Text
. _ _ _
OPERATING DATA REPORT Docket No. 50-317 Date:
June 10, 1986 Completed by R. Porter Telephone: (301) 260-4868 OPERATING STATUS
- 1. Unit Name:
Calvert Cliffs No. 1
- 2. Reporting Period:
APRIL
- 3. Licensed Thermal Power (MWT):
2,700
- 4. Nameplate Rating (Gross MWe):
918 5.
Design Electrical Rating (Net MWe):
845
- 6. Maximum Dependable Capacity (Gross Mwe):
860
- 7. Maximum Dependable Capacity (Net MWe) :
825 8.
Change in Capacity Ratings:
None
- 9. Power Level to Which Restricted (Net MWe):
N/A
- 10. Reasons for Restrictions:
N/A This Month Yr-to-Date Cumulative
- 11. Hours in Reporting Period 719 2,879 96,252
- 12. Number of Hours Reactor was Critical 719.0 2,712.4 75,577.9
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 3,019.4
- 14. Hours Generator On-Line 719.0 2,692.5 74,052.0
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 1,927,356 7,158,681 184,482,874
- 17. Gross Electrical Energy Generated (MWH) 653,089 2,424,289 61,027,101
- 18. Net Electrical Energy Generated (MWH) 626,851 2,323,835 58,240,130 l
- 19. Unit Service Factor 100.0 93.5 76.9
- 20. Unit Availability Factor 100.0 93.5 76.9
- 21. Unit Capacity Factor (Using MDC Net) 105.7 97.8 73.8
- 22. Unit Capacity Factor (Using DER Net) 103.2 95.5 71.6
- 23. Unit Forced Outage Rate 0.0 6.5 9.0
- 24. Shutdowns Scheduled Over Next Six Months (type, date and duration):
(
Refueling Outage October 25, 1986 - January 4, 1987
- 25. If Shutdown at End of Report Period, Estimated Date of Startup:
N/A l
l R
l OPERATING DATA REPORT f
f' Docket No. 50-318 Date:
June 10, 1986 Completed by R. Porter Telephone: (301) 260-4868 OPERATING STATUS
- 1. Unit Name:
Calvert Cliffs No. 2
- 2. Reporting Period:
APRIL 4
1
- 3. Licensed Thermal Power (MWT):
2,700
- 4. Nameplate Rating (Gross MWe):
918
- 5. Design Electrical Rating (Net MWe):
845
- 6. Maximum Dependable Capacity (Gross Mwe):
860
- 7. Maximum Dependable Capacity (Net MWe):
825 8.
Change in Capacity Ratings:
None
- 9. Power Level to Which Restricted (Net MWe):
N/A
- 10. Reasons for Restrictions:
N/A This Month Yr-to-Date Cumulative
}
)
- 11. Hours in Reporting Period 719 2,879 79,607
- 12. Number of Hours Reactor was Critical 719.0 2,837.6 66,280.6
- 13. Reactor Reserve Shutdown Hours 0.0 24.3 1,285.0
- 14. Hours Generator On-Line 719.0 2,832.4 65,243.7
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 1,937,090 7,481,668 163,963,704
- 17. Gross Electrical Energy Generated (MWH) 650,280 2,536,838 54,058,362
- 18. Net Electrical Energy Generated (MWH) 624,442 2,433,620 51,583,877
- 19. Unit Service Factor 100.0 98.4 82.0
~
- 20. Unit Availability Factor 100.0 98.4 82.0 l
21.. Unit Capacity Factor (Using MDC Net) 105.3 102.5 78.7
- 22. Unit Capacity Factor (Using DER Net) 102.8 100.0 76.7
- 23. Unit Forced Outage Rate 0.0 0.7 5.9
- 24. Shutdowns Scheduled Over Next Six Months (type, date and duration):
None i
- 25. If Shutdown at End of Report Period, Estimated Date of.Startup:
N/A'
.-. -...-, - _. -