Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20205K335 + (ML20205K335)
- PY-CEI-NRR-2389, Monthly Operating Rept for Mar 1999 for Perry Nuclear Power Plant,Unit 1.With + (ML20205K337)
- ML20205K338 + (ML20205K338)
- ML20205K340 + (ML20205K340)
- B11999, Forwards BAW-1878, Haddam Neck Plant Technical Rept Supporting Cycle 14 Operation. Cycle 14 Tech Spec Operating Limits Submitted W/Reload License Amend Request Still Valid & Supported by Revised Fuel Burnups + (ML20205K343)
- ML20205K344 + (ML20205K344)
- ML20205K345 + (ML20205K345)
- ML20205K346 + (ML20205K346)
- ML20205K350 + (ML20205K350)
- ML20205K351 + (ML20205K351)
- ULNRC-04004, Forwards Proprietary Thermal Stability Background Data Along with Time/Temp Graph Requested in 990402 Telcon with NRC & Contractor,Argonne Natl Lab.Proprietary Info Withheld + (ML20205K352)
- ML20205K353 + (ML20205K353)
- ML20205K355 + (ML20205K355)
- ML20205K356 + (ML20205K356)
- ML20205K358 + (ML20205K358)
- ML20205K359 + (ML20205K359)
- ML20205K360 + (ML20205K360)
- ML20205K361 + (ML20205K361)
- ML20205K362 + (ML20205K362)
- ML20205K363 + (ML20205K363)
- ML20205K364 + (ML20205K364)
- ML20205K365 + (ML20205K365)
- 05000334/LER-1998-015-01, Forwards LER 98-015-01, Inadequate Performance of Channel Functional Tests, Per 10CFR50.73(a)(2)(i).Restatement of Corrective Action Provided with Underlined Words to Clarify Intent + (ML20205K368)
- PNO-I-86-020, on 860221,controlled Shutdown Occurred Due to Sulfate Concentrations Exceeding Owners Group Guideline of 20 Parts Per Billion.Caused by Condensate Demineralizer Resin Intrusion.Plans Made to Drain & Refill Generators + (ML20205K373)
- 05000267/LER-1986-009, :on 860125,one of Three Helium Circulator a Steam/Water Drain Malfunction Trip Channels Inoperable. Caused by Spare Wire Shorted to Ground Causing Power Supply Fuse Failure.Spare Wire Terminated + (ML20205K376)
- ML20205K380 + (ML20205K380)
- IA-88-378, Forwards Draft Rept, Shipping Container Response to Severe Highway & Railroad Accident Conditions. W/O Encl + (ML20205K381)
- ML20205K381 + (ML20205K381)
- ML20205K383 + (ML20205K383)
- ML20205K385 + (ML20205K385)
- ML20205K387 + (ML20205K387)
- ML20205K388 + (ML20205K388)
- B11937, Discusses Reactor Cavity Pool Seal Status.Plant Procedures Used to Respond to Decreasing Reactor Cavity Water Level Remain Valid.New Permanent Seal Design Reviewed Against IE Bulletin 84-03 & All Appropriate Plant Procedures + (ML20205K389)
- ML20205K391 + (ML20205K391)
- ML20205K392 + (ML20205K392)
- ML20205K394 + (ML20205K394)
- ML20205K395 + (ML20205K395)
- ML20205K396 + (ML20205K396)
- ML20205K397 + (ML20205K397)
- ML20205K398 + (ML20205K398)
- 0CAN108804, Forwards Rev 14 to Industrial Security Plan.Rev Withheld (Ref 10CFR73.21) + (ML20205K399)
- ML20205K400 + (ML20205K400)
- ML20205K401 + (ML20205K401)
- ML20205K403 + (ML20205K403)
- IR 05000341/1985027 + (ML20205K407)
- ML20205K408 + (ML20205K408)
- 05000219/LER-1998-015-01, Forwards LER 98-015-01,as Original Submittal on 981028 Inadvertently Indicated That Suppl Would Be Submitted.Suppl Should Not Have Been Required as Only Change Is on Cover Page + (ML20205K409)
- ML20205K410 + (ML20205K410)
- 05000304/LER-1986-006-01, :on 860122,during Logic Testing,Train B Breaker Rather than Train a Opened.Caused by Miswiring of Reactor Trip Switchgear During Mod.Investigation of Shut Trip Mod Activities in Progress.Testing Completed + (ML20205K413)
- ML20205K417 + (ML20205K417)
- ML20205K419 + (ML20205K419)
- LG-85-002, Forwards Actions Taken to Improve Regulatory Performance in Fire Protection & in Areas in Which Activity Continuing & SALP 1 Goal Not Achieved,Per SALP 6 Board Rept 50-341/85-27 + (ML20205K420)