Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20203G660 + (ML20203G660)
- ML20203G661 + (ML20203G661)
- ML20203G662 + (ML20203G662)
- ML20203G663 + (ML20203G663)
- ML20203G664 + (ML20203G664)
- ML20203G666 + (ML20203G666)
- ML20203G667 + (ML20203G667)
- ML20203G670 + (ML20203G670)
- PNO-II-93-004, on 930130,facility Began Reactor Shutdown to Replace Leaking Pressurizer Code Safety Valve 2B. Leak Reached Max Rate of 20-28 Gpm Prior to Shutdown.Facility in Cold Shutdown on 930131.State of AL Informed + (ML20203G671)
- ML20203G672 + (ML20203G672)
- ML20203G673 + (ML20203G673)
- 05000261/LER-1986-010-01, :on 860324,generator Lockout Resulted in Turbine & Reactor Trips.Caused by Operators Not Knowing Turbine Governor Valves Part of Generator Trip Circuit.Maint Procedures Revised & Operators Informed + (ML20203G675)
- 05000528/LER-1986-046, :on 860625,conversion Constants Used in Software for Containment Radiation Monitor RU-1 Particulate Channels Found Incorrect.Caused by Use of Incorrect Flow Factor & Efficiency Constants + (ML20203G679)
- ML20203G681 + (ML20203G681)
- ML20203G684 + (ML20203G684)
- ML20203G685 + (ML20203G685)
- 05000373/LER-1986-027, :on 860628 & 29,control Room B HVAC Sys Ammonia Detector OXY-VC165YA Spuriously Tripped.Caused by Warped Rubber Capstan Roller.Roller Replaced + (ML20203G688)
- ML20203G689 + (ML20203G689)
- ML20203G691 + (ML20203G691)
- ML20203G692 + (ML20203G692)
- ML20203G694 + (ML20203G694)
- 05000454/LER-1986-012-02, :on 860327,4 H Surveillance of Digital Rod Position Indication Vs Bank Demand Position Indication Mistakenly Stopped.Caused by Personnel Error.More Specific Instructions on Daily Orders Instituted + (ML20203G696)
- ML20203G699 + (ML20203G699)
- 05000348/LER-1986-008, :on 860702,reactor Trip Occurred Due to High Negative Flux Rate & Rod F-14 Dropping Into Core.Caused by Electrical Short in Containment Penetration Module Supplying Power to Stationary Gripper Coil of Rod + (ML20203G703)
- ML20203G704 + (ML20203G704)
- ML20203G705 + (ML20203G705)
- 05000482/LER-1986-036, :on 860626,loss of Offsite Power to ESF Emergency Bus NB01 Occurred When Disconnect on Breaker 69-16 Fell Open.Caused by Misalignment & Improper Latching of Disconnect Switch.Switch Properly Aligned + (ML20203G707)
- ML20203G711 + (ML20203G711)
- ML20203G713 + (ML20203G713)
- ML20203G714 + (ML20203G714)
- ML20203G716 + (ML20203G716)
- ML20203G717 + (ML20203G717)
- PNO-II-93-030A, on 930726,NRC Was Notified That Nuclear Gauge Was Stolen Between 930707 & 22.NRC Inpectors Determined That Gauge Placed in Storage Bldg on 930510.Region II Will Continue to Follow Licensee Efforts to Locate Gauge + (ML20203G718)
- ML20203G722 + (ML20203G722)
- ML20203G724 + (ML20203G724)
- ML20203G725 + (ML20203G725)
- ML20203G726 + (ML20203G726)
- TXX-4930, Interim Deficiency Rept CP-86-25 Re Concern That W/O Full Breaker/Fuse Coordination,Portions of Util Damage Study Could Be Incorrect.Initially Reported on 860410.Next Rept Expected by 860829 + (ML20203G732)
- ML20203G734 + (ML20203G734)
- TXX-4925, Interim Deficiency Rept CP-86-38 Re Failure of Project Procedures to Address Installation & Insp Criteria for Cable Runs Used as Device Pigtail Extensions.Initially Reported on 860527.Evaluation Underway.Next Rept by 860912 + (ML20203G735)
- 05000298/LER-1998-001, :on 980127,discovered That Closing SGTS Unit Crosstie Valve During Performance of Certain Surveillance Test Procedures Renders Both Trains Inoperable.Caused by Failure to Recognize.Procedures Revised + (ML20203G737)
- ML20203G741 + (ML20203G741)
- ML20203G742 + (ML20203G742)
- ML20203G743 + (ML20203G743)
- TXX-4924, Interim Deficiency Rept CP-86-35 Re Motor Operators for Several Valves in Main Steam Sys.Initially Reported on 860602.Complete Evaluation & Next Rept Expected by 860912 + (ML20203G745)
- TXX-4929, Interim Deficiency Rept CP-86-10 Re Defects Noted in Electrical Penetration Assemblies Supplied by Bunker Ramo. Initially Reported on 860424.Investigation & Evaluation in Progress.Next Rept Will Be Submitted by 860926 + (ML20203G748)
- ML20203G749 + (ML20203G749)
- 05000250/LER-1986-030, :on 860627,reactor Trip & Subsequent Safety Injection Actuation Occurred,Due to Personnel Performing Sections of Operating Procedure 14004.1.Caused by Personnel Error.Affected Procedure Revised + (ML20203G752)
- ML20203G753 + (ML20203G753)
- ML20203G756 + (ML20203G756)
- RC-98-0025, Informs That Plant Fulfilled Commitment as of 970630, Including Listed Elements Re Implementation of Severe Accident Mgt + (ML20203G757)