Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20154P312 + (ML20154P312)
- IR 05000245/1988200 + (ML20154P313)
- ML20154P317 + (ML20154P317)
- ML20154P318 + (ML20154P318)
- 05000458/LER-1988-019, :on 880827,fuel Bldg Charcoal Filtration Sys Initiated.Caused by Technicians Lifting Wrong Leads in Junction Box Adjacent to RM-80 Control Cabinet.Technicians Retrained & Proper Leads Lifted + (ML20154P319)
- ML20154P320 + (ML20154P320)
- ML20154P322 + (ML20154P322)
- ML20154P324 + (ML20154P324)
- ML20154P325 + (ML20154P325)
- PY-CEI-NRR-0916, Responds to NRC Bulletin 88-008, Thermal Stresses in Piping Connected to Rcs. Piping Connected to Plant RCS Not Subj to Fatigue Factors Stated in Bulletin & Remains in Compliance, Per GDC 14 of 10CFR50,App a + (ML20154P326)
- ML20154P327 + (ML20154P327)
- ML20154P328 + (ML20154P328)
- ML20154P329 + (ML20154P329)
- ML20154P330 + (ML20154P330)
- ML20154P331 + (ML20154P331)
- ML20154P332 + (ML20154P332)
- ML20154P333 + (ML20154P333)
- ML20154P336 + (ML20154P336)
- ML20154P338 + (ML20154P338)
- ML20154P340 + (ML20154P340)
- ML20154P342 + (ML20154P342)
- ML20154P344 + (ML20154P344)
- ML20154P346 + (ML20154P346)
- ML20154P348 + (ML20154P348)
- ML20154P350 + (ML20154P350)
- ML20154P351 + (ML20154P351)
- ML20154P356 + (ML20154P356)
- ML20154P359 + (ML20154P359)
- ML20154P360 + (ML20154P360)
- ML20154P364 + (ML20154P364)
- PNO-III-88-050, on 880526,two Vials of C-14 Reported Missing. Licensee Believes Vials Inadvertently Disposed of During Lab Cleanup & Buried in Sanitary Landfill.Region III to Perform Onsite Insp Upon Receipt of Rept + (ML20154P365)
- ML20154P366 + (ML20154P366)
- ML20154P368 + (ML20154P368)
- 05000344/LER-1988-008, :on 880413,pressurizer Safety Valve (Psv) Setpoint Found out-of-tolerance During Surveillance Testing. Caused by Deficiencies in Test Procedure.Setpoint Adjusted, Valve Retested & Procedure Revised + (ML20154P369)
- B17500, Forwards Addendum 1 to Rev 16 to FSAR in Form of Replacement Pages,Per 10CFR50.71(e)(2)(i).Addendum 1 to Annual Rept Also Included + (ML20154P370)
- JAFP-88-0492, Informs That Util Will Provide Response to Suppl 1 of IE Bulletin 85-003 Incorporating Results of BWR Owners Group Evaluation by 880819 + (ML20154P371)
- ML20154P372 + (ML20154P372)
- ML20154P374 + (ML20154P374)
- ML20154P382 + (ML20154P382)
- ML20154P385 + (ML20154P385)
- ML20154P386 + (ML20154P386)
- ML20154P389 + (ML20154P389)
- ML20154P390 + (ML20154P390)
- ML20154P396 + (ML20154P396)
- ML20154P399 + (ML20154P399)
- IA-98-323, First Final Response to FOIA Request for Records.Records in App a Available in Pdr.Records in App B Partially Withheld (Ref FOIA Exemption 3) + (ML20154P401)
- ML20154P401 + (ML20154P401)
- NRC-88-0232, Corrects Response to SALP Rept 50-341/88-01.Corrective Actions:Task List Used to Develop Operator Training Programs Will Be Completed by 881231 & Safety Sys Functional Insp Will Be Expanded + (ML20154P403)
- ML20154P405 + (ML20154P405)
- ML20154P406 + (ML20154P406)
- ML20154P409 + (ML20154P409)