x l

LNovember 13, 1997-Tennessee Valley' Authority

- ATTN: Mr. O. J. Zeringue Chief Nuclear Officer and-Executive Vice President-6A Lookout Place 1101 Market Street Chattanooga TN 37402-2E01-

SUBJECT:

PLANT PERFORMANCE REVIEW (PPR) - SEQUOYAH NUCLEAR PLANT

Dear Mr.-Zeringue:

On October 14, 1997, the Regional staffscompleted the Semiannual Plant Performance Review (PPR) of Sequoyah Nuclear Plant.

The staff conducts these reviews for all operating nuclear power plants to develop an integrated understanding of safety. performance. The results are used by Regional management to facilitate )lanning and allocation of-inspection resources.

The i

.PPR for Sequoyah Nuclear )lant involved the participation of all technical

-divisions in evaluating' inspection results and safety performance information for the period April 1997, through September 1997.

PPRs provide Regional management with a current summary of licensee performance and serve as inputs to the NRC Systematic Assessment of Licensee Performance (SALP) and Senior Management Meeting-(SMM) reviews.

This letter advises you of our planned inspection effort resulting from the

Sequoyah Nuclear Plant PPR review and the general time frame of p'lanned inspections plus the exact dates of team inspections.

It is prov ded to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability-to be resolved in advance of inspector 1

arrival onsite. The enclosure details our inspection plan for the next six-months.

Individual inspections are identified by the month (s) in which we intend to conduct the inspection.

Exact dates are not provided for non-team inspections because experience has proven that we must often change dates as the result of higher priority requirements and conflicts at your site or other sites.

You will be contacted three-six weeks prior to individual inspections

- to confirm dates.

The rationale or basis for each inspection outside the core ins)ection program is provided so that you are aware of the reasons for emplasis in these program areas.

Resident inspections are not listed due to their ongoing and continuous nature.

The NRC's general polky-for reactor inspections is that each ins)ection shall

\\\\

I be announced, except when announcing the inspection could reasona)1y compromise the objectives ~of the inspectors.

Therefore, some specific inspections, such as in the security and radiological protection areas, may not be announced; f[*AE EsMa7 G

PDR ggCl

7-4.

s iTVA=

2-

- As-part of.the regional initiative inspection program, we plan to conduct-followu months.p inspections of-fire barrier penetration scal issues during the next 6.

The issues are discussed in Information Notice-(IN) 88-04.

- Seals.guate Qualification and Documentation of Fire Barrier Penetration "Inade

- and IN 88-56,-" Potential Problems with Silicone Foam Fire Barrier Penetration Seals."

.We will inform you of any changes to the inspection plan.

If you have any questions, please contact Mark S. Lesser. Chief. Reactor Projects Branch 6 at (404) 562-4560.

Sincerely.

OriginalSigned by M.S.Lasser Mark S. Lesser. Chief Reactor Projects Branch 6 Division of Reactor Projects Docket Nos.: 50 327 and 50-328 License Nos.:.DRP-/7 and DRP-79

Enclosure:

Inspection Plan cc w/ enc 1:

(See page 3) 4

,4-

~ TVA?

l3, ce w/ enc 1:. -

Senior Vice President-

-Mr. P. Salas, Manager (Nuclear Operations -

Sequoyah Nuclear Plant =

Licensing and Industry-Tennessee Valley Authority:'

P.

0.-

Box 2000:

6A Lookout Place- -

-1101 Market Stree Soddy-Daisy. TN 37379.-

-Chattanooga, TN 37402-2801-

-Mr;-J. T. Herron Plant Manager Mr. J. A. Bailey Sequoyah Nuclear Plant Vice President -

Tennessee Valley Authority Er.gineering and Technical-Services.

P. 0. Box 2000

6A Lookout Place:

Soddy Daisy. TN 37379 1101' Market-Street Chattanooga.:TN 37402-2801-Director Division of Radiological Health

. Site Vice President.

3rd Floor. L and C Annex Mr. M. Bajestani 401-Church Street Sequoyah-Nuclear Plant Nashville TN - 37243-1253~

Tennessee Valley Authority

P. 0. Box 2000 County Executive Soddy-Daisy. TN 37379 Hamilton County Courthouse Chattanooga TN 37402-2801 General: Counsel Tennessee Valley Authority Mr. R. H. Shell. Manager ET 10H-Licensing and Industry Affairs

'400 West Sumit Hill Drive Sequoyah Nuclear Plant Knoxville.-TN 37902 Tennessee Valley Authority Soddy-Daisy. TN 37379 Mr.-R. R. Baron General Manager nuclear Distribution w/ encl:

(See page 4) e Assurance 4J Blue Ridge 1101 Market Street

-Chattanooga TN 37402-2801

Mr. M. J. Burzynski.-Manager m

Nuclear Licensing.

. Tennessee Valley Authority

'4J Blue Ridge 4

1101 Market Streat

. Chattanooga.-TN.37402-2801 e

1

TVA. Distribution w/ encl:

-J. R. Johnson Ril M. S. Lesser. RII

~

S. E. Sparks. RII F. J..Hebdon. NRR R. W. Hernan, NRR W.-C. Bearden..RII C. F.'Sm1th.-RII.

D.-H.-Thompson. RII-L.-S. Mellen. RII E.-D. Testa. RII PUBLIC NRC Resident Inspector U. -S. Nuclear Regulatory Comission 2600 Igou Ferry

. Soddy-Daisy..TN -37379 NRC Resident Inspector U. S. Nuclear Regulatory Commission 1250 Nuclear Plant Road Spring City. TN 37381 h

0FFIG DEP/Ril,

DRS/Ril _ f -

DRS/Ril DRS/Ril, 3

111 OppIl f

Ssea4 Turn -

GSyd y

.yI ef y) /

J)3/

h\\%

khtcuJL.c

~

NAIE -

St e sivys PFr3delckson CClialdt'ensen TPMies(

Gr7

/Asetlate" 04TE =

11/ (o : /97 11/ 7 /97 J1/ 'J

/97 s11/ 7

/97 11/(, /97 11/,6

/97 11/

/97 lenrvt VEs uD YEs un

' YES 11 0 YES IID M!Ik IID 6Ed IID YES 11 0 0FFICIAL MEtXIRD COPY DOCupENT NAfE: G:\\RR6.Se\\LIC-LTR.PPR - V U

IFSPECTION. PLAN-SEQUOYAH INSPECTION TITLE / PROGRAM AREA NUPEER OF PLANNED

. INSPECTION TYPE-INSPECTORS DATES.

C0ffiENTS.

IP:73753 Inservice-Inspection 1

11/97.

Core IP 62700 Maintenance and material condition

-1 12/97-Regional Initiative due to performance l

IP 62707 Maintenance Rule followup 1

12/97 Program directed' IP 93809 Safety System Engineering Inspection 1

1/12-14/98 Core-3 1/26-30/98 3

2/9-13/98 TI Generic Letter 89-10 Closecut 2

1/98 Program directed 2515/109 Inspection IP 73756 Inservice Testing of. pumps and valves 2

1/26-30/98 Regional Initiative due 2

2/2-6/98

~

to performance i

l IP 41500 Training prograu inspection in 3

2/2/98-Regional Initiative due Operations 2/6/98 to performance IP 64704 Fire protection (penetration seals) 1 3/98 Regional initiative.

due to. generic concerns IP 62700 Maintenance testing 1

3/98 Regional Initiative due to performance IP 37550 Engineering Self-Assessment. and 1

3/98 Regional Initiative due Corrective Action Effectiveness to performance Attachment

,