Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- NSD-NRC-97-5457, Forwards Correspondence Previously Sent Informally to NRC Over Period of 970625-1029 + (ML20202D976)
- ML20202D978 + (ML20202D978)
- IR 05000400/1986051 + (ML20202D979)
- ML20202D980 + (ML20202D980)
- ML20202D982 + (ML20202D982)
- ML20202D983 + (ML20202D983)
- ML20202D985 + (ML20202D985)
- ML20202D987 + (ML20202D987)
- ML20202D988 + (ML20202D988)
- IR 05000321/1996010 + (ML20202D989)
- ML20202D990 + (ML20202D990)
- IR 05000312/1986007 + (ML20202D992)
- ML20202D994 + (ML20202D994)
- ML20202D995 + (ML20202D995)
- ML20202D997 + (ML20202D997)
- ML20202D998 + (ML20202D998)
- ML20202D999 + (ML20202D999)
- ML20202E001 + (ML20202E001)
- ML20202E003 + (ML20202E003)
- ML20202E004 + (ML20202E004)
- ML20202E005 + (ML20202E005)
- ML20202E007 + (ML20202E007)
- ML20202E008 + (ML20202E008)
- ML20202E009 + (ML20202E009)
- ML20202E010 + (ML20202E010)
- ML20202E011 + (ML20202E011)
- ML20202E012 + (ML20202E012)
- ML20202E013 + (ML20202E013)
- IA-97-461, Forwards FOIA Request Received Direct in Region II from E Barton on 971125.Encl Partially Deleted + (ML20202E014)
- ML20202E014 + (ML20202E014)
- ML20202E015 + (ML20202E015)
- B12152, Forwards Conceptual Design Info for New Switchgear Room. Detailed Design Will Proceed in Good Faith According to Major Milestone Schedule,Pending NRC Approval of Design as Acceptable Means of Providing Alternate Shutdown + (ML20202E016)
- ML20202E017 + (ML20202E017)
- ML20202E018 + (ML20202E018)
- ML20202E020 + (ML20202E020)
- ML20202E021 + (ML20202E021)
- NSD-NRC-97-5456, Forwards Response to Shield Bldg Roof Dser Open Item 3.8.4.4-2.Shear Reinforcement Changed to Respond to Staff Comments.Revised Design Shown in Proposed Revs to SSAR Included W/Response + (ML20202E023)
- ML20202E024 + (ML20202E024)
- ML20202E026 + (ML20202E026)
- ML20202E027 + (ML20202E027)
- TXX-4891, Interim Deficiency & Part 21 Rept CP-86-43 Re Environ Qualification of Itt Barton Model 580 Series Indicating Switches.Initially Reported on 860604.Evaluation Continuing. Next Rept by 860822 + (ML20202E028)
- ML20202E029 + (ML20202E029)
- ML20202E031 + (ML20202E031)
- ML20202E032 + (ML20202E032)
- ML20202E035 + (ML20202E035)
- ML20202E036 + (ML20202E036)
- ML20202E037 + (ML20202E037)
- ML20202E039 + (ML20202E039)
- ML20202E040 + (ML20202E040)
- ML20202E041 + (ML20202E041)
- TXX-4893, Interim Deficiency Rept CP-86-45 Re Interaction of non-Category I Structures & Components W/Seismic Category I Structures.Initially Reported on 860606.Evaluation Continuing.Next Rept by 860822 + (ML20202E043)