Informs That Training Module for X-343 Shipping & Receiving Operations & Procedure XP4-TE-FD2400 Have Been Revised to Meet Conditions of Approval in Coc 6553,rev 12,that Were Not Observed in Making Shipments of Paducah Product Cylinders
ML20198P639
Person / Time
Site: Portsmouth Gaseous Diffusion Plant
Issue date: 10/24/1997
From: Allen D
UNITED STATES ENRICHMENT CORP. (USEC)
To: Paperiello C
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
References
GDP-97-2025, NUDOCS 9711100023
Download: ML20198P639 (2)


Text

_

United States Enrichment Corporation l

2 0emocracy Center j

6903 Rockleidge Drive Bethesda, MD 20817 101. (301)S64 3200 raa:(301)564 3201 October 24,1797 GDP-97-2025 Dr. Carl J. Paperiello, Director Omce of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, D. C. 20555 Portsmouth Gaseous Diffusion Plant (PORTS). Docket No. 70-7bO2 to CFR 71.95 Report - Event Re;, ort 97-18 in accordance with 10 CFR 71.95(c), this is notification that all of the conoitions of approval in the Certificate of Comrliance (#6353, Rev.12) were not observed in making sh:pments of Paducah Product cylinders in September,1997. On September 26,1997, the Portsmouth Gaseous Diffusion Plant (PORTS) was notified by Paducah Gaseous Diffusion Plant personnel that four empty cylinders with heels had been received from PORTS which were loaded backwards into their protective overpacks. This violated the Certificate of Compliance requirement that the valve end of the cylinder be protected by the 3/8 inch stainless steel breakaway plate inside the overpack.

Following discovery of this condition, shipments were halted until PORTS opened and inspected the overpacks which had been pre ved for shipment but not yet shipped. The inspection confirmed that the cylinders were properly loaded. Shift briefings were held with PORTS personnel who load cylinders to emphasize proper cylinder orientation in the overpacks.

Procedure XP4-TE FD2400, " Shipping and Receiving Large UF. Cylinders," provides guidance to personnel on loading cylinders into the overpacks. The procedure stated that the cylinders will only fit one way into the overpack, llowever, the PORTS personnel who installed the cylinders I backwards stated that the cylinders fit into the overpacks without dimculty. As a result, a procedure g

7 change was initiated to revise procedure XP4 TE FD2400 to provide improved guidance on how to 7,,%

ensure the cylinder is properly oriented within the overpack. The training module for X 343 p '

Shipping and Receiving Operations (OM1102.05.01) will also be revised to reflect this information.

kkk,kk k

9711100023 971024 PDR ADOCK 07007002 C

PDR

- omces in Uvermore, Cahfomia Paducah, Kentucky Fortsmouth, Ohio Washington, DC

Unitep States Nuclear Regulatory Commission

  • October 24,1997 Page Two if you have any questions concerning this notification, please call Scott Scholl at (614) 897 2373.

Sincerely.

Nk Dale Allen-General Manager Portsmouth Gaseous Diliusion Plant DIA:SScholl:kpb cc: -

D. Ilartland, NRC Resident inspector, PORTS NRC Region til e

r

..-