ML20199F833
| ML20199F833 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 01/27/1998 |
| From: | Grigg R WISCONSIN ELECTRIC POWER CO. |
| To: | Grobe J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| NUDOCS 9802040130 | |
| Download: ML20199F833 (1) | |
Text
- - - _ - - _ _ _ _ _ _ _ _ - _
J r
eica^=o n.caioc/ParmoEni a
)Electne CHIEF OPEPATING OFFICER POWEA COMPANY CHIEF NUCLtAR OFFICER (414) 221 2108 f
23m % Po b 2046.Me.ohee.W $3201 PRIORITY ROUTT%
January 27,1998 Fkst i Secu 3 JtA RC fack Grubn DRA fl0 D aty Director t[
LChP
- SGA, D asion of Reactor Projects DM$. IkuOf Nuclear Regulatory Commission gg p 801 Warrenville Road g
lyg PAQ 1
Lisle,IL 60532 4351 7 g
Dear Mr. Grobe:
F~lLE_ // M 4 M 64 I am enclosing the first version of the 1998 P!an for Achievement of Operational Execlience. I believe the plan can be strengthened and subsequent revisions will include more emphasis on the following it:ms:
Reducing backlogs improving the systematic use of t aining e
Strengthening our engineering function e
Persor.ncl development Effective operation and outar.c management e
Dry cask storage e
Standard tech spec project e
The FSAR update Getting the design bases into the lands and direct usage of the operating staff e
Expanding the use of PRA assessment in our configuration control efforts e
lhese subjects are briefly mentioned in various places in the plan, but I want to highlight them as follow-up areas. I will provide you with a copy of the revised plan in the near future.
Sincerely, e
WP s.
9002040130 900127 PDR ADOCK 05000266 lO P
PM lllllllll^n[,Tll~lll+
y
,j
,o p -..uos F
9 3 65 &
a g, g p ng, n6e c L
_-__-_ __ f W " M *P""*
I