Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20203F405 + (ML20203F405)
- ML20203F407 + (ML20203F407)
- ML20203F408 + (ML20203F408)
- PNO-II-92-070, on 921019,several Circuit Breakers Failed in 230KV Switchyard to Open Position for Unknown Reasons. Licensee Has Inititated Investigation to Review Event to Determine Cause & Determine Why Certain Equipment Failed + (ML20203F409)
- ML20203F411 + (ML20203F411)
- ML20203F412 + (ML20203F412)
- ML20203F413 + (ML20203F413)
- ML20203F414 + (ML20203F414)
- 05000446/LER-1997-005, Forwards LER 97-005-00 Re Inoperability of Containment Personnel Airlock Door During Core Alterations.Commitment Made by Util,Encl + (ML20203F415)
- ML20203F416 + (ML20203F416)
- ML20203F418 + (ML20203F418)
- ML20203F420 + (ML20203F420)
- PNO-III-92-048, on 920917,licensee Shut Down Unit 1 Because 1A turbine-driven AF Pump Declared Inoperable & Operability of One of Two 1A SG Injection Lines Considered Questionable. Equipment Debris Found in AF System.Repairs Require 1 Week + (ML20203F422)
- ML20203F423 + (ML20203F423)
- ML20203F427 + (ML20203F427)
- ML20203F428 + (ML20203F428)
- ML20203F429 + (ML20203F429)
- ML20203F430 + (ML20203F430)
- B16725, Clarifies Schedule Re Millstone Unit 1 Core Shroud Repair. Development of Plans for Insp & Evaluation of Condition Will Be Done During Refueling Outage 16 + (ML20203F432)
- ML20203F434 + (ML20203F434)
- ML20203F435 + (ML20203F435)
- ML20203F436 + (ML20203F436)
- ML20203F437 + (ML20203F437)
- ML20203F439 + (ML20203F439)
- ML20203F441 + (ML20203F441)
- ML20203F442 + (ML20203F442)
- IR 05000277/1986009 + (ML20203F443)
- ML20203F444 + (ML20203F444)
- 05000446/LER-1997-005-01, :on 971109,containment Personnel Airlock Door Rendered Inoperable During Core Alterations.Caused by Less than Adequate Procedures.Revised Procedures & Reperformed Containment Integrity Surveillance Required by TS + (ML20203F445)
- ML20203F447 + (ML20203F447)
- ML20203F448 + (ML20203F448)
- ML20203F450 + (ML20203F450)
- ML20203F451 + (ML20203F451)
- PNO-III-92-047, on 920915,licensee Reported That Spill of Approx 1 Mci of P-32 Occurred in Lab in Medical Science & Research Bldg.Spill Occurred While Graduate Student Working in Lab,Additional Details Not Yet Available + (ML20203F453)
- ML20203F454 + (ML20203F454)
- ML20203F455 + (ML20203F455)
- ML20203F456 + (ML20203F456)
- ML20203F458 + (ML20203F458)
- ML20203F460 + (ML20203F460)
- ML20203F466 + (ML20203F466)
- ML20203F467 + (ML20203F467)
- ML20203F469 + (ML20203F469)
- ML20203F470 + (ML20203F470)
- ML20203F471 + (ML20203F471)
- ML20203F472 + (ML20203F472)
- PNO-III-92-014, on 920316,licensee Reported Teletherapy Misadministration Which Occurred on 920224,in Which Patient Received Radiation Dose of 180 Rads to Wrong Side of Chest. Region III Will Conduct Special Insp During Wk of 920323 + (ML20203F474)
- ML20203F477 + (ML20203F477)
- RBG-44331, Forwards Cajun Electric Power Cooperative,Inc 1996 Audited Financial Statements + (ML20203F478)
- ML20203F480 + (ML20203F480)
- ML20203F481 + (ML20203F481)
- ML20203F483 + (ML20203F483)