Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20205S961 + (ML20205S961)
- ML20205S962 + (ML20205S962)
- ML20205S963 + (ML20205S963)
- ML20205S964 + (ML20205S964)
- L-99-170, Snoc Jfnp Startup Test Rept Unit 1 Cycle 16. with + (ML20205S964)
- ML20205S965 + (ML20205S965)
- ML20205S966 + (ML20205S966)
- ML20205S970 + (ML20205S970)
- ML20205S973 + (ML20205S973)
- ML20205S974 + (ML20205S974)
- ML20205S975 + (ML20205S975)
- VPN-031-99, Forwards Trojan Nuclear Plant,Radiological Environ Monitoring Rept for CY98. Rept Submitted in Accordance with Trojan Permanently Defueled TS 5.8.1.2 & Sections IV.B.2, IV.B.3 & Iv.C of App I to Title 10CFR50 + (ML20205S976)
- ML20205S977 + (ML20205S977)
- ML20205S978 + (ML20205S978)
- 05000370/LER-1999-002, Forwards LER 99-002-00 Re Failure to Comply with Required Actions of TS 3.4.12, LTOP Sys, with Two Centrifugal Charging Pumps Capable of Injecting Into Rcs.Event Is Considered Nonsignificant to Health & Safety of Public + (ML20205S980)
- ML20205S981 + (ML20205S981)
- ML20205S984 + (ML20205S984)
- ML20205S985 + (ML20205S985)
- ML20205S986 + (ML20205S986)
- IR 05000317/1988022 + (ML20205S987)
- ML20205S989 + (ML20205S989)
- ML20205S990 + (ML20205S990)
- 05000370/LER-1999-002-02, :on 990318,noted Failure to Comply with TS 3.4.12 Requirements Re Two Centifugal Charging Pumps.Caused by Use of Wrong Procedure.Licensee Will Review & Revise Procedures & Operator Training Program as Needed + (ML20205S991)
- ML20205S992 + (ML20205S992)
- ML20205S993 + (ML20205S993)
- ML20205S995 + (ML20205S995)
- ML20205S996 + (ML20205S996)
- ML20205S997 + (ML20205S997)
- ML20205T000 + (ML20205T000)
- ML20205T001 + (ML20205T001)
- ML20205T002 + (ML20205T002)
- ML20205T008 + (ML20205T008)
- ML20205T009 + (ML20205T009)
- ML20205T010 + (ML20205T010)
- 05000298/LER-1986-011, :on 860510,closure of Stop Valve 2 Did Not Result in Turbine Stop Valve Closure Half Scram During Sp 6.1.7.Caused by Disconnected Linkage Between Valve Actuator & Reactor Protection Sys Limit Switches + (ML20205T012)
- ML20205T013 + (ML20205T013)
- ML20205T016 + (ML20205T016)
- AECM-86-0168, Application for Amend to License NPF-29,changing Tech Spec 6.2.2,Figure 6.2.1-2 Re Unit Organization Chart & Tech Spec 6.5.1.2 Re Composition of Plant Safety Review Committee to Strengthen Unit Organization.Fee Paid + (ML20205T017)
- ML20205T020 + (ML20205T020)
- ML20205T021 + (ML20205T021)
- ML20205T022 + (ML20205T022)
- ML20205T023 + (ML20205T023)
- ML20205T026 + (ML20205T026)
- ML20205T027 + (ML20205T027)
- AECM-86-0070, Requests NRC Review & Concurrence Re Proposed Limited Deferral of Design Review/Quality Revalidation Insps on Div II Emergency Diesel Generator by 860715.Technical Basis & List of Specific Components Affected Encl.Fee Paid + (ML20205T029)
- ML20205T030 + (ML20205T030)
- ML20205T034 + (ML20205T034)
- ML20205T036 + (ML20205T036)
- ML20205T037 + (ML20205T037)
- IR 05000271/1987005 + (ML20205T041)
- IR 05000333/1986006 + (ML20205T042)