Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20155E142 + (ML20155E142)
- BSEP-88-1021, Monthly Operating Repts for Sept 1988 for Brunswick Units 1 & 2 + (ML20155E143)
- ML20155E147 + (ML20155E147)
- ML20155E151 + (ML20155E151)
- ML20155E159 + (ML20155E159)
- ML20155E160 + (ML20155E160)
- ML20155E163 + (ML20155E163)
- ML20155E164 + (ML20155E164)
- ML20155E165 + (ML20155E165)
- 05000346/LER-1998-010, :on 980924,manual Reactor Trip Was Noted.Caused by Misdiagnosed Failure of Main FW Control Valve Solenoid Valve.Faulty Solenoid valve,SVSP6B1,was Replaced & Tested. with + (ML20155E170)
- ML20155E171 + (ML20155E171)
- ML20155E174 + (ML20155E174)
- ML20155E175 + (ML20155E175)
- ML20155E179 + (ML20155E179)
- ML20155E180 + (ML20155E180)
- ML20155E181 + (ML20155E181)
- ML20155E182 + (ML20155E182)
- ML20155E183 + (ML20155E183)
- B17520, Informs That NNECO Has Determined That There No Longer Exists Need to Maintain Operator License for Jj Selvidio, License Number OP-11121 + (ML20155E188)
- ML20155E191 + (ML20155E191)
- NRC-88-0134, Special Rept:On 880527,div II Standby Gas Treatment Radiation Exhaust Accident Range Monitor Process Controller Discovered Switching Between Normal & Standby Modes & Declared Inoperable.Caused by Problem in 8K Board + (ML20155E193)
- ML20155E196 + (ML20155E196)
- ML20155E197 + (ML20155E197)
- ML20155E198 + (ML20155E198)
- ML20155E200 + (ML20155E200)
- ML20155E203 + (ML20155E203)
- ML20155E204 + (ML20155E204)
- ML20155E205 + (ML20155E205)
- ML20155E209 + (ML20155E209)
- ML20155E210 + (ML20155E210)
- ML20155E216 + (ML20155E216)
- 05000424/LER-1988-026, :on 880907,electrician Created Short Between Two 120-volt Ac Circuits.Alarms & Indicators Actuated, Including Containment Ventilation Isolation.Caused by Use of Improper Tool.Personnel Reinstructed + (ML20155E217)
- ML20155E222 + (ML20155E222)
- ML20155E223 + (ML20155E223)
- BECO-88-144, Responds to NRC Bulletin 88-008 & Suppls 1 & 2, Thermal Stresses in Piping Connected to Rcs. Review Identified All Connections to Reactor Vessel from Vessel Nozzle to First Valve Capable of Providing Isolation + (ML20155E224)
- ML20155E226 + (ML20155E226)
- ML20155E227 + (ML20155E227)
- ML20155E228 + (ML20155E228)
- ML20155E230 + (ML20155E230)
- ML20155E233 + (ML20155E233)
- ML20155E237 + (ML20155E237)
- ML20155E238 + (ML20155E238)
- ML20155E240 + (ML20155E240)
- ML20155E241 + (ML20155E241)
- ML20155E243 + (ML20155E243)
- ML20155E245 + (ML20155E245)
- ML20155E247 + (ML20155E247)
- ML20155E248 + (ML20155E248)
- ML20155E250 + (ML20155E250)
- ML20155E254 + (ML20155E254)
- 05000366/LER-1998-004-04, :on 981005,condition Prohibited by TS Was Noted.Caused by Personnel Error.Coached Involved Personnel & Briefed Other Technicians on Event.With + (ML20155E255)