Notice of Withdrawal of Proposed Rule, Shutdown & Low-Power Operations for Nuclear Power Reactors. Proposed Rule Would Have Required Licensees to Ensure That Following Safety Functions Were Maintained During Shutdown Operations
ML20205L679
Person / Time
Issue date: 01/29/1999
From: Vietticook A
NRC COMMISSION (OCM)
To:
Shared Package
ML20205L674 List:
References
NUDOCS 9904140246
Download: ML20205L679 (2)


Text

.I 3 .

[7590-01-P]

NUCLEAR REGULATORY COMMISSION 10 CFR Part 50 RIN 3150-AE97 Shutdown and Low-Power Operations for Nuclear Power Reactors AGENCY: U. S. Nuclear Regulatory Commission.

ACTION: Proposed Rule: Withdrawal.

SUMMARY

The U.S. Nuclear Regulatory Commission is withdrawing a proposed rule for Shutdown and Low-Power Operations for Nuclear Power Reactors. The proposed rule would have required licensees to ensure that the following safety functions were maintained during shutdown and low-power operations. These safety functions were reactivity control, inventory control, decay heat removal, and containment integrity.

FOR FURTHER INFORMATION CONTACT: Mr. Eric Weiss, U.S. Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation, MS O-8 E23, Washington DC 20555-0001, Telephonc 301-415-3264. I SUPPL iMENTARY INFORMATION:

On October 19,1994, the Commission published the proposed rule, " Shutdown and Low-Power Operations for Nuclear Power Reactors"(59 FR 52707-52714). In this Federal Reaister Notice, the Commission proposed regulatory requirements that would set minimum standards for shutdown and low-power operations.

The comment period expired on February 3,1995. The Commission received a significant number of comments from the nuclear industry and a few comments from public on i the proposed rule, the majority of which were negative. ,

i l

9904140246 990204 #GtCC PDR ORO

i O . a 6

, ,4 -

The Commission has decided not to proceed with a final rule at this time. In view of current industry performance and the regulatory controls in the area of maintenance generally, the Commission does not believe that regulatory requirements specifically addressed to low-power and shutdown operations are needed at this time. However, the Commission will continue to monitor industry performance and may take further action if any adverse trends are identified.

Dated at Rockville, Maryland, this M day of January,1999.

For the Nuclear Regulatory Commission.

i M b . IM -[

'Annette L. Vietti-Cook, l Secretary of the Commission.

i l

1

]

l 2

.i ' '

CONGRESSIONAL CORRESPONDENCE SYSTEM y - DOCUMENT PREPARATION CHECKLIST This check list is to be submitted with each document (or group of Os/As) sent for processing into the CCS.

1. BRIEF DESCRIPTION OF DOCUMENT (S)b-v >

d4I n f b ';M h v

2. TYPE OF DOCUMENT X CORRESPONDENCE HEARINGS (Os/As)
3. DOCUMENT CONTROL SENSITIVE (NRC ONLY) X NON-SENSITIVE
4. CONGRESSIONAL COMMITTEE AND SUBCOMMITTEE (if applicable)

Congressional Committee Subcommittee

5. SUBJECT CODES (A)

(B)

(C)

6. SOURCE OF DOCUMENTS (A) 5520 (DOCUMENT NAME (B) SCAN (C) ATTACHMENTS (D) OTHER l 7 SYSTEM LOG DATES f q q (A)- N/ DATA OCA SENT DOCUMENT TO CCS (B) DATE CCS RECEIVED DOCUMENT (C) DATE RETURNED TO OCA FOR ADDITIONAL INFORMATION (D) DATE RESUBMITTED BY OCA TO CCS l (E) DATE ENTERED INTO CCS BY (F) DATE OCA NOTIFIED THAT DOCUMENT IS IN CCS COMMENTS:

I RELEASE TO PDR l ItAW98 - P:\DISRTLIS.DMS

'40037