Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20199E954 + (ML20199E954)
- ML20199E955 + (ML20199E955)
- ML20199E956 + (ML20199E956)
- PNO-V-86-033, on 860616,reactor Taken Critical.Caused by Physics Testing.Reactor Will Be Returned to Power on 860618. Problems W/Reactor Control Sys Thermal Expansion & Control Room Ventilation Sys Resolved + (ML20199E959)
- ML20199E960 + (ML20199E960)
- ML20199E961 + (ML20199E961)
- ML20199E962 + (ML20199E962)
- ML20199E964 + (ML20199E964)
- ML20199E965 + (ML20199E965)
- BVY-97-120, Informs That Two Design Basis Documents Have Been Approved & 18 Are in Review Process.Remaining 3 Should Be in Draft Form by End of 1997.Review & Approval Process for All 23 Design Basis Documents Will Be Completed in 1998 + (ML20199E966)
- ML20199E967 + (ML20199E967)
- ML20199E968 + (ML20199E968)
- IR 05000298/1986018 + (ML20199E970)
- ML20199E971 + (ML20199E971)
- ML20199E972 + (ML20199E972)
- ML20199E973 + (ML20199E973)
- ML20199E974 + (ML20199E974)
- 05000255/LER-1998-012, :on 981215,discovered That MSIVs Were Slightly Open Based on Local Stem Position.Caused by High Packing Friction Introduced by Packing Replacement During 1998 Rfo. Completed Actions to Assure MSIVs Will Fully Close + (ML20199E975)
- ML20199E977 + (ML20199E977)
- ML20199E978 + (ML20199E978)
- ML20199E980 + (ML20199E980)
- ML20199E981 + (ML20199E981)
- ML20199E982 + (ML20199E982)
- GO2-99-011, Forwards Rev 38 to Physical Security Plan,Per 10CFR50.54(p). Rev Does Not Decrease Effectiveness of Approved Plan.Encl Withheld,Per 10CFR2.790(a)(3) + (ML20199E984)
- ML20199E985 + (ML20199E985)
- ML20199E986 + (ML20199E986)
- ML20199E987 + (ML20199E987)
- ML20199E988 + (ML20199E988)
- ML20199E990 + (ML20199E990)
- ML20199E991 + (ML20199E991)
- ML20199E993 + (ML20199E993)
- ML20199E994 + (ML20199E994)
- ML20199E996 + (ML20199E996)
- ML20199E998 + (ML20199E998)
- ML20199F001 + (ML20199F001)
- ML20199F002 + (ML20199F002)
- ML20199F003 + (ML20199F003)
- ML20199F005 + (ML20199F005)
- ML20199F006 + (ML20199F006)
- CY-98-008, Provides Response to 971223 & 980108 Telcon RAIs Re Proposed Defueled Emergency Plan for Hnp.Revised Pages,Denoted by Rev Bars in right-hand Margin,Encl + (ML20199F009)
- ML20199F010 + (ML20199F010)
- ML20199F013 + (ML20199F013)
- ML20199F014 + (ML20199F014)
- ML20199F015 + (ML20199F015)
- 0CAN019901, Forwards Monthly Operating Repts for Dec 1998 for Ano,Units 1 & 2.Util Will No Longer Submit Refueling Info as Part of Mor,Effective with Encl Rept,As Discussed with NRR Project Managers on 990113 + (ML20199F016)
- ML20199F018 + (ML20199F018)
- PY-CEI-NRR-2358, Forwards Changes to Emergency Plan Implementing Instructions (Epis) for Perry Npp,Per 10CFR50,App E.Changes Constitute Revs,Temporary Changes or Reissued Pages + (ML20199F022)
- ML20199F024 + (ML20199F024)
- ML20199F027 + (ML20199F027)
- ML20199F029 + (ML20199F029)
- ML20199F031 + (ML20199F031)