ML20205L797
| ML20205L797 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 03/26/1987 |
| From: | Wooldridge R WORSHAM, FORSYTHE, SAMPELS & WOOLRIDGE (FORMERLY |
| To: | Bloch P, Jordan W, Mccollom K Atomic Safety and Licensing Board Panel |
| References | |
| CON-#287-2931 OL, NUDOCS 8704020195 | |
| Download: ML20205L797 (1) | |
Text
z n/
NEL%TED CORRESVONDq s
WonsnAM, FORSYTHE, S AMPELS &
IDGE TwiRTT Two wwwoREo,aoot eRVAN TQwCR fj%${
M.o.SAMpCLS soc A. wor $M AM DALI.As. TzxAS 75201 RomERT A. wooLonicoE
,,,,,,,7, NEiL o. ANoERSoM 7 ER 30 P6 32 o, coons, Na o M wa son TELEPacNE (2141979 3OOO J. 04N sonANNAN Jo$.iRioN wor $w AM TRaveS c. v4NoEReoo6 Cant A. roRSv7sE JUoiTM M.JoMNSON 0.pRC 4 +
_.e.e<
4 RiCwARo L. AoAMS oAvio C. LoNERoAN 00CKE ?:.':, & v 2 tLEcoa'ER iziA>eso-con
' JoMN w. McREVNOLoS
{,4 ). [ eJ TMonaAS F. LILLARo RosERT m. wise TIMOTHf A. M ACM ROBERT M. FILLMORE wM STEPMEN 90To MARE R. wASEM CHRIStopMER R MILTENSCRGER Ro8ERT P. oliver MARR SCHWARTZ RICMARo G. MOORE NANCYE L. S ETMURE M CECEuA J. eRuNE" March 26 1987 I
JOE A oAvlS E RIC M. PETERSON w ALTE R W, W MITE Peter B. Bloch, Esquire Dr. Kenneth A. McCollom Chairman Administrative Judge Atomic Safety and Licensing Board 1107 West Knapp-U.S. Nuclear Regulatory Commission Stillwater, Oklahoma 74075 Washington, D.C. 20555 Dr. Walter H. Jordan Elizabeth B. Johnson Administrative Judge Oak Ridge National Laboratory 881 West Outer Drive P. O. Box X, Building 3500 Oak Ridge, Tennessee 37330 Oak Ridge, Tennessee 37830 Re: Texas Utilities Electric Company, et al (Comanche Peak Steam Electric Station, Units 1 & 2); Docket Nos. 50 445 and 50.446 - O b
Dear Administrative Judges:
Attached, for your information,is a copy of letter dated March 26,1987 from W. G. Counsil to the U. S. Nuclear Regulatory Commission, transmitting copies of
" Design Criteria for Pipe Stress and Pipe Supports," Revision 3.
Copies of the report referred to above have been sent this date to Ms.
Juanita Ellis and Cygna Energy Services, Inc.
Respe fully submitted, Robert A. Wooldridge RAW /kiw Enclosures cc:
Service List 8704020195 870326 ADOCK 0500 5
g3
{DR
t s
Log # TXX-6355 P9 File # 10068 L
Z 10010 clo illELECTRIC u n.,,, c. cm.a March 25, 1987 f.m utne 6 ou r Premient U.S. Nuclear Regulatory Coinmission ATTN: Document Control Desk Washington, D.C.
20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50-445 AND 50-446 TRANSMITTAL 0F DOCUMENTS REQUESTED BY CYGNA Gentlemen:
Enclosed are 15 copies of the correspondence (with enclosures) dated March 25, 1987, from W. G. Counsil to N. H. Williams transmitting documents requested by CYGNA.
The Atomic Safety and Licensing Board will be notified of this transmittal per separate letter from our attorney.
Very truly yours, O,A(,/
% u c c/
/
W. G Counsil GNle t L[L'56f By: N.G G. S. Keeley Manager, Nu f u icensing JDS/ef Enclosures c-Mr. E. H. Johnson, Region IV Mr. D. L. Kelley, RI - Region IV Mr. H. S. Phillips, RI - Region IV SN) %rth Olne 5trcet i !! %l ll.sile. legn '?.'Ji
t Enclosure to TXX-6355
\\
Log # TXX-6356
.9 File # 2260 10068 clo 1UELECTRIC w n.. c. cm,
March 25, 1987 bes urne i n e Peruelent CYGNA Energy Services Attention: Ms. N.H. Williams, Project Manager Comanche Peak Project 2121 N. California Blvd.
Suite 390 Walnut Creek, CA 94596
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
TRANSMITTAL OF DOCUMENTS REQUESTED BY CYGNA
Dear Ms. Williams:
TU Electric has compiled the documents you requested during the meeting held at Comanche Peak on February 24, 1987 and audits with IMPELL in their Chicago offices.
Er:losed are 3 copies of the following dccuments you r queste;:
RIL DOCUMENTS ISSUE 8 1.
Brown & Root Procedure # CCP-12, Rev. 5 CTH 3 2.
Brown & Root Procedure # CEI-25, Rev. 7 CTH 3 3.
Brown & Root Procedure # CCP-45, Rev. 4 CTH 17 & 20 PS 26 4.
Brown & Root Procedure # QI-QAP-ll.1-28, PS 26
+
Rev. 35 5.
a) Gibbs & Hill letter # CHCP-1773, dated CTH 17 & 20 9-30-87 PS 26 b) TUGC0 office memo # NE-1949, dated CTH 17 & 20 10-31-86 PS 26 c) Stone & Webster letter # SWTU-0880, Pipe Stress 3 dated 2-24-87 6.
TUGC0 Nuclear Engineering Procedure CTH 17 & 20
- TNE-DC-22, Rev. 2 EDCN-01 PS 26 i
i
- 48) %rth Olne Street i H Mi i)allas hus 73201
e-Enclosure to TXX-6355 TXX-6356
. March 25, 1987 Page 2 RIL DOCUMENTS ISSUE #
7.
TUGC0 Nuclear Engineering Procedure CTH 17 & 20
- TNE-DC-22-1, Rev. O PS 26 8.
TUGC0 Instruction # QI-QP-11.0-6, Revl.10 CTH 3 9.
TUGC0 Instruction # QI-QP-11.0-12, Rev. 14 CTH 3
- 10. TUGC0 Instruction # QI-QP-11.14-13, Rev. O CTH 17 & 20 PS 26
- 11. IMPELL Calculation M-13 Rev.1 " Verification CTH of Overlap Procedure".
- 12. IMPELL Calculation M-22 Rev. 5 " Automated CTH Support Evaluation Program Specification".
- 13. IMPELL Calculation M-49 Rev. O " Seismic Load CTH Combination Study".
- 14. IMPELL Calculation M-56 Rev. O " Refinement CTH Techniques for Effective Length Factors".