Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 3F1088-13, Forwards Addl Info Completing Util Response to NRC Bulletin 87-002,Suppls 1 & 2,including Mfg Info for safety-related Inventoried & Noninventoried Items Not Provided in Util 8807220 Ltr + (ML20195C952)
- ML20195C953 + (ML20195C953)
- ML20195C955 + (ML20195C955)
- ML20195C956 + (ML20195C956)
- ML20195C957 + (ML20195C957)
- ML20195C958 + (ML20195C958)
- ML20195C960 + (ML20195C960)
- ML20195C963 + (ML20195C963)
- ML20195C967 + (ML20195C967)
- ML20195C968 + (ML20195C968)
- 05000298/LER-1988-025, :on 880928,Div II Primary & Secondary Containment Isolations Occurred.Caused by Coil Failure of Normally Energized Relay in Reactor & Containment Isolation Logic.Failed Relay Coil Replaced + (ML20195C971)
- ML20195C972 + (ML20195C972)
- ML20195C973 + (ML20195C973)
- ML20195C974 + (ML20195C974)
- ML20195C975 + (ML20195C975)
- 05000298/LER-1988-026, :on 880930,momentary Undervoltage Condition on Emergency Transformer Sensed,Resulting in Auto Startup of Diesel Generators 1 & 2.Cause Unknown.Engineering Evaluation to Be Completed & Necessary Mods Made Prior to Startup + (ML20195C976)
- ML20195C977 + (ML20195C977)
- ML20195C979 + (ML20195C979)
- L-98-195, Provides Response to RAI as Requested During 980924 Conference Call to Support Review of LAR 120.LAR Described Unreviewed Safety Question Resulting from Increase in Locked Rotor Accident Dose Consequences + (ML20195C981)
- ML20195C982 + (ML20195C982)
- L-99-090, Forwards Summary Review Completed to Verify Adequacy of Design Basis Accident Thermal Overpressure Protection for BVPS Unit 2 Containment Penetrations,Per Request + (ML20195C983)
- ML20195C984 + (ML20195C984)
- IR 05000352/1988013 + (ML20195C988)
- ML20195C989 + (ML20195C989)
- ML20195C991 + (ML20195C991)
- ML20195C994 + (ML20195C994)
- ML20195C995 + (ML20195C995)
- ML20195C996 + (ML20195C996)
- 05000285/LER-1998-012, :on 980828,inappropriate Approval of Change to H Generation Design Basis Wwas Noted.Caused by Failure to Assess Impact of Proposed USAR Changes.Reviewed & Updated Design Analysis as Needed.With + (ML20195C997)
- ML20195C998 + (ML20195C998)
- ML20195C999 + (ML20195C999)
- ML20195D000 + (ML20195D000)
- ML20195D002 + (ML20195D002)
- 05000304/LER-1985-028, :Not Used + (ML20195D003)
- 05000354/LER-1988-025, :on 880930,both Control Room Emergency Filtration Units Determined Inoperable Due to Surveillance Procedure Not Meeting Requirement of Tech Spec 4.7.2.e.3. Procedure Revised + (ML20195D006)
- ML20195D007 + (ML20195D007)
- LIC-98-0149, Forwards 120-day Response to NRC GL 98-04, Potential for Degradation of ECCS & CSS After LOCA Because of Construction & Protective Coating Deficiencies & Foreign Matl in Containment + (ML20195D010)
- ML20195D011 + (ML20195D011)
- 05000251/LER-1986-010-01, :on 860425,during Performance of Periodic Test Load on 4A 4-kV Bus,Breaker 4AA20 Failed to Close.Caused by Breaker Position Switch 52HH Not Being Actuated.Position Switch Replaced W/Redesigned Actuator & Guide + (ML20195D012)
- ML20195D016 + (ML20195D016)
- ML20195D018 + (ML20195D018)
- PNO-III-86-050, on 860528,at 90% Power,Unit Tripped Following Main Turbine Trip on Overspeed.Caused by Small Leakage in Pressurizer Spray Valve & Letdown Valve.Failure of intermediate-range Detector Under Investigation + (ML20195D019)
- ML20195D020 + (ML20195D020)
- ML20195D021 + (ML20195D021)
- ML20195D022 + (ML20195D022)
- ML20195D023 + (ML20195D023)
- A07538, Forwards Addl Info Re Corrective Actions Taken & Plans for Further Corrective Action Re Items Identified During Insp of Plant Emergency Operating Procedures (Eop).Revs Made to EOPs Eliminate Number of Deficiencies Identified + (ML20195D026)
- ML20195D027 + (ML20195D027)
- ML20195D028 + (ML20195D028)
- ML20195D029 + (ML20195D029)
- ML20195D030 + (ML20195D030)