- ML20207M754 + (ML20207M754)
- ML20207M756 + (ML20207M756)
- ML20207M759 + (ML20207M759)
- ML20207M760 + (ML20207M760)
- ML20207M761 + (ML20207M761)
- ML20207M762 + (ML20207M762)
- ML20207M764 + (ML20207M764)
- 05000324/LER-1986-026-01, :on 861211,fire Watches Performed 15 Minutes Late.Caused by Restricted Access to Affected Fire Watch Areas Due to Radiological Spill Onto 50-ft Elevation Floor. Fire Watches Conducted & Personnel Disciplined + (ML20207M766)
- ST-HL-AE-1868, Forwards Updated Status of Items That Will Not Be Completed at Fuel Load.Remaining Const Will Be Limited to Planned Retrofits Which Will Be Controlled to Avoid Interfering W/ Safe Operation + (ML20207M768)
- ML20207M769 + (ML20207M769)
- ML20207M770 + (ML20207M770)
- 05000374/LER-1986-018-07, :on 861209,RCIC Steam Line High Flow Isolation Switch PDS-2E31-N013BB Found Nonfunctional.Caused by Torn Diaphragm Inside Switch.New Static O-Ring Differential Pressure Switch Certified & Installed + (ML20207M771)
- ML20207M773 + (ML20207M773)
- 05000312/LER-1985-016-01, Corrected Pages of Rev 1 to LER 85-016-01 + (ML20207M774)
- ML20207M775 + (ML20207M775)
- ML20207M777 + (ML20207M777)
- ML20207M780 + (ML20207M780)
- ML20207M783 + (ML20207M783)
- ML20207M788 + (ML20207M788)
- ST-HL-AE-1867, Forwards Justification for Proposed Tech Specs Identified for Further Comment or Resolution During 861117-21 Site Visit.Pending NRC Agreement,Revs Will Be Included in Future FSAR or Fire Hazards Analysis Rept Amend + (ML20207M791)
- ML20207M793 + (ML20207M793)
- ML20207M794 + (ML20207M794)
- ML20207M795 + (ML20207M795)
- PY-CEI-NRR-2367, Forwards Rev 26 to Perry Nuclear Power Plant Security Plan, Per 10CFR50.54(p)(2).Util Determined That Changes Do Not Decrease Effectiveness of Plan.Encl Withheld,Per 10CFR73.21 + (ML20207M799)
- 05000260/LER-1986-015-02, :on 861209,Trains a & C of Standby Gas Treatment Sys & Train a of Control Room Emergency Ventilation Actuated.Caused by Failed Coil in Relay.Coil Replaced & Safety Sys Reset + (ML20207M802)
- ML20207M803 + (ML20207M803)
- ML20207M804 + (ML20207M804)
- ML20207M805 + (ML20207M805)
- ML20207M807 + (ML20207M807)
- 05000354/LER-1986-094, :on 861210,inadvertent Isolation of RWCU Sys Occurred.Caused by Air Bubbles in Differential Flow Transmitter in Channel A.Steam Leak Isolation Sys Will Be Monitored to Identify Entrapped Air Problems + (ML20207M809)
- ML20207M810 + (ML20207M810)
- PNO-III-87-004, rept Submitted on 870107 to State of Oh Governor Rf Celeste Re Emergency Planning at Facilities Recommended That Plants Be Limited to 5% Power Until Emergency Planning Deficiencies Corrected + (ML20207M812)
- ML20207M813 + (ML20207M813)
- ML20207M814 + (ML20207M814)
- ML20207M815 + (ML20207M815)
- ML20207M817 + (ML20207M817)
- 05000334/LER-1988-015, :on 880912,while Increasing River Water Sys Flow Through Reactor Plant Component Cooling Water HX 1C, River Water Pressure Dropped Below 20 Psig,Causing Start of Standby River Water Pump + (ML20207M818)
- ML20207M820 + (ML20207M820)
- ML20207M822 + (ML20207M822)
- 05000454/LER-1986-033-03, :on 861209,post-maint Visual Leak Test Not Performed,Violating Tech Spec.Caused by Defective Procedure. Project Const Now Working Under Station Nuclear Work Request Program + (ML20207M823)
- ML20207M824 + (ML20207M824)
- ML20207M825 + (ML20207M825)
- ML20207M826 + (ML20207M826)
- ML20207M827 + (ML20207M827)
- ML20207M829 + (ML20207M829)
- ML20207M830 + (ML20207M830)
- ML20207M832 + (ML20207M832)
- ML20207M835 + (ML20207M835)
- B12374, Submits Addl Info Re 820301 & 0716 Requests for Exemption from 10CFR50,App R Requirements for Cable Vault.Alternate Fire Protection Configuration Provides Reasonable Assurance That One Safe Shutdown Div Will Be Free of Fire Damage + (ML20207M836)
- NOC-AE-000468, Monthly Operating Repts for Feb 1999 for South Texas Project Electric Generating Station.With + (ML20207M837)
- ML20207M838 + (ML20207M838)