Monthly Operating Rept for Sept 1988 for VC Summer
ML20207M770
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 09/30/1988
From: Bradham O, Haltiwanger J
SOUTH CAROLINA ELECTRIC & GAS CO.
To: Barry L
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8810180362
Download: ML20207M770 (5)


Text

,.

9.

9a

, ' ~

Document Control Desk September Monthly Operating Report

Page;l ia' I, 4' ATTACHMENT I

/

AVERAGE DAILY UNIT. POWER LEVEL t

DOCKET NO.:

50/395 UNIT:. V. C. SUMMER I DATE:

10/03/88 COMPLETE 0'BY:

J. W. HALTIWANGER TELEPHONE:

(803) 34i-4297 SEPTEMBER 1988 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE dally POWER LEVEL

'(MWe-Net)

(MWe-Net) 1.

881 17.

-34 2.

880 18.

-33 3.

382 19.

-34 4.

882 20.

-33 5,

882 21.

-29 6,

881 22.

-20 7.

882 23.

-18 8.

883 24.

-16 9.

883 25.

-13 10.

883 26.

-13 11.

883 27.

-12 12, 883 28.

-12 13.

882 29.

-12 14.

880 30.

-12 15.

879 16.

814 8s10180362 880930 767y

{DR ADOCK0500g5

+...

.g a

Document Control Desk September Monthly Operating Report Page 2 ATTACHMENT II OPERATING DATA REPORT DOCKET NO.:

50/395 UNIT:

V. C. SUMMER I DATE:

10/03/88 COMPLETED BY:

J. W. HALTIWANGER TELEPHONE:

(803) 345-4297

. 0PERATING STATUS

1. Reporting Period:

September 1988 Gross Hours in Reporting Period:

720

2. Currently Authorized Power Level (MWt): 2775 Max. Depend. Capacity (MWe-Net):

885 Design Electrical Rating (MWe-Net):

900

3. Power Level to Wnich Restricted (If Any)(MWe-Net):

N/A

4. Reasons for Restrictions: N/A THIS MONTH YR TO DATE CUMULATIVE 5.. Number of Hours Reactor Critical 383.8 5936.4 32605 3 t
6. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
7. Hours Generator on Line 383.6

__5898.5 32026.6

8. Unit Reserve Shutdown Hours 0.0 0.0 0.0
9. Gross Thermal Energy Generated (MWH) 1060457 1600^332 84788012
10. Gross Electrical Energy (MWH) 351080

_5303170 28132619

11. Het Electrical Energy Generated (MWH) 329857 5068157 26803331
12. Reactor Service Factor 53.3 90.3 78.3
13. Reactor Availability Factor 53.3 90.3 78.3
14. Unit Service Factor 53.3

'89.7 76.9

15. Unit Availability Factor 53.3 89.1 76.9
16. Unit Capacity Factor (Using MDC) 51.8 87 1 72.7 1
17. Unit Capacity Factor (Design MWe) 50.9 85.6 71.5
18. Unit Forced Octage Rate 0.0 5.5 6.3 Shutdowns Scheduled Over Next 6 Months (Type, Date & Duration of Each):

4*'2e_ lino Outaae. September 16. 1988. restart scheduled November 30. 1988,

.. onut Down at End of Report Period, Estimated Oate of Startup:

s.

November 30. 1988

21. Units in Test Status (Prior to Commercial Operation):

N/A t

k-

4 Document Control Desk September Monthly Operating Report Page 3 ATTACHMENT III UNIT SHUTOOWNS AND POWER REDUCTIONS DOCKET N0.:

50/395 UNIT:

V. C. SUMMER I DATE:

10/03/88 COMPLETED BY:

J. W. HALTIWANGER TELEPHONE:

(803) 345-4297 September 1988 Method of TYPE Shutting F or S Duration Down the Corrective Actions /

No.

Date Reason Forced or (Hours)

Reactor or Comments Scheduled Reducing Power 8

880916 5

336.4 C

1 Refueling i

i e

, -. ~. _

i'.

,. :- M E

I:

Document Control Desk September Monthly Operating Report Page 4 ATTACHMENT IV NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.:

50/395 UNIT:

V. C. SUMMER I DATE:

10/03/88' COMPLETED BY:

J..W. HALTIWANGER TELEPHONE:

-(803) 345-4297 September 1988 V. C. Summer Nuclear Station Unit 1, operated at approximately 100 percent power for the first 15 days of. September, 1988. On September 16, the. plant was shut down for a refueling outage.

10CFR50.36 s.

h Carolina Electric & Gas Company I

. adham gingvgegC M65 Nuclear Operations i

SCE&G October 11, 1988 Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555 Attention: Mr. Learned W. Barry

SUBJECT:

Virgil C. Summer Nuclear Station Docket No. 50/395 Operating License No. NPF-12 September Monthly Operating Report Gentlemen:

Please find enclosed the September 1988 Monthly Operating Report for the Virgil C. Summer Nuclear Station Unit No. 1.

This submittal is made in accordance with the requirements of Technical Specifications, Section 6.9.1.10.

If there are any questions, please call me at your convenience.

Very truly yours, J O L G d. 4. g

0. S. Bradha:n AMM/JWH/0tJ3:1cd Attachments c:

D. A. Nauman/J. G. Connelly, Jr./0. W. Dixon, Jr./T. C. Nichols, Jr.

E. C. Roberts W. A. Williams, Jr.

INPO Records Center Regional Administrator ANI Library J. J. Hayes, Jr.

L. N. Carter General Managers R. E. Rainear C. A. Price /R. M. Campbell, Jr.

J. W. Flitter R. B. Clary Marsh & McLennan K. E. Nodland NSRC J. C. Snelson NPCF G. O. Percival RTS (RG880002)

R. L. Prevatte File (818.03-1)

J. B. Knotts, Jr.

k