Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- NOC-AE-0055, Forwards Rev 11A of STP Physical Security Plan,Per 10CFR73.21.Rev Withheld + (ML20198P617)
- ML20198P618 + (ML20198P618)
- ML20198P619 + (ML20198P619)
- ML20198P620 + (ML20198P620)
- ML20198P622 + (ML20198P622)
- ML20198P624 + (ML20198P624)
- LIC-97-0173, Constitutes Initial Response within 30 Days Required by GL 97-04, Assurance of Sufficient Net Positive Suction Head for ECC & Containment Heat Removal Pumps. OPPD Plans to Submit Info Requested by GL 97-04,within 90 Days + (ML20198P625)
- ML20198P626 + (ML20198P626)
- ML20198P627 + (ML20198P627)
- ML20198P628 + (ML20198P628)
- BSEP-98-0007, Monthly Operating Repts for Dec 1997 for Brunswick Steam Electric Plant,Unit 1 & 2 + (ML20198P630)
- ML20198P631 + (ML20198P631)
- ML20198P632 + (ML20198P632)
- ML20198P634 + (ML20198P634)
- ML20198P635 + (ML20198P635)
- ML20198P636 + (ML20198P636)
- ML20198P639 + (ML20198P639)
- ML20198P641 + (ML20198P641)
- ML20198P642 + (ML20198P642)
- ML20198P643 + (ML20198P643)
- ML20198P644 + (ML20198P644)
- ML20198P645 + (ML20198P645)
- ML20198P647 + (ML20198P647)
- ML20198P648 + (ML20198P648)
- L-97-052, Proposed TS Change Request 243 to License DPR-66,modifying TS Table 3.3-4 Re Emergency Bus Undevoltage Trip Setpoint, Allowable Valve & Time Delay for DG Start + (ML20198P649)
- ML20198P650 + (ML20198P650)
- ML20198P654 + (ML20198P654)
- ML20198P655 + (ML20198P655)
- ML20198P656 + (ML20198P656)
- ML20198P657 + (ML20198P657)
- ML20198P659 + (ML20198P659)
- ML20198P660 + (ML20198P660)
- ML20198P664 + (ML20198P664)
- ML20198P666 + (ML20198P666)
- ML20198P669 + (ML20198P669)
- ML20198P670 + (ML20198P670)
- BSEP-97-0488, Provides 30-day Response to GL 97-04, Assurance of Sufficient Net Positive Suction Head for ECC & Containment Heat Removal Pumps. Commitment Made by Util,Encl + (ML20198P671)
- ML20198P672 + (ML20198P672)
- ML20198P673 + (ML20198P673)
- ML20198P674 + (ML20198P674)
- ML20198P676 + (ML20198P676)
- U-602857, Provides 30-day Response to GL 97-04, Assurance of Sufficient Net Positive Suction Head for ECC & Containment Heat Removal Pumps. Util Will Submit Info Requested within 90 Days + (ML20198P679)
- ML20198P680 + (ML20198P680)
- ML20198P684 + (ML20198P684)
- ML20198P687 + (ML20198P687)
- ML20198P689 + (ML20198P689)
- ML20198P690 + (ML20198P690)
- ML20198P692 + (ML20198P692)
- ML20198P695 + (ML20198P695)
- ML20198P696 + (ML20198P696)
- 05000454/LER-1997-016-04, :on 971007,projected SG Leak Rate Combined with TS Limit for Dose Equivalent Iodine Creates Potential for Operation Outside Design Basis.Caused by Projected Leakage & Leakrate Limits.Sg Are Being Replaced + (ML20198P698)