Corrected Unit Shutdowns/Reductions Section to Monthly Operating Rept for Jul 1985
ML20205C610
Person / Time
Site: Byron Constellation icon.png
Issue date: 07/31/1985
From:
COMMONWEALTH EDISON CO.
To:
Shared Package
ML20205C595 List:
References
(0625M), (625M), NUDOCS 8509230058
Download: ML20205C610 (2)


Text

l t

(

ccccccccccccccccccccccccon l

Report Period July 1935 UNIT SIPN1'S/REDUCTIC3 0

BYRON O

      • e t

l l

l No.

Date T_ype Hours Reason Method LER Number System Component Cause & Corrective Action to Prevent Recurrence j

23) 8/1/85 S

7.5 B

2 Continued outage as a result of 100% Reactor.

Trip Startup Test from 7/27/85.

l l

24) 8/1/85 P

7.5 A

1 Unit 1 equipment hatch failed it's l

surveillance; required to shutdown as per tech spec.

l

25) 8/7/85 F

17.8 H*

3 I.M. removed wrong cable during surveillance on i

power range channels, which actuated the 2 out of 4 reactor trip logic.

11

  • 1 Inadequate N.D.E. records of rafety injection
26) 8/29/85 F

50.6 2

valve weld, resulting in tech. spec. required shut down.

  • H:

Instrument Mechanic error.

1

  • H:

Tech. Spec. required shutdown.

2 cocceceeeeeeeen o

Sumary Byron 1 is continuing in its 100% Power Test Sequence.

cococceae

  • ee*.

TYPE Reason Method System & Component F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

& License Examination 9-Other (LER) File 03JREG-0161) 8509230050 850911 (0625M) hDR ADOCK 05000454 PDR

- __. ___ __._..._ _...-__.._ -_~ - __ _

cPleaA inscrt this tcblo in the July 1985 rcport ocooooooooooooococcococcoo Report Period July 1985 UNIT SHUTDOWNS / REDUCTIONS BYRON o'

^*

eeeeeeeeeeeeeeeeeeeeeeeeee No.

Date Type Hours Reason Method _LER Number System Component Cause & Corrective Action to Prevent Recurrence l

19) 7/1/85 S-168.9 A 4

Continued scheduled outage from 6/27/85.

l

20) 7/8/85 F

14.1 A

2 A manual turbine trip was initiated at 8% Reactor Power due j

to misalignment of control rod P-8.

A reactor trip resulted.

21) 7/12/85 F

10.7 B

3 The reactor tripped during performance of the 507. load rejection test..

i

22) 7/13/85 F

211.3 A 3

The reactor tripped due to high negative flux rate which was caused by lightning.

23) 7/27/85 S

100.0 B 2

100% Reactor Trip Startup Test.

\\

cococo.........

l Summary Byron 1 is continuing in its 100% Power Test Sequence, econoceeeeeeee.

TYPE Reason Method System & Component I

I F-Forced A-Equip Failure F-Admin 1-Manu 1 Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

& License Examination 9-Other (LER) File (NUREG-0161)

I

(

(0625M) t I

I l'

l

[

i i

4 y

.