Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20199L909 + (ML20199L909)
- ML20199L912 + (ML20199L912)
- ML20199L916 + (ML20199L916)
- ML20199L917 + (ML20199L917)
- ML20199L918 + (ML20199L918)
- BSEP-97-0505, Forwards Rev 48 to Radiological Emergency Response Plan & Revised Plant Emergency Procedures + (ML20199L919)
- ML20199L920 + (ML20199L920)
- ML20199L924 + (ML20199L924)
- ML20199L927 + (ML20199L927)
- ML20199L929 + (ML20199L929)
- ML20199L931 + (ML20199L931)
- 05000446/LER-1997-002-01, :on 971025,operator Manually Tripped Reactor. Caused by Failed Phase Sensing Transformer T2 & Bent Card Edge Connector in Regulation Card.Replaced Phase Sensing Transformer & Restored Cards to Design Spec + (ML20199L934)
- ML20199L937 + (ML20199L937)
- ML20199L938 + (ML20199L938)
- ML20199L940 + (ML20199L940)
- ML20199L941 + (ML20199L941)
- ML20199L942 + (ML20199L942)
- ML20199L943 + (ML20199L943)
- ML20199L944 + (ML20199L944)
- 05000454/LER-1997-020-03, :on 970930,excessive Operator Response Times Were Noted Due to Inadequate Analysis Implementation.Caused by Inadequate procedure.E-3 Was Revised to Suspend Transition to FR-P.1 + (ML20199L946)
- ML20199L947 + (ML20199L947)
- ML20199L948 + (ML20199L948)
- ML20199L950 + (ML20199L950)
- ML20199L951 + (ML20199L951)
- ML20199L953 + (ML20199L953)
- ML20199L954 + (ML20199L954)
- ML20199L955 + (ML20199L955)
- ML20199L956 + (ML20199L956)
- ML20199L957 + (ML20199L957)
- IR 05000416/1997018 + (ML20199L958)
- ML20199L960 + (ML20199L960)
- ML20199L962 + (ML20199L962)
- ML20199L963 + (ML20199L963)
- ML20199L964 + (ML20199L964)
- ML20199L966 + (ML20199L966)
- ML20199L970 + (ML20199L970)
- ML20199L971 + (ML20199L971)
- ML20199L974 + (ML20199L974)
- ML20199L975 + (ML20199L975)
- ML20199L976 + (ML20199L976)
- 05000219/LER-1997-014, :on 971021,discovered That Suppression Pool Bypass Leak Path Existed During Purging & Venting of Primary Containment.Caused by Inadequate Procedure Review.Revised Operating Procedures Re Purge & Vent Valves + (ML20199L977)
- 05000374/LER-1998-001, :on 980106,indications,isolations & Alarms Occurred Due to Trip of 2B RPS MG Set Output Breaker & Concurrent Tripping of Electrical Protection Assembly. Replaced Circuit Board Containing Overvoltage Relay + (ML20199L978)
- ML20199L980 + (ML20199L980)
- L-97-066, Forwards Revised Response to GL 97-04, Assurance of Sufficient Net Positive Suction Head for ECC & Containment Heat Removal Pumps, Superseding Initial Response Provided on 971106.Info Will Be Submitted to NRC by 980105 + (ML20199L981)
- ML20199L982 + (ML20199L982)
- ML20199L984 + (ML20199L984)
- ML20199L986 + (ML20199L986)
- ML20199L987 + (ML20199L987)
- ML20199L988 + (ML20199L988)
- ML20199L991 + (ML20199L991)
- IR 05000295/1986012 + (ML20199L992)