Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20198P141 + (ML20198P141)
- A98004, Monthly Operating Repts for Dec 1997 for Zion Station,Units 1 & 2 + (ML20198P145)
- ML20198P147 + (ML20198P147)
- ML20198P149 + (ML20198P149)
- ML20198P151 + (ML20198P151)
- 05000327/LER-1986-020, :on 860501,quarterly Function Test for Sys Generator Blowdown Sys & Condenser Vacuum Exhaust Flow Instrumentation Not Performed.Caused by Not Including Channel in Procedure.Instruction Revised + (ML20198P153)
- ML20198P154 + (ML20198P154)
- NSD-NRC-97-5409, Forwards W Responses to RAIs 640.98 & 640.99 Re Comments from Human Factors Assessment Branch on Rev 3 of AP600 Certified Design Matl Including ITAAC as Requested in Ltr from Staff + (ML20198P155)
- ML20198P156 + (ML20198P156)
- ML20198P157 + (ML20198P157)
- ML20198P160 + (ML20198P160)
- ML20198P161 + (ML20198P161)
- ML20198P162 + (ML20198P162)
- ML20198P163 + (ML20198P163)
- LIC-97-0168, Constitutes Withdrawal of Request for Exemption from 10CFR73.55(d)(5),allowing Use of Biometric Hand Geometry Reader Sys to Interface W/Existing Access Control Card Reader Sys in Controlling Unescorted Access + (ML20198P165)
- ML20198P168 + (ML20198P168)
- LIC-97-0169, Responds to NRC Re Violations Noted in Insp Rept 50-285/97-13 on 970630-0718.Corrective Actions:Review of Category B Valves Tested Under IST Program Was Performed to Identify Valves That Are Ganged Together + (ML20198P170)
- ML20198P172 + (ML20198P172)
- ML20198P174 + (ML20198P174)
- ML20198P175 + (ML20198P175)
- ML20198P176 + (ML20198P176)
- ML20198P179 + (ML20198P179)
- ML20198P181 + (ML20198P181)
- ML20198P182 + (ML20198P182)
- ML20198P183 + (ML20198P183)
- ML20198P186 + (ML20198P186)
- ML20198P188 + (ML20198P188)
- ML20198P189 + (ML20198P189)
- ML20198P192 + (ML20198P192)
- ML20198P193 + (ML20198P193)
- ML20198P194 + (ML20198P194)
- ML20198P196 + (ML20198P196)
- ML20198P197 + (ML20198P197)
- ML20198P198 + (ML20198P198)
- ML20198P200 + (ML20198P200)
- ML20198P204 + (ML20198P204)
- ML20198P206 + (ML20198P206)
- IR 05000213/1986008 + (ML20198P209)
- 3F1197-33, Submits Response Relative to GL 97-04, Assurance of Sufficient Net Positive Suction Head for ECC & Containment Heat Removal Pumps. Attachment Identifies Commitments Made in Ltr + (ML20198P210)
- ML20198P213 + (ML20198P213)
- 3F1197-28, Forwards Addl Info to Clarify Matl Included in Attachment G to EDG Test Plan of .Info Does Not Alter Any Conclusions of TS Change Request Notice 210 & Ltr Contains Info Requested by NRC in 971028 Meeting.Commitments Encl + (ML20198P214)
- ML20198P216 + (ML20198P216)
- ML20198P219 + (ML20198P219)
- ML20198P220 + (ML20198P220)
- ML20198P221 + (ML20198P221)
- ML20198P225 + (ML20198P225)
- 05000302/LER-1997-032, :on 970406,discovered Inadequate Electrical Isolation on Safety Related Power Supply.Caused by Design Error.Isolation Device Will Be Installed or Solenoid Valve Will Be Replaced W/Sr Solenoid Prior to Mode 4 + (ML20198P226)
- ML20198P227 + (ML20198P227)
- 05000423/LER-1986-033, :on 860429,low Level Waste Tank Discharged W/Radiation Monitor Sample Pump Deenergized,Rendering Liquid Effluent Monitoring Instrumentation Inoperable.Caused by Operator Error + (ML20198P229)
- ML20198P234 + (ML20198P234)
- 0CAN019804, Monthly Operating Repts for Dec 1997 for ANO Units 1 & 2 + (ML20198P235)