ML20199F833

From kanterella
Jump to navigation Jump to search
Forwards First Version of 1998 Plan for Achievement of Operational Excellence.W/O Encl
ML20199F833
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 01/27/1998
From: Grigg R
WISCONSIN ELECTRIC POWER CO.
To: Grobe J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NUDOCS 9802040130
Download: ML20199F833 (1)


Text

- - - _ - - _ _ _ _ _ _ _ _ - _

J r

eica^=o n.caioc/ParmoEni a

)Electne CHIEF OPEPATING OFFICER POWEA COMPANY CHIEF NUCLtAR OFFICER (414) 221 2108 f

23m % Po b 2046.Me.ohee.W $3201 PRIORITY ROUTT%

January 27,1998 Fkst i Secu 3 JtA RC fack Grubn DRA fl0 D aty Director t[

LChP

SGA, D asion of Reactor Projects DM$. IkuOf Nuclear Regulatory Commission gg p 801 Warrenville Road g

lyg PAQ 1

Lisle,IL 60532 4351 7 g

Dear Mr. Grobe:

F~lLE_ // M 4 M 64 I am enclosing the first version of the 1998 P!an for Achievement of Operational Execlience. I believe the plan can be strengthened and subsequent revisions will include more emphasis on the following it:ms:

Reducing backlogs improving the systematic use of t aining e

Strengthening our engineering function e

Persor.ncl development Effective operation and outar.c management e

Dry cask storage e

Standard tech spec project e

The FSAR update Getting the design bases into the lands and direct usage of the operating staff e

Expanding the use of PRA assessment in our configuration control efforts e

lhese subjects are briefly mentioned in various places in the plan, but I want to highlight them as follow-up areas. I will provide you with a copy of the revised plan in the near future.

Sincerely, e

WP s.

9002040130 900127 PDR ADOCK 05000266 lO P

PM lllllllll^n[,Tll~lll+

y

,j

,o p -..uos F

9 3 65 &

a g, g p ng, n6e c L

_-__-_ __ f W " M *P""*

I