ML20206J333
| ML20206J333 | |
| Person / Time | |
|---|---|
| Site: | Limerick, 07003054 |
| Issue date: | 10/28/1988 |
| From: | Kowalski S PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | Murley T NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM), Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8811280139 | |
| Download: ML20206J333 (2) | |
Text
._ _
- ~
- ~
" E. _
PHILADELPHIA ELECTRIC COMPANY 2301 MARKET STREET P.O. BOX 8699 PHILADELPHI A. PA.19101 OCT P,81988 i
n i >.....o S. J. KOW ALSKI vics PmasansNT
}
.m..............
1 i
Dr. Thctnas E. Murley, Director Docket No. 50-353 Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Ccmnission Attn: Docunent Control Desk Mall Station P1-137 L
. Washington, DC 20555 1
Subject:
Limerick Generating Station, Unit 2 Supplemental Infomation to Special Nuc1 car Material License
References:
1)
Amendment to Special Nuclear Material License SPN-1977 dated May 6,1988 2)
Telecon between D. McCaughy (USNRC) to l
F. M. Salva (PEco) dated October 15, 1988 l
Flie:
GOVT 1-1 (NRC)
)
Dear Dr. Murley:
In the reference telecon David McCaughy of your staff requested i
he following supplemental technical Infonnation regarding the Special Nuclear Material License amendnent request for Limerick Unit 2:
l l
Maximun Pellet Enrichment (wt U-235)
- 3.8 5
Fuel Pin O.D.
- 0.411 inches l
Cladding 0.D.
- 0.483 Inches Cladding I.D.
- 0.419 Inches
(
Cladding Thickness
- 0.032 Inches j
Fuel Rod Pitch
- 0.64 inches Active Fuel Length
- 150 Inches Boral Ccrmosition in the high density fuel racks by VA:
{
^
Aluninun (A1) - 47.0 Boron Carbide (84C) - 53.0 l
t i
Finally, the fuel handling procedures at Limerick do not specify a rmxinun ntat>er of fuel bundles / shipping containers that can be located
(
t j
I 81111280139 8S102S h-N I
3 PLR ADOCK 05000353 P
PDC j
8 on the refueling floor prior to fuel inspection. Mcwever, the fuel handling procedures do specify that no trore than three fuel bundles can be out of their shipping containers at any one t!rne on the refueling floor.
If you have any further questions, please do not hesitate to contact us.
Sincerely, s
A m
S.,J.
Krava l s k i Vice President Nuclear Engineering Department UEP/sw/10268801 cc: Addressee R. J. Clark, UStRC Project Manager W. T. Russell, Achinistrator, Region I, US?RC R. A. Gramn, USNRC Senior Resident inspector, LGS-2 D. McCt.'*ghy, USNRC
.