Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20154S008 + (ML20154S008)
- ML20154S009 + (ML20154S009)
- IR 05000285/1988028 + (ML20154S014)
- ML20154S016 + (ML20154S016)
- U-601200, Responds to Ja Stevens 880418 Request for Addl Info Re Generic Ltr 83-28.Computerized Master Equipment List Data Base Being Developed to Consolidate Classification Info from Listed Documents + (ML20154S017)
- 05000295/LER-1986-006-04, :on 860224,during Functional Test of Halon Fire Protection Sys,Fire Damper Between North & South Cable Penetration Vaults Inoperable Due to Obstruction by Cable. Caused by Personnel Error.Personnel Counseled + (ML20154S018)
- ML20154S019 + (ML20154S019)
- 05000529/LER-1986-002-01, :on 860220,during Cold Shutdown,Train a Main Steam Isolation Sys Actuation Occurred.Caused by Use of Undersized Fuse in 2-4 Logic Trip path.Eight-amp Fuse Installed in Affected Path + (ML20154S021)
- ML20154S022 + (ML20154S022)
- ML20154S023 + (ML20154S023)
- ML20154S025 + (ML20154S025)
- ML20154S026 + (ML20154S026)
- ML20154S027 + (ML20154S027)
- ML20154S030 + (ML20154S030)
- IR 05000382/1985030 + (ML20154S031)
- ML20154S031 + (ML20154S031)
- ML20154S034 + (ML20154S034)
- ML20154S035 + (ML20154S035)
- ML20154S040 + (ML20154S040)
- ML20154S041 + (ML20154S041)
- ML20154S042 + (ML20154S042)
- ML20154S043 + (ML20154S043)
- ML20154S045 + (ML20154S045)
- ML20154S046 + (ML20154S046)
- ML20154S049 + (ML20154S049)
- ML20154S050 + (ML20154S050)
- ML20154S051 + (ML20154S051)
- ML20154S052 + (ML20154S052)
- IR 05000352/1985046 + (ML20154S053)
- ML20154S056 + (ML20154S056)
- ML20154S057 + (ML20154S057)
- ML20154S061 + (ML20154S061)
- ML20154S062 + (ML20154S062)
- 05000271/LER-1998-023, :on 980924,inadequate Review of Engineering Design Change Resulted in CS in-service Testing Valve Not Being Properly Tested.Performed full-stroke Open Test of Both Valves IAW IST Requirement.With + (ML20154S063)
- LIC-98-0143, Requests That New Manager - Nuclear Licensing,Mt Frans Replace Now Assistant Plant Manager - Fort Calhoun Station, JW Tills as Copy Recipient on All Official NRC Correspondence Re Plant.Mailing Address Listed + (ML20154S066)
- ML20154S068 + (ML20154S068)
- ML20154S069 + (ML20154S069)
- ML20154S070 + (ML20154S070)
- ML20154S072 + (ML20154S072)
- ML20154S075 + (ML20154S075)
- ML20154S076 + (ML20154S076)
- ML20154S079 + (ML20154S079)
- ML20154S082 + (ML20154S082)
- ML20154S084 + (ML20154S084)
- ML20154S086 + (ML20154S086)
- ML20154S087 + (ML20154S087)
- ML20154S088 + (ML20154S088)
- ML20154S089 + (ML20154S089)
- IR 05000313/1988028 + (ML20154S090)
- LIC-98-0132, Submits Revised Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions + (ML20154S092)
- ML20154S093 + (ML20154S093)