Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- A97068, Forwards Independent Investigation Rept Assessing Safety Conscious Work Environ at Zion Station.Rept Details Team Investigation,Conclusions & Basis for Conclusions,As Requested in + (ML20202F138)
- ML20202F141 + (ML20202F141)
- ML20202F142 + (ML20202F142)
- ML20202F145 + (ML20202F145)
- ML20202F149 + (ML20202F149)
- ML20202F150 + (ML20202F150)
- ML20202F151 + (ML20202F151)
- ML20202F152 + (ML20202F152)
- ML20202F153 + (ML20202F153)
- ML20202F155 + (ML20202F155)
- IR 05000219/1986004 + (ML20202F157)
- ML20202F158 + (ML20202F158)
- ML20202F159 + (ML20202F159)
- ML20202F160 + (ML20202F160)
- NSD-NRC-98-5569, Forwards W Responses to FSER Open Items on AP600.Summary of Encl Responses,Fser Open Item Number,Associated Oits Number & Status to Be Designated in W Status Column of Oits, Included in Table 1 + (ML20202F161)
- ML20202F162 + (ML20202F162)
- ML20202F164 + (ML20202F164)
- ML20202F165 + (ML20202F165)
- A05836, Responds to IE Info Notice 86-047, Erratic Behavior of Static O-Ring Differential Pressure Switches. Based on Util Investigations,Switches Not Used in Integrated Safety Application.Issue Inapplicable to Plants + (ML20202F166)
- IR 05000272/1986007 + (ML20202F167)
- ML20202F170 + (ML20202F170)
- IA-86-382, Final Response to FOIA Request.Forwards App B Documents.App a & B Documents Also Available in PDR + (ML20202F171)
- ML20202F171 + (ML20202F171)
- 05000424/LER-1998-002, :on 980122,SSPS Surveillance Testing Was Noted Inadequate.Caused by Inadequate Original Testing Design. Procedures Were Changed & Testing of Circuits for Three Functions Was Completed + (ML20202F172)
- ML20202F173 + (ML20202F173)
- HL-5530, Forwards Description of Changes to Emergency Response Data Sys Data Point Libraries in Format Required by NUREG-1394, Rev 1 + (ML20202F174)
- VPN-015-98, Forwards Fitness for Duty Performance Data Rept for Period Jul-Dec 1997 + (ML20202F176)
- ML20202F179 + (ML20202F179)
- ML20202F180 + (ML20202F180)
- IR 07100104/2012015 + (ML20202F181)
- CY-99-005, Responds to NRC 981221 RAI Re Amend 193 to License to Reflect Permanent Shutdown Condition of Plant.Licensee Withdrawing 981030 (CY-98-199) Request & Will Submit Corrections in Future Proposed Rev to TS + (ML20202F182)
- ML20202F183 + (ML20202F183)
- ML20202F184 + (ML20202F184)
- 05000327/LER-1997-014-01, :on 971101,discovered That RCS PORVs Were Not Cycled in Mode 4 as Required by Ts.Caused by Inadequate Procedures.Procedure Revised & Unit Cooled Down to Mode 4 + (ML20202F185)
- ML20202F187 + (ML20202F187)
- ML20202F190 + (ML20202F190)
- ML20202F191 + (ML20202F191)
- ML20202F192 + (ML20202F192)
- ML20202F195 + (ML20202F195)
- ML20202F196 + (ML20202F196)
- ML20202F198 + (ML20202F198)
- ML20202F201 + (ML20202F201)
- ML20202F202 + (ML20202F202)
- 05000395/LER-1998-009-01, Forwards LER 98-009-01 for VC Summer Nuclear Station.Rept Describes Unanalyzed Condition for non-safety Related Component for Which All Failure Mechanisms Had Not Been Evaluated + (ML20202F203)
- SVP-98-039, Informs That Scientech Conducted Review of Program & Discovered That Nine Addl Logic Contacts Should Have Been Tested Re GL 96-01, Testing of Safety Related Logic Circuits + (ML20202F204)
- ML20202F206 + (ML20202F206)
- ML20202F208 + (ML20202F208)
- ML20202F209 + (ML20202F209)
- ML20202F210 + (ML20202F210)
- ML20202F212 + (ML20202F212)
- ML20202F214 + (ML20202F214)