Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20205L661 + (ML20205L661)
- ML20205L662 + (ML20205L662)
- ML20205L663 + (ML20205L663)
- ML20205L665 + (ML20205L665)
- ML20205L666 + (ML20205L666)
- ML20205L667 + (ML20205L667)
- ML20205L670 + (ML20205L670)
- ML20205L675 + (ML20205L675)
- ML20205L679 + (ML20205L679)
- ML20205L686 + (ML20205L686)
- ML20205L687 + (ML20205L687)
- ML20205L688 + (ML20205L688)
- ML20205L690 + (ML20205L690)
- ULNRC-04005, Forwards Proprietary & non-proprietary White Paper Entitled, Evaluation of Severe Accident Simulation, as Addl Info to Facilitate Approval of Requested Amend to Revise TS to Use Repair SG Tubes.Proprietary Info Withheld,Per 10CFR2.790 + (ML20205L691)
- RBG-25527, Submits Results of Nonradiological Sample Analysis of Chloride,Sulfate & Silica as Confirmation of 870220 Telcon Between Cl Nash & JB Nicholas + (ML20205L692)
- ML20205L696 + (ML20205L696)
- ML20205L697 + (ML20205L697)
- ML20205L698 + (ML20205L698)
- ML20205L703 + (ML20205L703)
- ML20205L708 + (ML20205L708)
- ML20205L721 + (ML20205L721)
- RBG-44959, Withdraws 981120 LAR 1998-20,allowing Adjusting Control Pattern for Plant Startup If Outage Had Occurred Before Planned Refueling Outage.No Plant Outage Was Conducted & Plant Is Now in Eighth Refueling Outage + (ML20205L723)
- ML20205L724 + (ML20205L724)
- RBG-44965, Responds to 990324 Telcon RAI Re SLMCPR Calculation Method for RBS Cycle 9 Slmcpr,Per LAR 1998-15 Re Change to TS 2.1.1.2, Reactor Core Safety Limits. Proposed TS Pages, Encl + (ML20205L725)
- ML20205L726 + (ML20205L726)
- ML20205L732 + (ML20205L732)
- ML20205L735 + (ML20205L735)
- ML20205L741 + (ML20205L741)
- ML20205L743 + (ML20205L743)
- ML20205L744 + (ML20205L744)
- ML20205L749 + (ML20205L749)
- ML20205L753 + (ML20205L753)
- 05000413/LER-1999-003, :on 990305,violation of TS Occurred Due to Inoperable Ice Condenser Lower Inlet Doors.Caused by Ice/ Frost Buildup Restricting Door Movement.Frost/Ice Was Cleared from Coolers & Condenser Was Declared Operable + (ML20205L754)
- NOC-AE-000506, Discusses 990301 Request for Concurrence with Process for Reclassification of non-risk Significant Components & NRC Comments at 990315 Meeting.Attachment Provides Addl Detail Re Reclassification Process,For NRC Review & Concurrence + (ML20205L763)
- ML20205L764 + (ML20205L764)
- ML20205L770 + (ML20205L770)
- ML20205L771 + (ML20205L771)
- 05000483/LER-1999-002, :on 990309,TS Surveillance Was Missed. Caused by Misinterpretation of Surveillance Requirement. Cisa Cpis & S/G Water Level low-low Mdafp Actuation Circuits Tested Satisfactorily.With + (ML20205L777)
- ML20205L779 + (ML20205L779)
- IR 05000313/1999003 + (ML20205L782)
- ML20205L786 + (ML20205L786)
- ML20205L787 + (ML20205L787)
- ML20205L789 + (ML20205L789)
- ML20205L790 + (ML20205L790)
- ML20205L791 + (ML20205L791)
- ML20205L793 + (ML20205L793)
- ML20205L794 + (ML20205L794)
- ML20205L797 + (ML20205L797)
- B17430, Forwards Response to NRC 980820 & 990125 RAIs Re Licensee 980606 Amend to License to Reflect Changes in Licensing Basis for post-accident Operation of Suppl Leakage Collection & Release Sys Described in Fsar.With Diskette + (ML20205L798)
- ML20205L800 + (ML20205L800)
- 05000266/LER-1999-001-01, Forwards LER 99-001-01,describing Discovery That Common Min Recirculation Flow Line Return to RWST for Safety Injection & Containment Spray Pumps Was Partially Frozen & Would Not Pass Flow.New Commitments Indicated in Italic + (ML20205L802)