ML20195K427

From kanterella
Jump to navigation Jump to search

Submits Listed Documents to Support Audit of Implementation of IE Bulletin 79-27, Loss of Non-Class 1E Instrumentation & Control Power Sys Bus During Operation
ML20195K427
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 11/30/1988
From: Shelton D
TOLEDO EDISON CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
1617, IEB-79-27, TAC-68201, NUDOCS 8812050209
Download: ML20195K427 (4)


Text

.o

/

TOLEDO EDISON A Caww Evgr Cm DONALD C 8HELTON Docket Number 50-346 License Number NPF-3 Serial Number 1617 November 30, 1988 United States Nuclear Regulatory Commission Document Control Desk Vashingtor., D. C.

20555 Subj ect:

Audit to Verify Resolution of Inspection and Enforcement Bulletin 79-27 (TAC No. 68201)

Gentlemen In a letter (Log No. 2748) dated October 31, 1988, the NRC requested that Toledo Edison provide the following documents to support the Staff audit of the Davis-Besse Nuclear Power Station implementation of IE Bulletin 79-27 (Loss of Non-Class IE Instrumentation and Control Pover System Bus During Operation):

(1) Plant electrical single line diagrams that identify and show the total plant electrical distribution system including all Class IE and non-Class IE power supplies to instruments, controls, main control room indication, annunciation, and ICS/NNI.

(2) Load lists of all Class IE and non-Class IE instrumentation and control power supply buses.

(3) Toledo Edison Company's detailed evaluation of the design of the plant electrical distribution system, including the instrumentation and control pever supplies, to resolve the concerns of IE Bulletin 79 27.

In addition, telephone calls were held between the NRC Staf f and Toledo Edison representatives on October 26, 1988 and November 22, 1988 during which the following nformational copies vere requested:

(4) Normal and emergency procedures for taking the plant from power operation to cold shutdovn.

(5) Facility Change Request (FCR) and Request for Nodification (RFM) coversheets for modifications completed to comply with IE Bulletin 79-27 and other modifications since made to the electrical systems.

8912050209 es11su POR (4 DOCK 05000346 Q

Qll 1HE TOLEDO E04 SON COYPANY ED'SCN PLAZA 300 MAD' SON AVENUE TOLEDO. CH'O 43652

/'

'\\

/

Dockot Nu ber 50-346 License Number NPF-3 Sorial Number 1617 Page 2 In response to these requests, the documents listed in the enclosure have been submitted to Mr. A. V. DeAgazio, NRC/NRR Senior Project Manager. Should further information be required, please contact Mr. R. V. Schrauder, Nuclear Licensing Manager, at (419) 249-2366.

Very truly yours,

/ b-GBK/dle Enclosure cci P. M. Byron, DB-1 NRC Resident Inspector A. B. Davis, Regional Administrator, NRC Region III A. V. DeAgazio, DB-1 NRC Senior Project Manager i

i i

a l

i l

i 4

4 l

i 1

I

',,1 Dock;t Number 50-346 Licensa Number NPF-3 Serial Number 1617 Enclosure Page 1 IE BULLETIN 79-27 INFORMATION PROVIDED TO NRC/NRR 1.

Plant Electrical Single Line Diagrams for Class 1E and Non-Class 1E Equipment:

Title Drawing Number AC Electrical. System One Line Diagram E-1 EH-1 Rev 13 AC Electrical System One Line Diagram E-1 SH-1 Rev 16 250/125V DC and Instrumentation E-7 Rev 11 AC One Line Diagram NNI Power Distribution M-530-278-11 ICS Power Distribution 26209 Rev T4 ICS Power Distribution 263?S Rev 5 NNI Power Distribution (SH 1 of 4) 26296 Rev 7 NNI Power Distribution (SH 2 of 4) 26297 Rev T1 NNI Power Distribution (SH 3 of 4) 26298 Rev 6 "E" Buses 480V Unit Substations One Line E4 SH-1 Rev 20 Diagram "F" Buses 480V Unit Substations One Line E4 SH-2 Rev 23 Diagram Vater Treatment & Turbine Bldg 480V Unit E4 SH-3 Rev 17 Substations One Line Diagram 480V Unit Substation Lighting Distribution E4 SH-4 Rev 20 One Line Diagram Pressurizer & Annulus Heaters 480V Unit E4 SH-5 Rev 7 Substation PPF & FAB Shop 4.16 KV Disconnect One Line Diagram 480 Volt MCC (Non-Essential) One Line Diagram E5 SH-1 Rev 36 480 Volt MCC (Non-Essential) One Line Diagram E5 SH-2 Rev 33 480 Volt MCC (Non-Essential) One Line Diagram E5 SH-3 Rev 22 480 Volt MCC (Non-Essential) One Line Diagram E5 SH-4 Rev 23 490 Volt MCC (Non-Essential) One Line Diagram E5 SH-5 Rev 31 480 Volt AC MCC (Essential) One Line Diagra:n E6 SH-1 Rev 40 480 Volt AC MCC (Essential) One Line Diagrat E6 SH-2 Rev 42 480 Volt AC MCC (Essential) One Line Diagram E6 SH-5 Rev 2 240 VAC and 120 VAC MCC's (Essential)

E9 SH-1 Rev 11 One Line Diagram j

2.

Load Lists of All Class 1E and Non-Class 1E I&C Pover Supply Buses

[

l Balance of Plant Listing

[

Emergency Diesel Generator 1-1 Loading Table, E-1042 Sheet 1, Rev 4

[

Emergency Diesel Gcnerator 1-1 Loading Table E-1042 Sheet 2, Rev 5 Emergency Diesel Generator 1-2 Loading Table, E-1043 Sheets 1 & 2, Rev 4 l

l

[

t

Dockot Number 50-346 Licensa Number NPF-3 Serial Number 1617 Enclosure Page 2 3.

Evaluations Failure Modes and Effects Analysis (FMEA) of the NNI/ICS Electrical Power Supplies at the Davis-Besse Unit 1 Nuclear Power Station (SAI-OR-245-010) dated April 21, 1980 Failure Modes and Effects Analysis of the ICS/NNI Systems at the Davis-Besse Unit 1 Nuclear Power Station dated January 16, 1987

[

4.

Normal and Emergency Procedures DB-PF-02000 (EP-1202.01), Revision 1, RPS, SFAS, SFRCS Trip, or SG Tube Rupture.

DB-0P-06903 (PP1102.10), Revision 00, Plant Shutdown & Cooldown.

5.

Fleid Changes and Modifications Fleid Change Requestr (FCR) which were implemented as a result of the original FMEA and testing:

80-058 80-096 80-100 80-173 80-211 80-230 FCRs and Requests for Modification (RFM) implemented later - some as a result of the updated FMEA:

FCRs RFMs78-527 87-1092 79-439 87-1101 80-208 87-1104 81-189 87-1105 81-242 87-1166 82-023 97-1174 82-173 84-173 84-174 85-260

)86-054 86-123 86-181 i

86-256 87-083 l

87-105 1

i 1