ML20154S051
| ML20154S051 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 09/26/1988 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Campbell G ARKANSAS POWER & LIGHT CO. |
| Shared Package | |
| ML20154S055 | List: |
| References | |
| NUDOCS 8810040426 | |
| Download: ML20154S051 (2) | |
See also: IR 05000313/1988028
Text
-
,
.
' .
'
-
,
bbPIb JE3
In Reply Refer To:
Dockets:
50-313/88-28
'.
50-368/88-28
Arkansas Power & Light Company
ATTN: Mr. Gene Campbell
Vice President, Nuclear
Operations
,
P.O. Box 551
Little Rock, Arkansas 72203
Gentlemen:
,
This refers to the inspection conducted by Messrs. T. O. McKernon and
,
R. V. Azua of this office during the period August 22-26, 1988, of activities
l
authorized by NRC Operating License DPR-51 and NPF-6 for the Arkansas Nuclear
One facility, and to the discussion of our findings with Mr. J. D. Vandergrift
and other members of your staff at the conclusion of the inspection.
Areas examined during the inspection included monthly surveillance test
witnessing, operational safety verification followup to previous inspection
findings, review of 10 CFR Part 21 items, and onsite followup of events.
Within these areas, the inspection consisted of selective examination of
.
'
procedures and representative records, interviews with personnel, and
i
observations by the NRC inspectors. The inspection findings are documented in
t
,
the enclosed inspection report.
During this inspection, it was found that certain of your activities were in
,
'
violation of NRC requirements.
Consequently, you are required to respond to
this violation, in writing, in accordance with the provisions of Section 2.201
l
of the NRC's "Rules of Practice," Part 2. Title 10. Code of Federal
Regulations. Your response should be based en the specifics contained in the
i
Notice of Violation enclosed with this letter.
,
We have also examined actions you have taken with regard to previously
!
identified inspection findings.
The status of these items is identified in
"
paragraph 2 of the enclosed report.
l
The response directed by this letter and the accompanying Notice is not subject
[
to the clearance procedures of the Office of Management and Budget as required
t
by the Paperwork Reduction Act of 1980 PL 96-511.
l
'
C:TPS
g
D
hl
I
RIV:RI
RI
RVAzua
N <
WCSeidle
J
oan
L
lln
l
N
TOMcKernon
(l /9788
7 //r/88
9 // 4 88
'l //7/88
q /gj/88
r
1
I
.
l
.
L
i
!
l
!
8s10o40426 esons
ADOCK 05000313
-C k
Q
- h
'
r
l
N
--
-
-
-
- _ _ _ _ .
- _ _ _ _ _ _ _
_ - _ _ _
_
'
,
<
'
.
,
i
Arkansas Power & Light Company
-2-
l
,
I'
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
e
'
'
Uric,i >J fjigne.t ;;y
u. E A a g,
.
L. J. Callan, Director
1
Division of Reactor Projects
-
i
Enclosures:
i
i
1.
Appendix A - Notice of Violation
!
2.
Appendix B - NRC Inspection Report
50-313/88-28
!
50-368/88-28
l
.
i
!
cc w/ enclosures:
i
l
Arkansas Nuclear One
ATTN:
J. M. Levine, Director
Site Nuclear Operations
<
P.O. Box 608
i
.
Russellville Arkansas 72801
f
Arkansas Radiation Control Program Director
j
f
!
i
}
bec distrib. by RIV.
- RRI
- R. D. Martin, RA
[
l
- RPB-DRSS
- SectionChief(DRP/A)
r
i
Lisa Shea, RM/ALF
- RIV File
l
l
- DRP
- MIS System
[
- RSTS Operator
- Project Engineer. DRP/A
!
.
- C. Harbuck, NRR Project Manager *DRS
f
1
!
- w/766
,
i
!
!
4
!
l
!
l
<
i
,
f
4
!
!
--.=