Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20205C604 + (ML20205C604)
- ML20205C605 + (ML20205C605)
- ML20205C606 + (ML20205C606)
- ML20205C610 + (ML20205C610)
- B17713, Informs That There No Longer Exists Need to Maintain Millstone,Unit 1 Reactor Operator Licenses for Listed Individuals,Effective 990404 + (ML20205C611)
- ML20205C612 + (ML20205C612)
- ML20205C613 + (ML20205C613)
- SNRC-1324, Forwards Listing of Nuclear Property Insurance + (ML20205C614)
- ML20205C616 + (ML20205C616)
- ML20205C617 + (ML20205C617)
- PY-CEI-NRR-2380, Requests Approval of Attached Repair Plan for Feedwater Nozzle to safe-end Weld N4C-KB.Proposed Weld Overlay Design & Installation Plan Details Included in Attachment 1. Attachment 2 Provides Applicable Preliminary Weld Procedure + (ML20205C618)
- IA-88-310, Final Response to FOIA Request for Documents.App a Records Partially Withheld (Ref FOIA Exemption 5) + (ML20205C619)
- ML20205C619 + (ML20205C619)
- 05000250/LER-1986-027, :on 860619,five Tech Spec Required Calibrs & Channel Functional Tests Not Performed.Caused by Personnel Error.Procedures Revised,New Procedures Implemented & Weekly Planning Meetings Instituted + (ML20205C623)
- ML20205C625 + (ML20205C625)
- ML20205C627 + (ML20205C627)
- ML20205C628 + (ML20205C628)
- ML20205C632 + (ML20205C632)
- ML20205C633 + (ML20205C633)
- ML20205C634 + (ML20205C634)
- ML20205C635 + (ML20205C635)
- IR 05000397/1986014 + (ML20205C636)
- 05000269/LER-1987-002-04, :During Wk of 870127,determined That Operators May Not Be Able to Isolate Particular Letdown Flow Path. Caused by Design Deficiency.Power Removed from Breakers for Valves LP-1 & HP-2 on 870129 + (ML20205C637)
- ML20205C638 + (ML20205C638)
- ML20205C640 + (ML20205C640)
- ML20205C641 + (ML20205C641)
- ML20205C642 + (ML20205C642)
- ML20205C643 + (ML20205C643)
- ML20205C647 + (ML20205C647)
- ML20205C649 + (ML20205C649)
- ML20205C651 + (ML20205C651)
- ML20205C652 + (ML20205C652)
- ML20205C654 + (ML20205C654)
- ML20205C656 + (ML20205C656)
- ML20205C657 + (ML20205C657)
- ML20205C658 + (ML20205C658)
- 05000259/LER-1985-039, :on 850815,local Leak Rate Test Results Exceeded Tech Specs for Msivs,Primary Containment Penetrations & Isolation Valves.Cause Not Stated.Repair & Testing Underway + (ML20205C660)
- ML20205C661 + (ML20205C661)
- ML20205C662 + (ML20205C662)
- ML20205C663 + (ML20205C663)
- ML20205C664 + (ML20205C664)
- ML20205C665 + (ML20205C665)
- 05000461/LER-1987-012, :on 870310,main Control Room Ventilation Sys Train B Shifted to High Chlorine Mode.Caused by Depletion of Chlorine Sensing Tape Cassette.New Tape Cassette Installed & Detector OXE-VC118B Returned to Svc + (ML20205C666)
- 05000483/LER-1985-037, :on 850817,axial Flux Difference Outside Tech Spec Target Band for 135 Minutes.Caused by Operator Not Observing Control Board Crt.Personnel Received Addl training.Out-of-band Annunciator Added + (ML20205C667)
- ML20205C668 + (ML20205C668)
- ML20205C669 + (ML20205C669)
- ML20205C670 + (ML20205C670)
- ML20205C671 + (ML20205C671)
- 05000352/LER-1985-069, :on 850817,safeguard Power Distribution Alignment & Voltage Check Surveillance Test Not Performed within Specified Time.Caused by Shift Supervision Error. Surveillance Test Performed + (ML20205C675)
- ML20205C676 + (ML20205C676)
- 05000281/LER-1985-008, :on 850619,auxiliary Ventilation Damper 1-VS-MOD-58A Drifted Closed.Caused by Short in Damper Actuator Relief Valve Coil.Actuator Sent to Mfg for Overhaul + (ML20205C678)