Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20203K575 + (ML20203K575)
- ML20203K576 + (ML20203K576)
- ML20203K578 + (ML20203K578)
- ML20203K580 + (ML20203K580)
- ML20203K585 + (ML20203K585)
- ML20203K586 + (ML20203K586)
- IR 05000291/2011001 + (ML20203K587)
- ML20203K587 + (ML20203K587)
- ML20203K592 + (ML20203K592)
- 05000388/LER-1986-010-01, :on 860717,reactor Manually Shut Down Due to Excessive Unidentified Drywell Leakage.Caused by Leaking RHR Loop B Injection Testable Check Valve HV-251-F050B.Valve Repacked & Returned to Svc + (ML20203K593)
- ML20203K596 + (ML20203K596)
- 05000237/LER-1986-016-05, :on 860713,reactor Scrammed on Condenser Low Vacuum.Caused by Disconnected Pipe Union.On 860714,1-inch Pipe Union Found Separated.Union Reconnected & All Piping Connections Restored to Original Condition + (ML20203K597)
- ML20203K599 + (ML20203K599)
- ML20203K609 + (ML20203K609)
- B16913, Provides Revised Schedule for Completion of Commitments Re Corrective Action Plan for Licensed Operator Training in Response to CAL 1-97-10 + (ML20203K612)
- ML20203K615 + (ML20203K615)
- ML20203K618 + (ML20203K618)
- IR 05000259/1973007 + (ML20203K620)
- 05000354/LER-1986-037, :on 860712,grab Sample Not Obtained at 12 H Frequency.Caused by Personnel Error.Supervisor Counseled in Proper Determination of Equipment Operability.Event Will Be Included in Training Program + (ML20203K621)
- ML20203K625 + (ML20203K625)
- IR 05000259/1973012 + (ML20203K626)
- PNO-II-97-063, on 971218,Crystal River Unit 3 Achieved Significant Milestone by Declaring a EDG Operable & Thus Making Both EDGs Operable for Mode 5.Licensee Does Not Plan to Issue Press Release.State of Fl Notified + (ML20203K627)
- ML20203K629 + (ML20203K629)
- ML20203K631 + (ML20203K631)
- ML20203K632 + (ML20203K632)
- IR 05000259/1973002 + (ML20203K634)
- ML20203K636 + (ML20203K636)
- 05000296/LER-1986-006-03, :on 860714,fire Protection Water Main Water for Sprinklers Discovered Unavailable.Caused by Failure to Remove Welded Pipe Blank During Sys Testing.Blank Removed. Pipe Testing Planned + (ML20203K639)
- ML20203K640 + (ML20203K640)
- ML20203K642 + (ML20203K642)
- ML20203K647 + (ML20203K647)
- ML20203K653 + (ML20203K653)
- ML20203K655 + (ML20203K655)
- ML20203K661 + (ML20203K661)
- ML20203K663 + (ML20203K663)
- 05000423/LER-1997-036-01, Forwards LER 97-036-01 Which Documents Conditions That Was Determined Reportable at Facility on 970605,per 10CFR50.73(a)(2)(i)(B) & 10CFR50.73(a)(2)(ii)(B).Commitments in Response to Event Also Encl + (ML20203K667)
- ML20203K671 + (ML20203K671)
- ML20203K678 + (ML20203K678)
- ML20203K681 + (ML20203K681)
- 05000306/LER-1997-005, Forwards LER 97-005-00 Re Sudden Pressure Lockout of Number 10 Transformer Which Resulted in Auto Load Rejection/ Restoration on SR Bus on 971117 + (ML20203K683)
- ML20203K685 + (ML20203K685)
- ML20203K690 + (ML20203K690)
- ML20203K693 + (ML20203K693)
- 05000315/LER-1986-016-01, :on 860710,power-range Nuclear Instrumentation Time Response Testing Not Performed by Acceptable Test Method.Caused by Procedure Deficiency.Procedure Changes Implemented + (ML20203K695)
- ML20203K697 + (ML20203K697)
- ML20203K698 + (ML20203K698)
- ML20203K703 + (ML20203K703)
- ML20203K711 + (ML20203K711)
- ML20203K713 + (ML20203K713)
- ML20203K717 + (ML20203K717)
- 05000237/LER-1986-018-04, :on 860713,reactor Coolant Sample Not Taken During Reactor Startup.Caused by Miscommunication within Radiation Chemistry Dept.Event Discussed W/Involved Personnel + (ML20203K720)