Forwards Insp Repts 50-413/88-06 & 50-414/88-06 on 880111- 15.Violations Re Apparent Failure to Meet Reporting Requirements for Operability of Nuclear Svc Water Sys Under Consideration for Escalated Enforcement Action
ML20195K422
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 01/27/1988
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Tucker H
DUKE POWER CO.
Shared Package
ML20195K426 List:
References
NUDOCS 8802040199
Download: ML20195K422 (2)


See also: IR 05000413/1988006

Text

- __-_ -_ _ _

" *

, .

,

.

.

JAN 27USB

Docket Nos. 50-413 and 50-414

License Nos. NPF-35 and NPF-52

Duke Power Company

cATTN: Mr. H. B. Tucker, Vice President -

Nuclear Production Department

422 South Church Street

Charlotte, NC 28242

Gentlemen:

SUBJECT: NRC INSPECTION REPORT NOS. 50-413/88-06 AND 50-414/88-06

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

P K. VanDoorn and M. S. Lesser on January 11-15, 1988. The inspection

included a review of activities authorized for your Catawba facility. At the

conclusion of the inspection, the findings.were discussed with those members

of your staff identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, and interviews with personnel.

The inspection findings indicate that certain activities appeared to violate

NRC requirements. We are concerned that reporting requirements may not have

been met with regard to the operability of the Nuclear Service Water (RN)

system. This and the violation described in paragraph 3 are under

consideration for escalated enforcement action. Accordingly a Notice of

Violation is not enclosed and no response to this violation is required at this

time. Nowever, please be advised that the number and characterization of this

violation described in the enclosed Inspection Report may change as a result of

further NPC review. An Enforcement Conference to discuss this violation will

be scheduled at a future date. You will be advised by separate correspondence

of the results of our deliberations on this matter.

In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its

enclosure will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely,

omW105D Bu

L HaS0tl GPXE

B002040199BBh413

PDR ADOCK O PDR '

J. Nelson Grace

0

-

Regional Administrator

Enclosure: (See page 2)

, .rEo/

. .. . . . .=- .

,

\:

.

,

y '

,

,_ ,

Duke Power Company 2

l JAN 2 7 1989

Enclosure: '

NRC Inspection Report

cc w/ encl:

'tg W. Hampton, Station' Manager

.

AniorResidentInspector-McGuire

'

bec w/ enc 1:

t,E N. Jabbour, NRR

,

t)RC Resident Inspector

l DRS Technical Assistant

i. Document Control Desk

i State of South Carolina  ;

!

i

l

l

I

L

l

[

,

.

I

t

,

l

/ j f' '

G TEW K W.S

//w.r/// \1

! th

BBonser TP e les MErnst i

(tVBrownlee L ey(es 1/ /88

1/.10/88 1/3/88 1/J.c/88 1/>/88