Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20206J253 + (ML20206J253)
- ML20206J254 + (ML20206J254)
- ML20206J255 + (ML20206J255)
- IR 05000454/1987014 + (ML20206J256)
- ML20206J257 + (ML20206J257)
- ML20206J258 + (ML20206J258)
- ML20206J260 + (ML20206J260)
- A05796, Responds to NRC Re Violations Noted in Insp Rept 50-423/85-74.Corrective Actions:Design Calculations Involving Reactor Coolant Pump P-1 Snubber Support Revised. Fig 1 of Reactor Coolant Pump Encl + (ML20206J261)
- ML20206J262 + (ML20206J262)
- ML20206J264 + (ML20206J264)
- ML20206J266 + (ML20206J266)
- 05000285/LER-1988-028, :on 881020,failure of YCV-1045A Instrument Air Check Valve.Caused by a Metal Particle Lodged in Valve Seat.Air Check Valve Bench Tested & Successfully Passed + (ML20206J267)
- ML20206J269 + (ML20206J269)
- ML20206J270 + (ML20206J270)
- ML20206J276 + (ML20206J276)
- 05000285/LER-1988-027, :on 881020,steamfitter Disabled by Heat Exhaustion After Exiting Steam Generator.Caused by Contamination of Protective Clothing.First Aid Provided & Victim Taken to Hosp for Medical Treatment + (ML20206J277)
- ML20206J278 + (ML20206J278)
- ML20206J279 + (ML20206J279)
- ML20206J280 + (ML20206J280)
- ML20206J282 + (ML20206J282)
- ML20206J283 + (ML20206J283)
- ML20206J286 + (ML20206J286)
- ML20206J287 + (ML20206J287)
- ML20206J288 + (ML20206J288)
- ML20206J291 + (ML20206J291)
- ML20206J293 + (ML20206J293)
- NG-99-0598, Application for Amend to License DPR-49,revising TS Surveillance Requirement 3.4.3.1 to Implement More Appropriate Safety Valve & Safety Relief Valve Setpoint Tolerances + (ML20206J296)
- ML20206J297 + (ML20206J297)
- ML20206J300 + (ML20206J300)
- ML20206J301 + (ML20206J301)
- ML20206J302 + (ML20206J302)
- ML20206J304 + (ML20206J304)
- 05000454/LER-1987-006-03, :on 870311,monthly Fire Protection Valve Lineup Surveillance Incorrectly Scheduled.Caused by Failure to Consider All Tech Spec Scheduling Requirements.Use of Existing Computer Program Mandated + (ML20206J306)
- ML20206J307 + (ML20206J307)
- ML20206J308 + (ML20206J308)
- ML20206J309 + (ML20206J309)
- ML20206J311 + (ML20206J311)
- ML20206J312 + (ML20206J312)
- ML20206J315 + (ML20206J315)
- ML20206J316 + (ML20206J316)
- ML20206J317 + (ML20206J317)
- ML20206J320 + (ML20206J320)
- ML20206J322 + (ML20206J322)
- ML20206J323 + (ML20206J323)
- ML20206J326 + (ML20206J326)
- ML20206J327 + (ML20206J327)
- ML20206J329 + (ML20206J329)
- 05000336/LER-1988-011-01, :on 881025,loss of Normal Power Due to Improper Connection of Grounding Device to Bus Side of 4,160 Volt Breaker.Caused by Personnel Error.Verification That All Equipment Responding as Required Done + (ML20206J331)
- ML20206J332 + (ML20206J332)
- ML20206J333 + (ML20206J333)
- ML20206J334 + (ML20206J334)