ML20155E222

From kanterella
Jump to navigation Jump to search
Revised Notification of 981105 Meeting with NEI in Rockville,Md to Continue Discussion on Development of Performance Measures to Be Used by NRC to Aid Assessing EP Area at Operating Npps.Rev Change Meeting Time & Location
ML20155E222
Person / Time
Issue date: 10/30/1998
From: Stewart Magruder
NRC (Affiliation Not Assigned)
To: Essig T
NRC (Affiliation Not Assigned)
References
PROJECT-689 NUDOCS 9811040243
Download: ML20155E222 (4)


Text

-

CHANGES TO MEETING - TIME AND LOCATION October 30, 1998 0

l MEMORANDUM TO: Thomas H. Essig, Acting Chief l

Generic Issues and Environmental Projects Branch 1

Division of Reactor Program Management Office of Nuclear Reactor Regulation FROM:

Stewart L. Magruder, Project Manager Frank Akstulewicz for/

Generic Issues and Environmental Projects Branch Division of Reactor Program Management Office of Nuclear Reactor Regulation

SUBJECT:

NOTICE OF MEETING WITH NUCLEAR ENERGY INSTITUTE (NEI)

AND INDUSTRY REPRESENTATIVES REGARDING PERFORMANCE INDICATORS FOR ASSESSING EMERGENCY PREPAREDNESS PROGRAMS DATE AND TIME:

November 5,1998 100 n.m - 4 30 n m.

8:30'a.m. - 4: 30 p.m.

LOCATION:

U.S. Nuclear Regulatory Coevnission One White Flint North 11555 Rockville Pike Rockville, Maryland Room O 13813 0-16B-6 PURPOSE:

To continue discussion on the development of performance measures to be used by the NRC to aid in assessing the emergency preparedness area at operating nuclear power plants.

PARTICIPANTS:

NELG INDUSTRY R. Sullivan A. Nelson F. Kantor Industry Representatives NRC Representatives Project No. 689 i

l cc: See next page Qistribution: See next page y

l DOCUMENT: G:\\simf}epmtg11.05 d

h' PGEE(h SC:PGkB[

OFFICE SMphrildghp!4 FAkhfbidz NAME 10/30)9[ f 10/30b8 DATE q.m q 9811040243 981030

-r

,a saan ye, um y w,

-- - ~.

_.__ - -.. ~

CHANGES TO MEETING TIME AND LOCATION

  1. 4 %g 4

UNITED STATES

{y")M,j NUCLEAR REGULATORY COMMISSION c

WASHINGTON, D.C. 20666-4001

\\,,,,, #

6 October 30, 1998 MEMORANDUM TO: Thomas H. Essig, Acting Chief Generic Issues and Environmental Projects Branch Division of Reactor Program Management Office of Nuclear Reactor Regulation FROM:

Stewart L. Magruder, Project Manager 1

Generic issues and Environmental Projects ranch i

l Division of Reactor Program Management Office of Nuclear Reactor Regulation

)

SUBJECT:

NOTICE OF MEETING WITH NUCLEAR ENERGY INSTITUTE (NEl)

AND INDUSTRY REPRESENTATIVES REGARDING PERFORMANCE INDICATORS FOR ASSESSING EMERGENCY PREPAREDNESS PROGRAMS DATE AND TIME:

November 5,1998 400-pm-.420-pan,.

8:30 a.m. - 4:30 p.m.

LOCATION:

U.S. Nuclear Regulatory Commission i

One White Flint North 11555 Rockville Pike Rockville, Maryland Room O-138-13 PURPOSE:

To continue discussion on the development of performance measures to be used by the NRC to aid in assessing the emergency preparedness area at operating nuclear power plants.

PARTIC; PANTS:

NBC INDUSTRY j

R. Sullivan A. Nelson F. Kantor Industry Representatives NRC Representatives Project No. 689 cc: See next page Meetings between the NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to " Commission Policy Statement on Staff Meeting Open to the Public " 59 Federal Reaister 48344,9/20/94. Members of the public who wish to attend should contact Randy Sullivan at (301) 415-1123 (rxs3@nrc. gov).

Nuclear Energy Institute Project No. 689 l

cc:

Mr. Ralph Beedle Ms. Lynnette Hendricks, Director Senior Vice President Plant Support and Chief Nuclear Officer Nuclear Energy institute Nuclear Energy Institute Suite 400 i

Suite 400 1776 l Street, NW 1

.1776 i Street, NW Washington. DC 20006-3708 i

Washington, DC 20006-3708 Mr. Alex Marion, Director Mr. Charles B. Brinkman, Director Programs Washington Operations Nuclear Energy institute ABB-Combustion Engineering, Inc.

Suite 400 12300 Twinbrook Parkway, Suite 330 1776 i Street, NW Rockville, Maryland 20852 Washington, DC 20006-3708 i

Mr. David Modeen, Director Engineering Nuclear Energy Institute Suite 400 1776 i Street, NW Washington, DC 20006-3708 Mr. Anthony Pietrangelo. Director Licensing Nuclear Energy Institute Suite 400 1776 l Street, NW Washington, DC 20006-3708 Mr. Nicholas J. Liparulo, Manager Nuclear Safety and Regulatory Activities Nuclear and Advanced Technology Division Westinghouse Electric Corporation P.O. Box 355 Pittsburgh, Pennsylvania 15230 l

L Mr. Jim Davis, Director

' Operations Nuclear Energy Institute Suite 400 17761 Street, NW Washington, DC 20006-3708

~.

l

'*(,

CHANGES TO MEETING - TIME AND LOCATION a

Distribution: Mtg. Notice w/NEl Dated October 30.1998 Hard Cooy Project File PUBLIC l

PGEB R/F l

OGC ACRS SMagruder RSullivan OWFN Receptionist EMBR SCollins/FMiraglia j

PBaranowsky -

Bsheron RZimmerman BBoger JRoe DMatthews -

TEssig PBaranowsky FAkstulewicz -

SMagruder CMiller BZalcman GTracy, EDO PMNS OPA RSullivan FKantor