N Commonwealth Edloon
_ / One FrJ Nabonal Ptaza. CNeago, l'inois J Address Reply to: Post Omco Box 767 V
/ CNcago,Ithros 60690 0767 October 7, 1988 Mr. Thomas E. Murley, Director Of fice of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555
(
Subject:
Zion Station Units 1 and 2 Commitment to Perform Seismic 1
Qualification Utility Group (SQUG)
Walkdown 4
Docket _Non_5tL-121.anL50-104
Reference:
L.C. Shao letter of July 29, 1988 to N.P. Smith
Dear Mr. Murley:
The above referenced letter transmitted a Generic Safety Evaluation Report on a methodology developed by the Seismic Qualification Utility Group (SQUG) for performing seismic verification of equipment.
HRC and SQUG are projected to reach a final agreement on the open issues of the methodology by the middle of 1989. Therefore contingent upon j
the final agreement being reached by the middle of 1989, Zion will complete the scheduled plant walkdowns in 1990 through 1991 for Unit 2 and in 1991 1
through 1992 for Unit 1 and common equipment.
1,
)
If you have any quest 19ns regarding this matter please contact this j
office.
1 very truly yours, I
l A
1 C+
E, i
G. E. Trayna Nuclear Licensing Administrator 1m i
1 cc J. Norris - NRR Zion Resident Inspector l
5218K SS1012O202 SS1007 ADOCKGSOOg5 DR
-.