblies at Nuclear Power Plants Under Const. Util Electrical Penetration Suppliers Are Westinghouse & Conax Buffalo Corp + (ML20211H244)
- ML20211H246 + (ML20211H246)
- A06347, Forwards Fee for 861124 Request for Deferrment of Completion of Switchgear Room Halon Sys Mods to 1987 Refueling Outage or First Outage of Last 8 Wk Duration Commencing After 870101 + (ML20211H247)
- ML20211H248 + (ML20211H248)
- ML20211H249 + (ML20211H249)
- ML20211H251 + (ML20211H251)
- ML20211H252 + (ML20211H252)
- 05000263/LER-1986-014, :on 860515,reactor Protection Sys Trip Occurred.Caused by Noise Spike on Intermediate power- Range Monitor 14 Tripping Channel a of Reactor Protection Sys.Channel a Trip Reset + (ML20211H253)
- ML20211H257 + (ML20211H257)
- ML20211H258 + (ML20211H258)
- ML20211H264 + (ML20211H264)
- ML20211H266 + (ML20211H266)
- ML20211H267 + (ML20211H267)
- ML20211H268 + (ML20211H268)
- ST-HL-AE-1858, Forwards Vols 1-3 of Electrical Separation Verification Test Rept... Used by Wyle Labs to Demonstrate That Sys Test Procedure in Compliance W/Requirements of Reg Guide 1.75,per SER Open Item 9 + (ML20211H272)
- ML20211H273 + (ML20211H273)
- ML20211H274 + (ML20211H274)
- B12284, Application for Amend to License DPR-65,providing Limiting Conditions & Surveillance Requirements in Accordance W/ NUREG-0737 & Generic Ltr 83-37.Fee Paid + (ML20211H279)
- 05000312/LER-1987-010, :on 870119,electrical Configuration for RCS High Point Valves Found in Noncompliance w/10CFR50,App R. Caused by Inadequate Assessment of Hot Short Effects.Design of Valves Will Be Modified,Per 10CFR50,App R + (ML20211H280)
- ML20211H282 + (ML20211H282)
- ST-HL-AE-1919, Forwards Revised FSAR Table 3.11-1, Environ Conditions, Incorporating Revs to Bechtel Design Criteria & Results of Calculation Verification.Revised Table Will Be Incorporated as Part of Amend 58 to FSAR + (ML20211H283)
- ML20211H284 + (ML20211H284)