Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- NL-98-006, Submits Annual Rept of Property Insurance Levels for Rsngs, IAW 10CFR50.54(w)(3) + (ML20203B266)
- ML20203B267 + (ML20203B267)
- ML20203B268 + (ML20203B268)
- ML20203B269 + (ML20203B269)
- ML20203B271 + (ML20203B271)
- ML20203B273 + (ML20203B273)
- ML20203B274 + (ML20203B274)
- ML20203B275 + (ML20203B275)
- ML20203B276 + (ML20203B276)
- ML20203B277 + (ML20203B277)
- ML20203B278 + (ML20203B278)
- L-97-070, Forwards Response to Violations Noted in Integrated Insp Repts 50-334/97-07 & 50-412/97-07.Corrective Actions:Qsu Performed 10CFR50.54(a)(3) Evaluation Re Reassignment of Quality Control Receiving Insp Function from Qsu + (ML20203B279)
- ML20203B282 + (ML20203B282)
- ML20203B283 + (ML20203B283)
- PNO-II-99-007, on 990205,licensee Reported to Tn Div of Radiological Health That Resin Spill Occurred in Facility. There Were No Personnel Exposures & No Release Outside Bldg. Contamination Was Still Being Cleaned Up on 990208 + (ML20203B284)
- ML20203B285 + (ML20203B285)
- U-602940, Ro:On 980213,alert Emergency Classification Was Declared IAW EPIP EC-02, Emergency Classifications. Caused by Tripped Inverter.Rhr a Was Restored at Approx 0945 H & Emergency Terminated at 1004 H Per EPIP EC-04, Alert + (ML20203B286)
- ML20203B288 + (ML20203B288)
- ML20203B290 + (ML20203B290)
- ML20203B294 + (ML20203B294)
- ML20203B295 + (ML20203B295)
- ML20203B296 + (ML20203B296)
- ML20203B298 + (ML20203B298)
- ML20203B300 + (ML20203B300)
- ML20203B301 + (ML20203B301)
- ML20203B303 + (ML20203B303)
- ML20203B304 + (ML20203B304)
- HL-5558, Edwin I Hatch Nuclear Plant,Unit 1,Power Uprate Startup Test Rept for Cycle 18 + (ML20203B305)
- ML20203B307 + (ML20203B307)
- ML20203B309 + (ML20203B309)
- ML20203B311 + (ML20203B311)
- ML20203B312 + (ML20203B312)
- ML20203B313 + (ML20203B313)
- ML20203B314 + (ML20203B314)
- ML20203B316 + (ML20203B316)
- NRC-86-9043, Forwards Update of All Commitments Made in Response to Generic Ltr 83-28, Required Actions Based on Generic Implications of Salem ATWS Events. Post-trip & post-maint Operability Testing Review Completed + (ML20203B317)
- ML20203B319 + (ML20203B319)
- ML20203B321 + (ML20203B321)
- U-602939, Part 21 Interim Rept 21-97-060 Re Sentry Equipment Corp Commercial Grade Dedication Program Deficiencies.Evaluation of Issue Will Be Completed by 980404 + (ML20203B322)
- ML20203B323 + (ML20203B323)
- U-600534, Forwards Addendum Info Re Power Ascension Program Acceleration Test Package STP 8.0, Control Rod Sequence Exchange Test Deletion. Info Provides Examples of Startup Test Programs Using GE Procedures + (ML20203B326)
- ML20203B328 + (ML20203B328)
- B12002, Forwards Probabilistic risk-based Fire Analysis of internally-initiated Events.Fire Analysis Documented as Chapter 6 of Probabilistic Safety Study.W/Nine Oversize Encls + (ML20203B329)
- ML20203B330 + (ML20203B330)
- ML20203B332 + (ML20203B332)
- ML20203B333 + (ML20203B333)
- ML20203B334 + (ML20203B334)
- ML20203B336 + (ML20203B336)
- 1CAN048605, Provides Info to Document 860327 Telcon Re Seismic Design Issue Noted in Insp Rept 50-313/86-01 on 860106-31.Disagrees W/Nrc Conclusion That Seismic Class 2 Structures Not Considered in Plant Design + (ML20203B340)
- ML20203B342 + (ML20203B342)
- ML20203B343 + (ML20203B343)