Advises That Seismic Qualification Util Group Walkdown to Ensure Seismic Verification of Equipment Will Be Completed in 1990 Through 1991 for Unit 2 & in 1991 Through 1992 for Unit 1
ML20155E254
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 10/07/1988
From: Trzyna G
COMMONWEALTH EDISON CO.
To: Murley T
Office of Nuclear Reactor Regulation
References
5218K, NUDOCS 8810120202
Download: ML20155E254 (1)


Text

_ _ _ - _ _ _ _ - _ _

N Commonwealth Edloon

_ / One FrJ Nabonal Ptaza. CNeago, l'inois J Address Reply to: Post Omco Box 767 V

/ CNcago,Ithros 60690 0767 October 7, 1988 Mr. Thomas E. Murley, Director Of fice of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555

(

Subject:

Zion Station Units 1 and 2 Commitment to Perform Seismic 1

Qualification Utility Group (SQUG)

Walkdown 4

Docket _Non_5tL-121.anL50-104

Reference:

L.C. Shao letter of July 29, 1988 to N.P. Smith

Dear Mr. Murley:

The above referenced letter transmitted a Generic Safety Evaluation Report on a methodology developed by the Seismic Qualification Utility Group (SQUG) for performing seismic verification of equipment.

HRC and SQUG are projected to reach a final agreement on the open issues of the methodology by the middle of 1989. Therefore contingent upon j

the final agreement being reached by the middle of 1989, Zion will complete the scheduled plant walkdowns in 1990 through 1991 for Unit 2 and in 1991 1

through 1992 for Unit 1 and common equipment.

1,

)

If you have any quest 19ns regarding this matter please contact this j

office.

1 very truly yours, I

l A

1 C+

E, i

G. E. Trayna Nuclear Licensing Administrator 1m i

1 cc J. Norris - NRR Zion Resident Inspector l