Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20203M383 + (ML20203M383)
- B17087, Revises Scheduled Completion Date of Commitments as Listed + (ML20203M387)
- ML20203M390 + (ML20203M390)
- BSEP-98-0008, Forwards Rev 0 to Pump & Valve IST Program Plan Third Interval for Cp&L,Units 1 & 2. List of Prints Being Included W/Ltr Provided in Encl 3 + (ML20203M392)
- IR 05000410/1986047 + (ML20203M394)
- ML20203M396 + (ML20203M396)
- 05000315/LER-1986-019-01, :on 860731,discovered That During Calibr of Waste Gas Hydrogen Analyzer,Improper Gas Mixture Used to Check Accuracy of Analyzer Following 860703 Calibr.Caused by Personnel Error.Calibr of Analyzer Performed + (ML20203M401)
- ML20203M403 + (ML20203M403)
- ML20203M407 + (ML20203M407)
- ML20203M409 + (ML20203M409)
- ML20203M412 + (ML20203M412)
- 05000354/LER-1986-053, :on 860804,Channel a LOCA Logic Actuation Occurred Due to Invalid Low Water Level 1 Signal.Caused by Personnel Error.Technician Counseled Re Ramifications of Improper Valving During Test Performance + (ML20203M413)
- ML20203M416 + (ML20203M416)
- ML20203M417 + (ML20203M417)
- IR 05000269/1986021 + (ML20203M423)
- ML20203M424 + (ML20203M424)
- ML20203M427 + (ML20203M427)
- ML20203M432 + (ML20203M432)
- ML20203M436 + (ML20203M436)
- 05000304/LER-1986-015-04, :on 860729,inadvertent ESF Equipment Actuated During Safeguards Testing.Probably Caused by Sticky Contact on Reset Pushbutton.Reset Pushbutton Replaced + (ML20203M440)
- 2CAN029805, Forwards SG Tubing ISI Rept Which Presents Results from ANO-2 Twelfth Refueling Outage Conducted During May 1997. 2R12 ISI Scope Included 100% of Examined Full Length W/ Bobbin Probe in Both SGs + (ML20203M446)
- ML20203M447 + (ML20203M447)
- 05000346/LER-1986-033, :on 860729,determined That Some Blowout Panels in Shield Bldg Wall Would No Longer Withstand Differential Pressure During Loca.Caused by Inadequate Technical Review of Panel Design Functions.Panel Revised + (ML20203M450)
- ML20203M451 + (ML20203M451)
- ML20203M452 + (ML20203M452)
- ML20203M455 + (ML20203M455)
- ML20203M457 + (ML20203M457)
- ML20203M463 + (ML20203M463)
- HL-5583, Provides Evaluation of 3rd 10-year Interval ISI Program & Associated Requests for Plant,Units 1 & 2 + (ML20203M464)
- IR 05000254/1986013 + (ML20203M467)
- ML20203M470 + (ML20203M470)
- ML20203M472 + (ML20203M472)
- U-600656, Responds to NRC Re Violations Noted in Insp Rept 50-461/86-28.Corrective Actions:Fog Nozzle at Hose Station 1FP603Q Replaced by Straight Stream Nozzle on 860429 & All Hose Stations Inspected & Procedures Revised + (ML20203M474)
- IA-98-071, Final Response to FOIA Request for Documents.Records Subj to Request Encl & Identified in App B.App a Records Already Available in PDR + (ML20203M482)
- ML20203M482 + (ML20203M482)
- ML20203M486 + (ML20203M486)
- NG-98-0342, Application for Amend to License DPR-49,revising Improved Tech Specs for Plant,Per NUREG-1433 + (ML20203M496)
- ML20203M497 + (ML20203M497)
- ML20203M498 + (ML20203M498)
- ML20203M501 + (ML20203M501)
- ML20203M502 + (ML20203M502)
- ML20203M506 + (ML20203M506)
- ML20203M507 + (ML20203M507)
- ML20203M509 + (ML20203M509)
- ML20203M511 + (ML20203M511)
- ML20203M512 + (ML20203M512)
- IR 05000461/1986055 + (ML20203M513)
- ML20203M514 + (ML20203M514)
- ML20203M515 + (ML20203M515)
- ML20203M516 + (ML20203M516)
- ML20203M520 + (ML20203M520)