Requests Disposal of Coversheet to Rev 82 to Emergency Plan Implementing Procedure EPIP-6F
ML20202E009
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 07/03/1986
From:
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC
References
NUDOCS 8607140265
Download: ML20202E009 (1)


Text

50 -/W C0hTROLLED COPY HOLDERS Return within 2 weeks to: Document Control Center Big Rock Point Plant RECORDS CONTROL FORM Attached please find revisions / additions to the Big Rock Point Plant Site bergency Plan I=ple=enting Procedures, Volu=e 9A.

Revision Nu=ber Section/ Chapter FRC Log Nu=ber

$taas.cis'am .u ; 12. W u d n L h HIP- { f - 82. ,

I have received'the aboie mentioned documents, inserted in manual and destroyed all previous issues.

NOTE: CONTROLLED COPY HOLDERS MUST MAINTAIN C0hTROLLED PROCEDURES IN A CURRENT REVISION STAWS AND REWRN VERIFICATION SHEETS TO 6"" "#'

DOCUMENT CONTROL VITHIN 2 VEEKS.

Date C0hTROLLED COPY HOLDERS - OFFSITE 1 E=ergency Operations Facility - Boyne City (PEK)

  • 2 Administrator, NRC Region III 3

L NMH/ Rad Therapy Dept (Don ECHall) 5 Nuclear Training Center, Midland (JLFontaine) 6 Docu=ent Control - GO 7 RAEnglish, P11-311A 8 Corporate Emergency Planner (DLFugere) P26 L16 9 Manager of Emergency Preparedness Dept. IhTo

+* 10 Document Control Desk - US Nuclear Regulatory Cornission

+0 11 Docu=ent Control Desk - US Nuclear Regulatory Cocmission 12 Nuclear Licensing Analyst (CRSnov) P2h-300 13 Charlevoix Ares Hospital (Michelle Bonneville)6E CNLY(First Aid & Med.)

14 RVDoan, Palisades 62 , 1.N.P.O., Evaluation Support Dept. (LDYarger)

+ Sent to JEWerner with ktter of Release before issue

  • " Title 10 CFR 50.$h (q) and 10 CFR 50 Appendix E-V require that copies of changes to the Site Energency Plan and I=plementing Procedures be sub=itted to the NRC vithin 30 days after the change is =ade."

This trans=itt al fulfills this requirement.

Date QA-03 8607140265 B60703 PDR i