Text
- __-_ -_ _ _
"
.
,
,
.
.
JAN 27USB
Docket Nos. 50-413 and 50-414
License Nos. NPF-35 and NPF-52
Duke Power Company
cATTN: Mr. H. B. Tucker, Vice President
-
Nuclear Production Department
422 South Church Street
Charlotte, NC 28242
Gentlemen:
SUBJECT:
NRC INSPECTION REPORT NOS. 50-413/88-06 AND 50-414/88-06
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
P
K. VanDoorn and M. S.
Lesser on January 11-15, 1988.
The inspection
included a review of activities authorized for your Catawba facility.
At the
conclusion of the inspection, the findings.were discussed with those members
of your staff identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report.
Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, and interviews with personnel.
The inspection findings indicate that certain activities appeared to violate
NRC requirements.
We are concerned that reporting requirements may not have
been met with regard to the operability of the Nuclear Service Water (RN)
system.
This and the violation described in paragraph 3 are under
consideration for escalated enforcement action.
Accordingly a Notice of
Violation is not enclosed and no response to this violation is required at this
time.
Nowever, please be advised that the number and characterization of this
violation described in the enclosed Inspection Report may change as a result of
further NPC review.
An Enforcement Conference to discuss this violation will
be scheduled at a future date.
You will be advised by separate correspondence
of the results of our deliberations on this matter.
In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its
enclosure will be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely,
omW105D Bu
L HaS0tl GPXE
B002040199BBh413
ADOCK O
J. Nelson Grace
'
0
Regional Administrator
-
Enclosure:
(See page 2)
.rEo/
,
.
..
.
.
. .=-
.
,
\\:
- .
,y
'
,
Duke Power Company
2
,_
,
JAN 2 7 1989
l
Enclosure:
'
NRC Inspection Report
cc w/ encl:
'tg W. Hampton, Station' Manager
AniorResidentInspector-McGuire
.
'
bec w/ enc 1:
t,E N. Jabbour, NRR
,
t)RC Resident Inspector
l
DRS Technical Assistant
i.
Document Control Desk
i
State of South Carolina
!
i
l
l
I
L
l
[
,
.
I
t
,
/ j f' '
l
G TEW K W.S
//w.r///
\\
1
!
th
MErnst
i
BBonser
TP e les
(tVBrownlee
L ey(es
1/.10/88
1/3/88
1/J.c/88
1/>/88
1/ /88