Responds to NRC Re Violations Noted in Insp Repts 50-373/85-33 & 50-374/85-34.Corrective Actions:Replacement Part Procured from Mfg Installed & Tested Satisfactorily
ML20205K417
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 01/29/1986
From: Farrar D
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
1212K, NUDOCS 8602270363
Download: ML20205K417 (2)


Text

r- -

r -

yk

[ N nCommonwealth Edison'

) Oni First Nttiorni Pina. Chicago, Illinois (O Addr:ss R riv to: Post Offics Box 767

[- ( Chicago. Illinois 60690 January 29, 1986

~

Mr. James G. Keppler Regional Administrator U.S. Nuclear Regulatory Conunission

}i Region III 799 Roosevelt Road Glen Ellyn. IL 60137

\

s

Subject:

LaSalle County Station Units 1 and 2

\, Response to Inspection Report Nos.

50-373/85-033 and 50-374/85-034 NRC Docket Nos. 50-373 and 50-374 Reference (a): C. E. Norelius letter to Cordell Reed dated December 31, 1985.

4 J

Dear Mr. Keppler:

This letter is in response to the: inspection conducted by Messrs.

M.-Jordan, J. Bjorgen, R. Kopriva and N. Choules on October 1, through November 12, 1985, of activities at LaSalle County Station. Reference (a) indicated that certain activities appeared to be in noncompliance with NRC requirements. The Commonwealth Edison Company response to the Notice of Violation is y ovided in the enclosure.

If you havo 'any further questions on this matter, please direct

,4 them to this office.

Very ly yours

,j J_ -: A.,

D. L. Farrar Director of Nuclear Licensing im .

Attachment I

cc
NRC Resident Inspector - LSCS i

i l

1212K E602270363 860129 .IAN 3 01988 PDR ADOCM 05000373 %h G PDR f[o -

_,f.*

ATTACISIENT ITEN OF NONCOMPLIANCE 10 CFR 50, Appendix B, Criterion III, as implemented by Commonwealth Edison Quality Requirements 3.0, requires that safety-related parts and equipment be reviewed for suitability of application.

Contrary to the above the licensee failed to perform a suitability of application review for replacement parts which were not like for like replacements during the maintenance activities listed below:

1. The licensee fabricated a spring button and installed same in the Unit 2 Scram Discharge Vent Valve 2C11-380 on August 17, 1985 after the original spring button was found to be broken.
2. On or about August 20, 1985 the licensee replaced the originally supplied screws on the handle of the Unit 2 2B Diesel Generator cooling water pump breaker, NCC 243-1, with longer screws.

CORRECTIVE ACTION TAKEN AND RESULTS ACHIEVED

1. As stated in the inspection report, a replacement part was procured from the original equipment manufacturer, installed and tested satisfactorily on September 27, 1985. Both the original part which failed and the shop fabricated component were subsequently tested under the direction of Station Nuclear Engineering and the shop fabricated component was found to be equal to or better than the original component.
2. Work Request L52347 was prepared to install a handle and screws from a spare breaker on the same bus. After completion of this activity the breaker still would not function properly. Continued investigation determined the breaker to be the cause of the problem. The breaker was replaced and satisfactorily tested.

CORRECTIVE ACTION TAKEN TO AVOID FURTHER NONCOMPLIANCE Existing station procedures were reviewed for adequacy. The Work Request procedure LAP 1300-1 was revised to provide further direction to Maintenance Personnel on steps to take to ensure adequate review of parts used during maintenance. These changes were incorporated in LAP 1300-1 Revision 28, dated November 5, 1985.

In addition to the procedure change discussed above Maintenance, Quality Control and Technical Staff Personnel were reinstructed on compliance with procedures which require review of replacement parts for suitability.

DATE OF FULL COMPLIANCE ,

Full Compliance has been achieved.

1212K J