Forwards SALP Board Rept 50-382/85-30 for 841218-851231. Performance Generally Acceptable.Strength Noted in Areas of Preoperational/Startup Testing,Security & Safeguards & Surveillance.Qa Performance Declined
ML20154S025
Person / Time
Site: Waterford Entergy icon.png
Issue date: 03/20/1986
From: Martin R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Leddick R
LOUISIANA POWER & LIGHT CO.
Shared Package
ML20154S029 List:
References
NUDOCS 8603310278
Download: ML20154S025 (3)


See also: IR 05000382/1985030

Text

- -. . .

, b '

'

/

'

In Reply Refer To: 44g 2 0

Docket: 50-382/85-30 1966

.

Louisiana Power & Light Company

ATTN: R. S. Leddick, Sr. Vice President

Nuclear Operations

, 317 Baronne Street

P.O. Box 60340 ,

New Orleans, Louisiana 70160

l Gentlemen:

,

This refers to the Systematic Assessment of Licensee Performance (SALP) Board

1 Report for Waterford Steam Electric Station, Unit 3. The SALP Board met on

February 27, 1986, to evaluate the performance of your facility for the period

December 18, 1984, to December 31, 1985. The performance analyses and

resulting evaluations are documented in the enclosed SALP Board Report.

The performance of your facility was evaluated in the selected functional areas

identified in Section IV of the enclosed SALP Board Report. Caution should be

exercised when comparing performance for the current SALP period with the

previous SALP period. Plant activities have changed from principally construction

and preoperational testing to startup testing and operations. These changes in

the focus of facility activities make direct comparison of performance in

functional areas difficult.

j Overall, we find that your performance of licensed activities generally is

acceptable and directed toward safe facility operation. Particular strength

was noted in the areas of Preoperational/Startup Testing, Security and

Safeguards, and Surveillance. In addition, an improvement was noted in Emergency

Preparedness. A decrease in overall performance was noted in the area of

Quality Programs and Administrative Controls Affecting Quality, which declined

from a Category 1 to a Category 2, and Plant Operations, which . declined from a

Category 2 to a Category 3. Maintenance was again rated Category 3 based on the

NRC findings that indicate that your maintenance program has not been properly

implemented due to weaknesses in procedural development and implementation. It

was.noted that, at the end of the rating period,-performance' appeared to be

improving in the maintenuce area.

The board discussed at length whether the operations area should be Category 2

or Category 3 before concluding the appropriate description was Category 3. l

This decision was based on the frequency of reactor trips and LERs involving ,

human error and limited corrective actions that did not appear to adequately. l

4

identify root causes to operational problems. You should direct specific  ;

attention to the Board's recommendations in this area. .,

RIV: SRI RPB/C RP Cl PB/

b"JGLuehman/ rc HFburid- GL le EGagliardo

b y/' /86 ' / ./86 '3//9/86 3/( /86 ,

,

DRSPth

EHJohnson

DRS

RL

,

art.

RA

RDMa M' V

/h

1/yi/86 6/y/86 y /g /86 f ,

j

B603310278 860320

PDR ADOCK 05000382 l[ -

G PDR

-

. - --

it . _ _ ~ ~. __ _ . _ - - _ _ _ . .

.. - -- - . ._- -

- -

<v

Louisiana Power & Light Company -2-

During a telephone conference with you on March 17, 1986, a management meeting

was scheduled for April 1,1986 to discuss the SALP Board Report. We request

that you provide a written response within 30 days af ter our meeting addressing

your plans to improve performance in t!'e areas of Plant Operations and

Maintenance.

Comments which you may submit are not subject to the clearance procedures of

the Office of !!anagement and Budget as required by the Paperwork Reduction Act

of 1980, PL 96-511.

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,  !

]J,;m!

' '

" P d b'

'

"in

_

Robert D. Martin

Regional Administrator

Enclosures:

Appendix - NRC SALP Board Report 50-382/85-30

Attachment 1 - NRR Supplement

cc w/ enclosures:

Louisiana Power & Light Company l

ATTN: G. E. Wuller, Onsite I

Licensing Coordinator

P. O. Box B

Killona, Louisiana 70066

Louisiana Power & Light Company

ATTN: R. P. Barkhurst, Plant Manager

P. O. Box B

Killona, Louisiana 70066

Middle South Services

ATTN: Mr. R. T. Lally

P. O. Box 61000

New Orleans, Louisiana 70161

,

Louisiana Power & Light Company

ATTN: K. W. Cook, Nuclear Support

and Licensing Manager

317 Baronne Street

P.O. Box 60340

New Orleans, Louisiana 70160

Louisiana Radiation Control Program Director

- _ _ __ _ _ _ _

e w

Louisiana Power & Light Company -3-

bcc distrib. by RIV:

  • RPB DRSP
  • RSB All RRIs (10)
  • EP&RPB Records Center, IllP0
  • RIV File J. M. Taylor, D/IE ~

Chmn. N. J. Palladino (MS: H-1144) *Section Chief, RPB/C

Comm. P. M. Roberts (MS: H-1149) R. D. Martin, RA

Comm. J. K. Asselstine (MS: H-1149) * MIS System

Comm. F. M. Bernthal /MS: H-1149) *RSTS Operator

Comm. L. W. Zech (ftS: H-1149) D. Crutchfield, NRR

E. J. Reis, OELD

  • w/766