Text
5 h*4
UNITED sTaiEt,
.
NUCLEAR RECULATORY COMMISSION
8'-
'
ntoioN m
I
k
LEULUISN ES OCElVED
'
\\
..t
January 2,199b M 12 /Ji D 25
PUBLicOccyg g
Mr. T. Tulon
Site Vice President
Braidwood Station
Commonwealth Edison Company
- RR #1, Box 64
Bracaville,IL 60407
SUBJECT:
NRC INSPECTION REPORT No. 50-456/g7019(DRP); 50457/g7019(DRP) AND
Dear Mr. Tulw
On December 15,19g7, the NRC completed an inspecuon at your Braidwood Units 1 and :
reactor facilities. The enclosed report presents the results of that inspecuon. During the 6-week
period covered by this inspection, your conduct of acuviuos was generally choisoterized by
safety consc',us operations, sound engineering and ma!ntenance practices, and careful
radiological work controls. Operating crews poiforming the startup from the Unit 2 refueling
outage demonstrated excellent human performance when challenged by equipment failures.
Additionally, inspectors reviewed three safety-related modifloations that were installed during the
Unit 2 refueling outage and found that the modifications were processed in acemdance with the
appropriate procedures, were properly documented, and received proper safety evaluatioru .
How.sver, we are conoemed about the failure of station personnel to identify loose materials h
the Unit 2 containment that resulted in a violation. The inspedors found two exar. : es where the
noceptance critetta of me surveillance test procedure were not met following notifv tion by
a
station personnel that the containment loose debris inspecuon was complete.
The violation is cited in the enclosed Notice of Violation (Notice) and the circumstances
surrounding the violation are described in detail in the enclosed rsport. Please note that you are
required to respond to this letter and should follow the instructions specified in the enclosed
Notice when preparing your response. Your response should not only detail the actions to be
taken for the specific issues identified, but should also be broadly focused on what acGons you
plan or have taken to ensures that your corrective scuons process is effecuve. The NRC will use
your response, in part, to determir.e whether further enforcement action is necessary to ensure
compliance with regulatory requirements,
r
\\
I
1
.
9902190143 900102
'
ll ll ll ll114ll lll
.
..
ADOCK 0500G456
0
ppg
/A b(K lS$/
fi
.
_
j
o
-
,
.
.
O
T. Tulon
2-
in scoordance with 10 CFR 2.790 of the NRC's " Rules of Prootice," a copy of this letter, the
enclosures, and your response to this letter will be placed in the NRC Public Document Room.-
Sincerely,
Geoffrey E. Grant, Dirxdor
Division of Reactor Projoots
Docket Nos: 50-450, 50-457
Lloonse Nos: NPF 72, NPF-77
Enclosures:
1.
Notice of Velation
2.
Inspection Report
,
No. 50456/97019(DRP);
50 457/97019(DRP)
oc w/enois:
O. Kingsley, Nuclear Generation Group
President and Chief Nuclear Omoor
M. Walisco, Senior Vice
President, Corporate Servloes
H. G. Ctanley, Vlos President
PWR Operations
Liaison omoor, NOC-BOD
D. A. Sager, Vice President,
Generation Support
D. Farrar. Nuclear Regulatory
Servloes Manager
1. Johnson, Licensing -
Operations Manager
Document Control Desk-Lloonsing
Braldwood Station Manager
T. Simpkin, Regulatory
Assurance Supervisor
Richard Hubbard
Nathan Schloss, Economist -
Office of the Attomey General
State Liaison Officer
Chairman, Illinois Comtr9rce
Commission
_
__
_=
_
l
j
l
.J
s
,
,
,
,
,
.T. Tulon
02
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy cf this letter, the
enclosures, and your response to this letter will be placed in the NRC Public Document Room.
Sincerely,
/s/ Marc L. Dapas for
,
l
Geoffrey E. Grant, Director
Division of Reactor Projects
Docket Nos: 50-456,50-457
License Nos: NPF 72, NPF 77
Enclosures:
1.
2.
Inspection Report
No. 50 456/97019(DRP);
50-457/97019(DRP)
cc w/encis:
O. Kingsley, Nuclear Generation Gloup
President and Chief Nuclear Officer
M. Wallace, Senior Vice
President, Corporate Services
H. G. Stanley, Vice President
PWR Operations
D. A. Sager, Vice President,
Generation Support
D. Forrer, Nuclear Regulatory
Services Manager
1. Johnson, Licensing
Operations Manager
Document Control Desk Licensing
Braldwood Station Manager
T. Simpkin, Regulatory
Assurance Supervisor
Richard Hubbard
Nathan Schloss, Economist
Office of the Aitomey General
State Liaison Officer
Chairman, Illinois Corr,merce
Commission
DOCUMENT NAME: G:\\BRAl\\ BRA 97019.DRP
g,g ,. ..,, .nw ,w.
. w.i. w m. m c . c.,,
.n.a
.v.
w.
, . c.,,
o,
.v..o..
,,
OFFICE
Rili
lE
Rlli
lN
Ril
lF
RllI~
lE
Rll!
Y
_
NAME
Tongue:et
Gardne /
Creed 7
Jordan
i
Gran
'
k
'
C115
Section
.8
Section S.1 )
i
DATE
12/f3/97
12/G/97
12/d/97
. 12/9/97
,.* W V W
OFFICIAL RECORD COPY
. . - . . .
-
.
..---
.
_
-
--.
,_
.
-. _
s
.
O-
T. Tulon
3-
Distribution:
Docket File w/encls
DRP w/encls -
PUBLIC IE-01 w/enclr
TSS w/oncls
A. Beach w/encls
DRS (2) w/encis -
Deputy RA w/encls
Rill PRR w/oncis
Rlll Enf. Coord. w/encls
RAC1 (E-Mail)
SRI Braidwood w/oncis
CAA1 (E-Mail)
Project Mgr., NRR w/encls
DOCDESK (E Mail)