Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20199F800 + (ML20199F800)
- TXX-4856, Interim Deficiency Rept CP-86-11 Re Linear Indications on Impellers for Component Cooling Water Pumps.Initially Reported on 860224.Evaluation Continuing.Next Rept Will Be Submitted by 860923 + (ML20199F801)
- ML20199F804 + (ML20199F804)
- ML20199F805 + (ML20199F805)
- ML20199F806 + (ML20199F806)
- ML20199F810 + (ML20199F810)
- ML20199F811 + (ML20199F811)
- ML20199F813 + (ML20199F813)
- ML20199F814 + (ML20199F814)
- ML20199F815 + (ML20199F815)
- ML20199F817 + (ML20199F817)
- NRC-99-0003, Forwards Rev 22 to Fermi 2 Radiological Emergency Response Preparedness Plan. Rev 22 Is Result of Changes Made to Sections B & F & App 1 + (ML20199F819)
- ML20199F823 + (ML20199F823)
- RBG-23880, Ro:On 860614,high Vibration Trip of Main Turbine Resulted in Reactor Scram.Notification of Unusual Event (NOUE) Declared Per Emergency Plan.Subsequent Review Determined That Conditions for Declaring NOUE Not Met + (ML20199F825)
- ML20199F827 + (ML20199F827)
- ML20199F833 + (ML20199F833)
- NSD-NRC-98-5540, Forwards W Responses to FSER Open Items on AP600.Summary of Encl Responses,Fser Open Item Number,Associated Oits Number & Status to Be Designated in W Status Column of Oits,Encl in Table 1 + (ML20199F837)
- ML20199F838 + (ML20199F838)
- ML20199F842 + (ML20199F842)
- ML20199F844 + (ML20199F844)
- 05000278/LER-1986-006-02, :on 860304,control Room Annunciator Core Spray Sys I Logic Power Failure Alarmed.Caused by Blown Fuses on Core a Spray Logic Due to Grounded Wires.Fuses Replaced + (ML20199F846)
- ML20199F847 + (ML20199F847)
- ML20199F853 + (ML20199F853)
- ML20199F854 + (ML20199F854)
- 05000424/LER-1997-011, :on 971019,discovered SI Valves That Isolate Pump Discharge to RCS Hot Legs,Were Opened.Caused by Procedure Discrepancy.Closed Subject Valves Using Sys Operating Procedure & Corrected Procedure + (ML20199F857)
- ML20199F858 + (ML20199F858)
- ML20199F859 + (ML20199F859)
- ML20199F863 + (ML20199F863)
- ML20199F864 + (ML20199F864)
- IR 05000321/1997010 + (ML20199F865)
- ML20199F867 + (ML20199F867)
- ML20199F872 + (ML20199F872)
- ML20199F873 + (ML20199F873)
- ML20199F874 + (ML20199F874)
- ML20199F875 + (ML20199F875)
- ML20199F878 + (ML20199F878)
- ML20199F879 + (ML20199F879)
- ML20199F886 + (ML20199F886)
- PM-86-082, Forwards LERs 86-014-00 & 86-013-00 + (ML20199F887)
- SVP-98-023, Responds to 971126 RAI & 980116 Telcon Re Util IPEEE Submittal.Util Will Provide to NRC by 980316,schedule Delineating Commitment Dates to Complete Response for Seismic & Other External Events + (ML20199F889)
- ML20199F890 + (ML20199F890)
- ML20199F893 + (ML20199F893)
- ML20199F896 + (ML20199F896)
- ML20199F897 + (ML20199F897)
- ML20199F899 + (ML20199F899)
- ML20199F902 + (ML20199F902)
- ML20199F904 + (ML20199F904)
- ML20199F905 + (ML20199F905)
- ML20199F907 + (ML20199F907)
- ML20199F911 + (ML20199F911)
- ML20199F913 + (ML20199F913)