Supplemental Deficiency Rept CP-88-29 Re Feedwater Design Mod Not Incorporated in to FSAR Chapter 15.Initially Reported on 880422.Corrective Action Implementation Schedule Will Be Revised.Completion Anticipated by 890303
ML20195K438
Person / Time
Site: Comanche Peak  
Issue date: 11/30/1988
From: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
CP-88-29, TXX-88812, NUDOCS 8812050215
Download: ML20195K438 (1)


Text

..T

--F%

Log # TXX-88812 1

Fi1e # 10110 r

=

910.4 7UELECTRIC Ref. # 10CFR50.55(e)

November 30, 1988 E.On?,S:u?rraY, san, U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C.

20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 FEEDWATER SPLIT-FLOW BYPASS VALVES SDAR: CP-88-29 (SUPPLEMENTAL REPORT)

Gentlemen:

On April 22, 1988, TV Electric notified the NRC by our letter logged TXX-88384 of a deficiency involving a feedwater design modification which was not incorporated into the FSAR Chapter 15 accident analysis. Our last report on this issue was logged TXX-88761 dated October 31, 1988.

The purpsse of this supplemental report is to revise the corrective action implementation schedule.

Qualification of the feedwater split-flow bypass valve is continuing and will be complete by March 3, 1989.

J Very truly yours,,

l 0W W. G. Counsil JDS/gj c - Mr. R. D. Martin, Region IV Resident inspectors, CPSES (3) fE71 GG12050215 881130