Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20198B254 + (ML20198B254)
- ML20198B256 + (ML20198B256)
- ML20198B258 + (ML20198B258)
- ML20198B259 + (ML20198B259)
- NG-98-2010, Monthly Operating Rept for Nov 1998 for Daec.With + (ML20198B260)
- ML20198B261 + (ML20198B261)
- ML20198B263 + (ML20198B263)
- ML20198B265 + (ML20198B265)
- ML20198B266 + (ML20198B266)
- JAFP-98-0396, Monthly Operating Rept for Nov 1998 for Ja FitzPatrick Npp. with + (ML20198B267)
- 05000267/LER-1985-020, :on 851001,at Less than 1% Power,Reactor Manually Scrammed Due to Primary Coolant Flow Reduction & Condenser Vacuum Loss.Caused by Loss of Auxiliary Boilers Used to Supply Steam.Boilers Returned to Svc + (ML20198B268)
- ML20198B270 + (ML20198B270)
- ML20198B271 + (ML20198B271)
- ML20198B272 + (ML20198B272)
- ML20198B273 + (ML20198B273)
- ML20198B274 + (ML20198B274)
- ML20198B275 + (ML20198B275)
- ML20198B277 + (ML20198B277)
- ML20198B278 + (ML20198B278)
- ML20198B281 + (ML20198B281)
- ML20198B282 + (ML20198B282)
- ML20198B283 + (ML20198B283)
- ML20198B284 + (ML20198B284)
- ML20198B286 + (ML20198B286)
- U-602896, Provides 90-day Response to GL 97-04, Assurance of Sufficient Net Positive Suction Head for ECC & Containment Heat Removal Pumps + (ML20198B288)
- ML20198B289 + (ML20198B289)
- ML20198B291 + (ML20198B291)
- 05000263/LER-1997-013-01, :on 971125,manual Scram Was Inserted Due to Loss of Condenser Vacuum.Caused by Electrical Fault Tripping.Temporary Cables Were Installed Primarily Above Ground + (ML20198B292)
- ML20198B293 + (ML20198B293)
- ML20198B297 + (ML20198B297)
- ML20198B298 + (ML20198B298)
- ML20198B299 + (ML20198B299)
- ML20198B301 + (ML20198B301)
- ML20198B302 + (ML20198B302)
- ML20198B303 + (ML20198B303)
- ML20198B304 + (ML20198B304)
- ML20198B307 + (ML20198B307)
- ML20198B308 + (ML20198B308)
- ML20198B309 + (ML20198B309)
- ML20198B310 + (ML20198B310)
- ML20198B312 + (ML20198B312)
- ML20198B314 + (ML20198B314)
- 05000316/LER-1985-013, :on 850726,frost Accumulation in Excess of Tech Spec Found within Ice Condenser Flow Passages.Caused by Excessive Moisture in Air or Sublimation of Ice.Frost Buildup Removed on 850728 + (ML20198B315)
- ML20198B319 + (ML20198B319)
- ML20198B320 + (ML20198B320)
- PLA-4828, Expresses Appreciation for Support Received by Former Project Manager C Poslusny + (ML20198B321)
- ML20198B324 + (ML20198B324)
- ML20198B325 + (ML20198B325)
- 05000271/LER-1985-010, :on 851003,insp of Conductors Revealed Contact W/Sharp Edge of End of Electrical Penetration Assembly Sleeve.Edgeguard/Insulating Matl Installed & Addl Insp Planned + (ML20198B328)
- 05000423/LER-1998-044, :on 981111,manual Reactor Trip Initiated When Differential Pressure Between a & B CWS Condensers Measured Greater than 2 Inches Water Gauge.Caused by High Levels of Debris Impinging.Modified Procedures + (ML20198B330)
- 05000255/LER-1985-019, :on 850930,review of Tech Spec Surveillance Test Procedures Identified Deficiency Re Failure to Verify Containment Isolation Initiation Due to Containment High Radiation Signal.Caused by Inadequate Review + (ML20198B331)