Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20195K412 + (ML20195K412)
- ML20195K415 + (ML20195K415)
- ML20195K416 + (ML20195K416)
- 05000344/LER-1988-041, :on 881028,safety Injection Trains Rendered Inoperable & Tech Spec 3.0.3 Entered.Caused by Intentional Closure of Valve MO-8813 Due to Loose Metal Plate Attached to Stem of Valve + (ML20195K418)
- ML20195K420 + (ML20195K420)
- ML20195K421 + (ML20195K421)
- ML20195K422 + (ML20195K422)
- ML20195K427 + (ML20195K427)
- 05000362/LER-1999-003-01, :on 990513,reactor Manually Tripped Due to Loss of Main Feedwater.Caused by Open Relay Contact in Output of Feedwater Regulation Control Sys.Faulty Relay Was Replaced + (ML20195K428)
- ML20195K429 + (ML20195K429)
- ML20195K430 + (ML20195K430)
- 05000344/LER-1988-042, :on 881029,instrument Air Pressure 98 Psig & Decreasing While Containment Air Pressure Increasing.Caused by Poor Workmanship on Soldered Joint.Temporary Repair Made to Rupture Joint Using Nylon Strap & Tie Wire + (ML20195K431)
- ML20195K432 + (ML20195K432)
- ML20195K433 + (ML20195K433)
- ML20195K434 + (ML20195K434)
- 05000362/LER-1999-004, :on 990515,reactor Manually Tripped Due to Feedwater Control Valve Opening.Caused by Faulty Valve Positioner.Faulty Positioner Was Replaced + (ML20195K435)
- ML20195K436 + (ML20195K436)
- ML20195K438 + (ML20195K438)
- IR 05000413/1988006 + (ML20195K439)
- BSEP-88-1228, Special Rept 1-SR-88-003:on 881120,7-day Time Frame for Limiting Condition for Operation Exceeded.Caused by Fire Door 211 Being out-of-svc to Prevent Wear & Possible Damage to Locking Seals & Interlocks + (ML20195K441)
- ML20195K442 + (ML20195K442)
- ML20195K443 + (ML20195K443)
- ML20195K444 + (ML20195K444)
- 3F1198-01, Application for Amend to License DPR-72,consisting of LAR 240,re Addition of safety-related diesel-driven Emergency Feedwater Pump.Overview of Proposed Mods Presented to NRC on 980921.Addl Info on post-mod Testing Will Be Sent by 990129 + (ML20195K446)
- ML20195K448 + (ML20195K448)
- ML20195K449 + (ML20195K449)
- ML20195K454 + (ML20195K454)
- ML20195K455 + (ML20195K455)
- ML20195K456 + (ML20195K456)
- ML20195K457 + (ML20195K457)
- ML20196A000 + (ML20196A000)
- ML20196A001 + (ML20196A001)
- ML20196A002 + (ML20196A002)
- ML20196A003 + (ML20196A003)
- ML20196A004 + (ML20196A004)
- BSEP-88-1235, Informs That Reactor & Turbine Bldg Ventilation Flow Rate Measurement Devices Will Be Completed by 890303 Instead of 900113.Plant Mods Required to Correct Design Problems W/Sys Can Be Expedited + (ML20196A010)
- ML20196A011 + (ML20196A011)
- NOC-AE-000548, Forwards Response to RAI Re Proposed Amends on Replacement SG Water Level Trip Setpoint Differences for Stp,Units 1 & 2.Nothing Contained in Response Should Be Considered Commitment Unless So Specified in Separate Correspondence + (ML20196A012)
- ML20196A015 + (ML20196A015)
- ML20196A017 + (ML20196A017)
- ML20196A018 + (ML20196A018)
- ML20196A019 + (ML20196A019)
- ML20196A025 + (ML20196A025)
- ML20196A029 + (ML20196A029)
- ML20196A030 + (ML20196A030)
- BSEP-99-0095, Monthly Operating Repts for May 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With + (ML20196A031)
- ML20196A033 + (ML20196A033)
- NOC-AE-0559, Forwards STP Commitment Change Summary Rept for Period 981209-990610.Rept Lists Each Commitment for Which Change Was Made During Reporting Period & Provides Basis for Each Change + (ML20196A035)
- ML20196A036 + (ML20196A036)
- ML20196A037 + (ML20196A037)
- ML20196A038 + (ML20196A038)