Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20198L665 + (ML20198L665)
- ML20198L666 + (ML20198L666)
- ML20198L667 + (ML20198L667)
- IR 05000440/1997014 + (ML20198L672)
- ML20198L673 + (ML20198L673)
- ML20198L675 + (ML20198L675)
- ML20198L676 + (ML20198L676)
- ML20198L677 + (ML20198L677)
- ML20198L678 + (ML20198L678)
- PNO-III-89-081, on 871207,Dow Chemical Co Issued News Announcement Re Application to NRC for Authorization to Dispose of Th-Mn Slag Materials at Licensed Owned Landfill Sit Near Midland,Mi + (ML20198L681)
- ML20198L684 + (ML20198L684)
- PNO-III-89-066, on 890919,during Routine Maintenance,Licensee Identified Two Environmentally Unqualified AMP Butt Splices on Recirculation Sys Sample Line Valve in Drywell.Licensee Instituted two-phase Program to Correct Addl Splices + (ML20198L685)
- ML20198L686 + (ML20198L686)
- ML20198L687 + (ML20198L687)
- ML20198L688 + (ML20198L688)
- ML20198L689 + (ML20198L689)
- ML20198L692 + (ML20198L692)
- ML20198L693 + (ML20198L693)
- IR 05000456/1997001 + (ML20198L696)
- ML20198L697 + (ML20198L697)
- ML20198L698 + (ML20198L698)
- ML20198L699 + (ML20198L699)
- 05000416/LER-1986-017, :on 860430,wrong Fuse Pulled During Attempt to Deactivate Containment Isolation Valve Causing Actuation of Combustible Gas Control Subsystem A.Fuse Reinserted & Sys Returned to Standby.Operator Disciplined + (ML20198L700)
- ML20198L701 + (ML20198L701)
- ML20198L705 + (ML20198L705)
- ML20198L706 + (ML20198L706)
- ML20198L708 + (ML20198L708)
- ML20198L712 + (ML20198L712)
- ML20198L713 + (ML20198L713)
- ML20198L717 + (ML20198L717)
- ML20198L720 + (ML20198L720)
- ML20198L721 + (ML20198L721)
- ML20198L722 + (ML20198L722)
- PNO-III-89-085, on 891206,three Employee Entered Irradiation Cell Assuming That Co-60 Sources Had Been Fully Retracted Into Shielded Position Near Botton of 23 Ft Pool of Water. Licensee Determined That Limit Switch/Interlock Sys Failed + (ML20198L726)
- ML20198L730 + (ML20198L730)
- ML20198L731 + (ML20198L731)
- ML20198L732 + (ML20198L732)
- ML20198L735 + (ML20198L735)
- IR 05000271/1997013 + (ML20198L741)
- ML20198L742 + (ML20198L742)
- ML20198L743 + (ML20198L743)
- ML20198L745 + (ML20198L745)
- IR 05000263/1997016 + (ML20198L748)
- ML20198L752 + (ML20198L752)
- ML20198L753 + (ML20198L753)
- IR 05000271/1998013 + (ML20198L754)
- ML20198L757 + (ML20198L757)
- IR 015000038/1997001 + (ML20198L758)
- ML20198L763 + (ML20198L763)
- PNO-III-89-075, on 891122,startup Process of Reactor Was Terminated When Nuclear Instrumentation Showed That Reactor Was Approaching Criticality Sooner than Anticipated + (ML20198L764)
- ML20198L765 + (ML20198L765)