Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20210F658 + (ML20210F658)
- ML20210F659 + (ML20210F659)
- L-99-123, NPDES Discharge Monitoring Rept for June 1999 for BVPS, Units 1 & 2. with + (ML20210F662)
- ML20210F664 + (ML20210F664)
- ML20210F665 + (ML20210F665)
- ML20210F668 + (ML20210F668)
- ML20210F673 + (ML20210F673)
- ML20210F676 + (ML20210F676)
- ML20210F682 + (ML20210F682)
- RC-99-0147, Submits Attached Request for Relief from Performing SG PORV Strike Time Testing to Acceptance Criteria of Asme/Ansi OMa-1988 + (ML20210F686)
- ML20210F689 + (ML20210F689)
- ML20210F693 + (ML20210F693)
- ML20210F694 + (ML20210F694)
- ML20210F698 + (ML20210F698)
- ML20210F702 + (ML20210F702)
- 05000219/LER-1987-001, :on 870102,discovered That No Clamp Circuit Exists in APRM Rod Block Circuitry to Limit Recirculation Flow Setpoint to 108%.Caused by Inconsistency Between Tech Specs & Installed Hardware + (ML20210F706)
- 05000255/LER-1986-013, :on 860225,reactor Protection Sys Actuation Occurred from Spike in Nuclear Instrument Channel.Caused by Reenergization of Preferred Ac Bus During Manual Transfer. Procedural Controls Instituted + (ML20210F708)
- ML20210F710 + (ML20210F710)
- ML20210F713 + (ML20210F713)
- 05000315/LER-1987-001, :on 870112,determined That Calibr of Radioactive Liquid Effluent Monitors Did Not Literally Comply W/Tech Spec Surveillance Requirement 4.3.3.9.2.Caused by Misinterpretation of Measurement Range + (ML20210F716)
- 05000348/LER-1987-003, :on 870109,reactor Tripped on lo-lo Steam Generator Level Following Manual Tripping of Main Turbine. Caused by Failure to Monitor Steam Generator Feed Pumps Suction Pressure Adequately.Procedure Revised + (ML20210F719)
- ML20210F722 + (ML20210F722)
- ML20210F724 + (ML20210F724)
- ML20210F727 + (ML20210F727)
- ML20210F732 + (ML20210F732)
- ML20210F735 + (ML20210F735)
- ML20210F741 + (ML20210F741)
- ST-HL-AE-1625, Final Deficiency Rept Re Elgar Corp 25 Kv a Static Inverters.Initially Reported on 860218.Elgar Proposed Mod to Provide Direct Physical Contact Between Current Carrying Components.Item Not Reportable Per 10CFR50.55(e) + (ML20210F742)
- ML20210F745 + (ML20210F745)
- IR 05000313/1986035 + (ML20210F748)
- ML20210F752 + (ML20210F752)
- 05000263/LER-1986-007, :on 860224,EFT Sys (Control Room HVAC) Transferred to Toxic Chemical Emergency Mode Due to Chlorine Monitor Tape Break,Resulting in Monitor Trip.Caused by Worn Pinch Roller.Roller Replaced & Head Cleaned + (ML20210F755)
- IR 05000219/1986041 + (ML20210F757)
- IR 05000327/1986047 + (ML20210F758)
- ML20210F762 + (ML20210F762)
- 05000302/LER-1986-025, :on 861214,discovered That Three Breakers Tying Facility Into 230 Kv Switchyard Lacked Independent Power Sources.Caused by Personnel Error.Wiring Changed & Portion of Electrical Design Section of FSAR Revised + (ML20210F763)
- ML20210F764 + (ML20210F764)
- ML20210F767 + (ML20210F767)
- ML20210F774 + (ML20210F774)
- ML20210F777 + (ML20210F777)
- ML20210F790 + (ML20210F790)
- IR 05000254/1986011 + (ML20210F793)
- ML20210F795 + (ML20210F795)
- B12257, Requests That Distribution List for NRC Correspondence Be Revised.Listed Individuals Should Be Deleted from Generic IE Correspondence & Correspondence from Region I to Util + (ML20210F800)
- ML20210F801 + (ML20210F801)
- ML20210F803 + (ML20210F803)
- IR 05000213/1986022 + (ML20210F809)
- ML20210F812 + (ML20210F812)
- TXX-6270, Forwards Addl Info Re Bisco Electrical Penetration Seals & Penetration Switches,Per IE Bulletin 79-28 & 870201 & 06 Requests.Related Documentation Encl + (ML20210F821)
- ML20210F822 + (ML20210F822)
- 05000416/LER-1986-008, :on 860224,discovered That Surveillance Procedures Did Not Adequately Test for Complete Response Time of end-of-cycle Recirculation Pump Trip Sys.Caused by Unclear Tech Spec Note.Tech Spec to Be Changed + (ML20210F824)