Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20211H156 + (ML20211H156)
- ML20211H157 + (ML20211H157)
- ML20211H159 + (ML20211H159)
- IR 05000482/1999016 + (ML20211H161)
- ML20211H162 + (ML20211H162)
- 05000440/LER-1987-004, :on 870127,unexpected Reactor Protection Sys Actuation Occurred Due to Upscale Trips on Intermediate Range Neutron Monitors.Caused by Personnel Error.Warning Sign Will Be Posted & Individuals Counseled + (ML20211H163)
- ML20211H164 + (ML20211H164)
- ML20211H165 + (ML20211H165)
- 05000302/LER-1997-028, :on 970902,flow Element Accuracy Uncertainty That May Be Greater than Assumed Identified.Caused by Design Error.No Immediate Corrective Actions Necessary.Testing of Existing Flow Elements to Be Completed by 971031 + (ML20211H167)
- ML20211H169 + (ML20211H169)
- ML20211H170 + (ML20211H170)
- ML20211H174 + (ML20211H174)
- ML20211H175 + (ML20211H175)
- ML20211H176 + (ML20211H176)
- ML20211H177 + (ML20211H177)
- ML20211H178 + (ML20211H178)
- ML20211H180 + (ML20211H180)
- TXX-6066, Interim Deficiency Rept CP-86-69 Re Failure to Incorporate Restraining/Support Requirements Into Project Procedures & Specs.Initially Reported on 861002.Evaluation to Determine IEEE 420 Applicability Underway.Next Rept by 861219 + (ML20211H181)
- ML20211H182 + (ML20211H182)
- ML20211H186 + (ML20211H186)
- ML20211H187 + (ML20211H187)
- ML20211H190 + (ML20211H190)
- IR 05000321/1986004 + (ML20211H191)
- ML20211H192 + (ML20211H192)
- ML20211H193 + (ML20211H193)
- ML20211H194 + (ML20211H194)
- ML20211H195 + (ML20211H195)
- ST-HL-AE-1928, Forwards Annotated Revs to FSAR Table 9.4-2.3, Design Data for Mechanical Auxiliary Bldg (Mab) HVAC Sys, Revising Airflow Rates to Accommodate Mab Clothes Dryers.Changes Will Be Incorporated Into FSAR Amend 59 + (ML20211H197)
- ML20211H200 + (ML20211H200)
- 05000338/LER-1987-001-01, :on 870127,7-day Period Allowed for Fire Pump to Be Out of Svc Exceeded.Caused by Inclement Weather & Further Repair Efforts.Pump Returned to Svc on 870213.W/ + (ML20211H204)
- 05000354/LER-1986-023, :on 860519,Channel B ESF Actuation Occurred Due to Spurious Low Reactor Water Level Signals.Caused by Personnel Error.Mgt Will Discuss Awareness of Need to Exercise Care When Valving Transmitters + (ML20211H206)
- ML20211H207 + (ML20211H207)
- ML20211H208 + (ML20211H208)
- 05000247/LER-1986-014, :on 860518,seismic Restraint SR-1092 Disconnected.Caused by Failure of Maint Procedure for Reactor Coolant Pump Seal Overhaul to Assure Reinstallation of SR-1092.Procedure Revised + (ML20211H210)
- ML20211H211 + (ML20211H211)
- ML20211H212 + (ML20211H212)
- ML20211H213 + (ML20211H213)
- 05000315/LER-1986-002, :on 860217,discovered That Three Reactor Trip Sys Interlock Setpoints Not Set Per Tech Spec Requirements. Caused by Misinterpretation of Tech Specs.Procedures Revised to Agree W/Tech Specs + (ML20211H215)
- ML20211H216 + (ML20211H216)
- 05000304/LER-1985-028-01, LER Number 85-028 Used to Rept Loss of RHR Cooling Flow.Ltr Should Be Disregarded + (ML20211H219)
- ML20211H220 + (ML20211H220)
- ML20211H221 + (ML20211H221)
- ML20211H222 + (ML20211H222)
- ML20211H223 + (ML20211H223)
- ML20211H226 + (ML20211H226)
- ML20211H229 + (ML20211H229)
- ML20211H230 + (ML20211H230)
- ML20211H232 + (ML20211H232)
- ML20211H235 + (ML20211H235)
- ML20211H236 + (ML20211H236)
- ML20211H238 + (ML20211H238)