Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20197B323 + (ML20197B323)
- B16917, Informs That Util Will Provide Next Update on Approximately 980123 Rather than 971219 + (ML20197B324)
- ML20197B325 + (ML20197B325)
- ML20197B326 + (ML20197B326)
- 05000338/LER-1978-105-03, /03L-0:on 781010,axial Flux Difference Deviated Greater than 5%.Caused by Rapid Load Reduction Necessitated by Problems W/Condenser Circulating Water Valve + (ML20197B328)
- 05000334/LER-1997-036, :on 971113,inadequate Channel Check for Meteorological Monitoring Instrumentation Was Noted.Caused by Inadequate Change Mgt.Hp Was Requested to Perform Channel Checks & Rept Results to CR + (ML20197B329)
- ML20197B330 + (ML20197B330)
- ML20197B331 + (ML20197B331)
- NSD-NRC-97-5488, Forwards W Revised Response to RAI 480.1079 Related to 15 Comments Received from Staff Concerning 0RWST & Recirculation Screens During AP600 ITAAC Task Group Meeting on 971204.Encl Closes Open Item 5740 + (ML20197B332)
- TXX-6045, Interim Deficiency Rept CP-84-12 Re Impact of High Energy Line Break Temp on Qualified Equipment Outside Containment. Initially Reported on 840604.Comparison of Cable Temp to Existing Qualified Temps Unresolved.Next Rept by 861219 + (ML20197B333)
- ML20197B335 + (ML20197B335)
- TXX-6030, Interim Deficiency Rept CP-85-31 Re Electrical Raceway Support Sys.Initially Reported on 850827.Conduit Raceways Affected by Installation of Radiant Energy Shield Matl Identified.Next Rept Will Be Submitted by 861205 + (ML20197B337)
- ML20197B340 + (ML20197B340)
- 05000529/LER-1986-049-01, :on 860923,automatic Reactor Protection Sys Actuation Initiated Reactor Trip Due to Low Level in Steam Generator 1.Caused by Inadequate Operating Procedure. Operating Procedures Revised + (ML20197B342)
- 05000338/LER-1978-106-03, /03L-0:on 781010,power-range Instrumentation Channel N-41 Taken Out of Svc to Facilitate Replacement of Faulty Gain Pot.Caused by Dirt in Potentiometer,Resulting in Erratic Gain + (ML20197B343)
- TXX-6044, Interim Deficiency Rept CP-86-36 Re Large Bore Piping Supports.Initially Reported on 860609.Scope Revised to Delete Small Bore ASME Class 2 & 3 Piping to Provide More Accurate Results.Next Rept Will Be Submitted by 861201 + (ML20197B346)
- ML20197B347 + (ML20197B347)
- TXX-6036, Interim Deficiency Rept CP-86-48 Re Adequacy of Nonconformance Dispositions.Initially Reported on 860616. Review of Nonconformance Rept Samples Conducted to Determine Safety Significance.Next Rept Will Be Submitted by 870715 + (ML20197B348)
- NSD-NRC-97-5489, Forwards W Responses to RAIs 640.69 & 640.164 Related to Comments Received from Staff on Rev 3 of AP600 Certified Design Matl Including ITAAC as Requested in Ltrs from Staff & 1106.Encl Closes Open Items 5728 & 6192 + (ML20197B349)
- TXX-6049, Interim Deficiency Rept CP-85-42 Re Adverse Effects of Substituting Sections of Thermolags on Conduit Supports. Initially Reported on 850920.Analysis of Conduits,Supports & Appurtenances Continuing.Next Rept Expected by 861215 + (ML20197B351)
- 05000338/LER-1997-009-01, :on 971118,incomplete Surveillance on Solid State Protection Circuits Was Noted.Caused by Inadequate Design by Vendor.Controlling Tps Were Revised to Include Instructions to Test Affected Logic Circuits + (ML20197B352)
- NSD-NRC-97-5490, Forwards W Responses to FSER Open Items on AP600.Summary of Encl Responses Is Provided in Table 1,which Includes FSER Open Item Number,Associated Oits Number & Status to Be Designated in W Status Column of Oits + (ML20197B356)
- ML20197B358 + (ML20197B358)
- ML20197B359 + (ML20197B359)
- ML20197B360 + (ML20197B360)
- ML20197B361 + (ML20197B361)
- ML20197B362 + (ML20197B362)
- ML20197B363 + (ML20197B363)
- A97181, Requests That Listed Changes Be Made to Document Svc List for Info Re Pbaps,Units 2 & 3 + (ML20197B364)
- ML20197B365 + (ML20197B365)
- 05000312/LER-1985-022, :on 851120,pressurized Sampling Valve HV-21516 Found in Open Position W/Breaker Racked Out.Caused by Lack of Administrative Control.Process Sampling Procedures & Operator Training Upgraded + (ML20197B366)
- IR 05000275/1997021 + (ML20197B368)
- ML20197B369 + (ML20197B369)
- ML20197B370 + (ML20197B370)
- ML20197B372 + (ML20197B372)
- ML20197B376 + (ML20197B376)
- ML20197B377 + (ML20197B377)
- PY-CEI-NRR-2239, Responds to NRC Re Violations Noted in Insp Rept 50-440/97-12.Corrective Actions:Svi Was Reviewed & Transferred Data & Time Chart Increments Were Found to Be Incorrect Errors Were Corrected & Results Met Svi Criteria + (ML20197B380)
- ML20197B382 + (ML20197B382)
- ML20197B383 + (ML20197B383)
- ML20197B385 + (ML20197B385)
- ML20197B386 + (ML20197B386)
- ML20197B392 + (ML20197B392)
- ML20197B394 + (ML20197B394)
- ML20197B395 + (ML20197B395)
- ML20197B396 + (ML20197B396)
- ML20197B398 + (ML20197B398)
- ML20197B400 + (ML20197B400)
- ML20197B401 + (ML20197B401)
- ML20197B403 + (ML20197B403)
- ML20197B404 + (ML20197B404)