Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20198D762 + (ML20198D762)
- BSEP-85-1827, Special Rept 2-SR-85-03:on 850915,fire Detection Sys Zone 5 Instrumentation for 20-ft Elevation in Reactor Bldg Declared Inoperable Due to Erroneous Fire Alarm.Specified 14-day Time Frame Exceeded on 850929.Instrumentation Returned to S + (ML20198D764)
- ML20198D765 + (ML20198D765)
- ML20198D767 + (ML20198D767)
- ML20198D768 + (ML20198D768)
- ML20198D772 + (ML20198D772)
- ML20198D773 + (ML20198D773)
- 05000370/LER-1997-004, (S)-00:on 971204,discovered Deliberate Damage to Unit 2 Personnel Airlock Door Seals.Caused by Tampering. Immediately Placed Security Personnel at Containment Access & Personnel Asked to Heighten Awareness of Surroundings + (ML20198D774)
- ML20198D777 + (ML20198D777)
- ML20198D778 + (ML20198D778)
- 05000454/LER-1985-091, :on 851009,auxiliary Bldg Charcoal Booster Fan Automatically Started.Output Contact from Energized Unit 2 ESF Relay Not Properly Isolated from Unit 1 Associated Equipment.Caused by Installation Error + (ML20198D783)
- ML20198D784 + (ML20198D784)
- ML20198D786 + (ML20198D786)
- ML20198D789 + (ML20198D789)
- ML20198D792 + (ML20198D792)
- ML20198D793 + (ML20198D793)
- ML20198D794 + (ML20198D794)
- ML20198D798 + (ML20198D798)
- ML20198D800 + (ML20198D800)
- ML20198D801 + (ML20198D801)
- ML20198D803 + (ML20198D803)
- ML20198D805 + (ML20198D805)
- ML20198D806 + (ML20198D806)
- ML20198D807 + (ML20198D807)
- ML20198D808 + (ML20198D808)
- ML20198D809 + (ML20198D809)
- ML20198D812 + (ML20198D812)
- ML20198D817 + (ML20198D817)
- ML20198D819 + (ML20198D819)
- L-98-231, Informs That Review of UFSAR for BVPS Units 1 & 2 Will Be Completed by 000330 for risk-significant Items & 010330 for All Other Issues,Per Enforcement Guidance Memo EGM 98-007 + (ML20198D820)
- ML20198D821 + (ML20198D821)
- ML20198D823 + (ML20198D823)
- NUREG-0519, Safety Evaluation of Final in-plant Safety/Relief Valve Test Evaluation Rept Per SER (NUREG-0519).Design Adequate to Accommodate Loads Associated W/Activation of One or More Safety Relief Valves + (ML20198D824)
- ML20198D827 + (ML20198D827)
- ML20198D828 + (ML20198D828)
- ML20198D830 + (ML20198D830)
- ML20198D832 + (ML20198D832)
- ML20198D833 + (ML20198D833)
- 05000354/LER-1998-008-02, :on 981115,ESFA Automatic Reactor Scram, Occurred.Caused by High Moisture Separator Level.Moisture Separator Drain Tank Dump Valves Were Tested Satisfactorily While Shutdown & Again During Restart + (ML20198D835)
- ML20198D838 + (ML20198D838)
- ML20198D839 + (ML20198D839)
- ML20198D841 + (ML20198D841)
- IR 05000364/1999301 + (ML20198D843)
- ML20198D845 + (ML20198D845)
- ML20198D847 + (ML20198D847)
- ML20198D848 + (ML20198D848)
- ML20198D849 + (ML20198D849)
- ML20198D850 + (ML20198D850)
- ML20198D853 + (ML20198D853)
- ML20198D854 + (ML20198D854)
- ML20198D855 + (ML20198D855)