Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20205P521 + (ML20205P521)
- ML20205P522 + (ML20205P522)
- ML20205P523 + (ML20205P523)
- ML20205P524 + (ML20205P524)
- ML20205P525 + (ML20205P525)
- IR 05000321/1987005 + (ML20205P528)
- ML20205P529 + (ML20205P529)
- IR 05000424/1986028 + (ML20205P533)
- AECM-88-0208, Responds to NRC Re Violations Noted in Insp Rept 50-416/88-19.Corrective Actions:Training Sessions Held & Caution Labels Installed on Power Panels Feeding Isolation Valves + (ML20205P535)
- ML20205P536 + (ML20205P536)
- ML20205P537 + (ML20205P537)
- ML20205P538 + (ML20205P538)
- ML20205P539 + (ML20205P539)
- ML20205P540 + (ML20205P540)
- ML20205P541 + (ML20205P541)
- ML20205P543 + (ML20205P543)
- ML20205P544 + (ML20205P544)
- 05000304/LER-1988-007-11, :on 881008,operators Received Urgent Failure Alarm from Rod Control Circuitry & Found Blown Fuse Indicator Popped.Caused by Procedural Deficiency.Components to Be Analyzed & Procedures Revised.W/Undated Ltr + (ML20205P545)
- ML20205P546 + (ML20205P546)
- JAFP-99-0142, Monthly Operating Rept for Mar 1999 for Ja FitzPatrick Nuclear Power Plant.With + (ML20205P547)
- ML20205P548 + (ML20205P548)
- ML20205P549 + (ML20205P549)
- ML20205P550 + (ML20205P550)
- ML20205P551 + (ML20205P551)
- 05000220/LER-1986-007, :on 860415,during Refueling Outage Acurex Fuel Zone Level Indication Instrumentation Found Inaccurate by 15 to 20 Inches in Nonconservative Direction.Ge to Correct Software & Acurex Instrumentation Recalibr + (ML20205P552)
- ML20205P553 + (ML20205P553)
- LIC-99-0034, Monthly Operating Rept for Mar 1999 for Fcs,Unit 1.With + (ML20205P554)
- ML20205P555 + (ML20205P555)
- RBG-44969, Monthly Operating Rept for Mar 1999 for River Bend Station, Unit 1.With + (ML20205P556)
- AECM-86-0139, Monthly Operating Rept for Apr 1986 + (ML20205P557)
- ML20205P559 + (ML20205P559)
- ML20205P560 + (ML20205P560)
- IR 05000416/1986003 + (ML20205P561)
- ML20205P563 + (ML20205P563)
- PNO-III-87-044, on 870326,licensee Formally Requested Region III to Allow Restart of Unit.On 870327,region Issued Confirmatoru Action Ltr Permitting Restart & Power Ascension Program.Instrument Channel Malfunctioned During Preparation + (ML20205P564)
- ML20205P565 + (ML20205P565)
- HL-5758, Forwards Response to NRC 990129 RAI Re GL 96-05 Program at Ei Hatch Nuclear Plant + (ML20205P566)
- ML20205P567 + (ML20205P567)
- ML20205P568 + (ML20205P568)
- PNO-I-88-112A, overexposure of 33 Patients Receiving Palliative Brain Tumor Treatments Received 75% in Excess of Prescribed Dose.Misadministation Confirmed by Consultant. Radiotherapist Hosp Privileges Suspended + (ML20205P569)
- ML20205P570 + (ML20205P570)
- TXX-4799, Final Part 21 & Deficiency Rept CP-86-26 Re Gibbs & Hill Safety Classification of Containment Spray Sys Recirculation Lines.Initially Reported on 860414.Classification Conforms to Reg Guide & Fsar.Item Not Reportable Per 10CFR50.55(e) + (ML20205P571)
- ML20205P573 + (ML20205P573)
- B17747, Monthly Operating Rept for Mar 1999 for Millstone Nuclear Power Station,Unit 1.With + (ML20205P574)
- ML20205P575 + (ML20205P575)
- ML20205P576 + (ML20205P576)
- ML20205P578 + (ML20205P578)
- B17735, Monthly Operating Rept for Mar 1999 for Millstone Nuclear Power Station,Unit 2.With + (ML20205P579)
- ML20205P580 + (ML20205P580)
- ML20205P581 + (ML20205P581)
- ML20205P582 + (ML20205P582)